The process of risk assessment in the build-operate transfer (BOT) project is very important to identify and analyze the risks in order to make the appropriate decision to respond to them. In this paper, AHP Technique was used to make the appropriate decision regarding response to the most prominent risks that were generated in BOT projects, which includes a comparison between the criteria for each risk as well as the available alternatives and by mathematical methods using matrices to reach an appropriate decision to respond to each risk.Ten common risks in BOT contracts are adopted for analysis in this paper, which is grouped into six main risk headings.The procedures followed in this paper are the questionnaire method to assign the weights of each criterion and each alternative based on the evaluations of 10 experts in BOT contracts after building the questionnaire model.The appropriate decision was reached to respond to each risk, and then the best measures taken were made based on literature reviews of previous research regarding the procedures for risk response plans.
In this research, Fuzzy Analytic Hierarchy Process technique is applied (Fuzzy AHP) which is one of multi-criteria decision making techniques to evaluate the criteria for urban planning projects, the project of developing master plan of Al-Muqdadiyah city to 2035 has been chosen as a case study. The researcher prepared a list of criteria in addition to the authorized departments criteria and previous researches in order to choose optimized master plan according to these criteria. This research aims at employing the foundations of (Fuzzy AHP) technique in evaluating urban planning criteria precisely and flexible. The results of the data analysis to the individuals of the sample who are specialists, in this aspect. The la
... Show MoreMeasurement of construction performance is essential to a clear image of the present situation. This monitoring by the management team is necessary to identify locations where performance is exceptionally excellent or poor and to identify the primary reasons so that the lessons gained may be exported to the firm and its progress strengthened. This research attempts to construct an integrated mathematical model utilizing one of the recent methodologies for dealing with the fuzzy representation of experts’ knowledge and judgment considering hesitancy called spherical fuzzy analytic hierarchy process (SFAHP) method to assess the contractor’s performance per the project performance pa
Objective(s): To identify the relationship between demographic characteristics of patients with renal
failure and to find out the relationship between some risk factors like (family history, alcohol drinking,
smoking and chronic disease) with renal failure patients.
Methodology: Case control study design was carried out in order to achieve the objectives of the
study by using the assessment technique in Baghdad teaching hospital from March 5
th, 2017 to October
10th
, 2017, The sample was (cases & control) sample, present study include 200 cases, 100 was case
study the patient who entered in Baghdad teaching hospital, while another 100 was control study. The
data was collected by interview questionnaire inc
In order to take measures in controlling soil erosion it is required to estimate soil loss over area of interest. Soil loss due to soil erosion can be estimated using predictive models such as Universal Soil Loss Equation (USLE). The accuracy of these models depends on parameters that are used in equations. One of the most important parameters in equations used in both of models is (C) factor that represents effects of vegetation and other land covers. Estimating land cover by interpretation of remote sensing imagery involves Normalized Difference Vegetation Index (NDVI), an indicator that shows vegetation cover. The aim of this study is estimate (C) factor values for Part of Baghdad city using NDVI derived from satellite Image of Landsat-7
... Show MoreCost estimation is considered one of the important tasks in the construction projects management. The precise estimation of the construction cost affect on the success and quality of a construction project. Elemental estimation is considered a very important stage to the project team because it represents one of the key project elements. It helps in formulating the basis to strategies and execution plans for construction and engineering. Elemental estimation, which in the early stage, estimates the construction costs depending on . minimum details of the project so that it gives an indication for the initial design stage of a project. This paper studies the factors that affect the elemental cost estimation as well as the rela
... Show MoreObjective: to assess the risk factors of coronary artery disease patients.
Methodology: A non-probability (purposive) sample of (100) patients. The study population consisted of
a sample of adults from both genders whose ages were 30 years and more, and was newly diagnosed as
having CAD by coronary angiography in the cardiac catheterization unit of An Nasiriyah heart center.
Results: The result of the study showed that the most common modifiable risk factors were low HDL-C
levels (58%), smoking (53%), hypertension (46%), diabetes mellitus (34%), obesity (30%), high
triglycerides (19%), hypercholesterolemia (17%), and high LDLC (14%). All these factors were positively
and significantly associated with the development
The risk assessment for three pipelines belonging to the Basra Oil Company (X1, X2, X3), to develop an appropriate risk mitigation plan for each pipeline to address all high risks. Corrosion risks were assessed using a 5 * 5 matrix. Now, the risk assessment for X1 showed that the POF for internal corrosion is 5, which means that its risk is high due to salinity and the presence of CO, H2S and POF for external corrosion is 1 less than the corrosion, while for Flowline X2 the probability of internal corrosion is 4 and external is 4 because there is no Cathodic protection applied due to CO2, H2S and Flowline X3 have 8 leaks due to internal corrosion so the hazard rating was very high 5 and could be due to salinity, CO2, fluid flow rate
... Show MoreThe Ground Penetrating Radar (GPR) is frequently used in pavement engineering
for road pavement inspection. The main objective of this work is to validate
nondestructive, quick and powerful measurements using GPR for assessment of subgrade
and asphalt /concrete conditions. In the present study, two different antennas
(250, 500 MHz) were used. The case studies are presented was carried in University
of Baghdad over about 100m of paved road. After data acquisition and radar grams
collection, they have been processed using RadExplorer V1.4 software
implementing different filters with the most effective ones (time zero adjustment and
DC removal) in addition to other interpretation tool parameters.
The interpretatio