Preferred Language
Articles
/
iqjmc-539
Unintended durotomy during degenerative lumbar spine surgery (Incidence and management).
...Show More Authors

Background: Unintended durotomy is an infrequent but well-recognized Complication during degenerative lumbar spine surgery. The current literatures report a wide variation in incidence of durotomy during degenerative lumbar spine surgery.
Objective: To assess the incidence, treatment, clinical consequence, complications of unintended durotomy during degenerative lumbar spine surgery, and the results of 2-24 months clinical follow-up.
Patients and Methods: A prospective study was conducted on 264 patients who underwent degenerative lumbar spine surgery performed in Al-Sheikh Zayed Hospital and private nursing home hospital- medical city in Baghdad from January 2011 to June 2012. Patients managed by spine fixation were excluded from this study.
Results: The incidence of unintended durotomy during spine surgery was 8.33% (22 of 264 cases). The incidence varies according to the type of surgery being performed (6.66% in primary discectomy, 12.5% in decompressive laminectomy and 21.73% in revision surgery). Unintended durotomy was more common in revision surgery compared with primary surgery (21.73% vs 7.05%; p < .001), and it was significantly more common among elderly patients (17.39% in patients > 60 years old; p = .006). Most of the durotomies were managed by primary repair. A mean follow-up of 6 months showed good long-term clinical results.
Conclusions: All unintended durotomies must be repaired primarily. Durotomies that were immediately recognized and treated did not lead to any significant sequelae at a mean follow-up of 6 months.

Crossref
View Publication Preview PDF
Quick Preview PDF
Publication Date
Sun Jan 14 2018
Journal Name
Journal Of Engineering
Efficient Cost Management in the Housing Projects
...Show More Authors

The cost management of cost indicators in housing projects, on the level of planning and design, is the most important quality indicators, for adoption of strategies of planning and design efficient in managing these indicators. So this research points out the need to highlight the most effective and influential cost indicators in housing projects, and to determine strategies in the management of these indicators in order to raise the efficiency of housing projects quality, to seemly the income level target group, taking into consideration the quality of housing standards, to achieve the basic requirements of housing. This paper highlights the importance of the cost  management, the types of housing cost, the method

... Show More
View Publication Preview PDF
Publication Date
Fri Dec 01 2023
Journal Name
Al-khwarizmi Engineering Journal
Secure Seaport Management System using Blockchain Technology
...Show More Authors

Worldwide, shipping documents are still primarily created and handled in the traditional paper manner. Processes taking place in shipping ports as a result are time-consuming and heavily dependent on paper. Shipping documents are particularly susceptible to paperwork fraud because they involve numerous parties with competing interests. With the aid of smart contracts, a distributed, shared, and append-only ledger provided by blockchain technology allows for the addition of new records. In order to increase maritime transport and port efficiency and promote economic development, this paper examines current maritime sector developments in Iraq and offers a paradigm to secure the management system based on a hyper-ledger fabric blockchain p

... Show More
View Publication Preview PDF
Crossref
Publication Date
Sun Jan 01 2023
Journal Name
4th International Conference On Distributed Sensing And Intelligent Systems (icdsis 2023)
EcoSavvy: revolutionizing waste management in smart cities
...Show More Authors

View Publication
Crossref
Publication Date
Mon Apr 01 2019
Journal Name
Journal Of Educational And Psychological Researches
Life Management Strategies among Mosul University Academics
...Show More Authors

The study aims to measure life management (in its various approaches) among   university academics and to identify the differences among life management strategies (in its various approaches) in regard of gender (male, female), field of education (scientific, humanitarian) and title (assistant lecturer, lecturer, assistant professor, and professor). The study sample consisted of (246) male and female academics from four colleges (Arts, Science, Science education, and Humanitarian Science Education). To achieve the goals of the study, the researchers used the Freund & Baltes (2002) life-management strategies scale after translating it and determining its parameters of reliability and validity. The statistical analysis of the

... Show More
View Publication Preview PDF
Publication Date
Sun Apr 03 2011
Journal Name
Journal Of The Faculty Of Medicine Baghdad
Management of Esophageal Foreign Bodies, retrospective study.
...Show More Authors

Background: Foreign body impaction in the esophagus is a common problem. Our Objective is to draw conclusions from a retrospective over viewing a number of cases to assess current methods of management and to come out with recommendation from collected experience.
Patient and method: A retrospective study of (62) patients admitted to the Department of Thoracic and Cardiovascular Surgery at Medical City Teaching Hospital from January 2002 to December 2004 with history of foreign body swallowing and impaction. Six patients excluded from the (62) patients after having negative esophgoscpic findings. On presentation, history about type and time of ingestion, associated signs and symptoms were recorded, x- ray

... Show More
View Publication Preview PDF
Crossref
Publication Date
Sat Dec 01 2012
Journal Name
Journal Of Economics And Administrative Sciences
Scheduling Critical Activities of Stochastic Projects Management
...Show More Authors

In this paper, we consider the problem of stochastic project network when some or all activities are interrupted. An approach has been built to schedule the critical activities, by constructing some expressions based on the project lateness costs due to the interruption activities. Two simple example are presented to validate our approach.

Key words: Project Management, Project scheduling, Stochastic activity duration, Stochastic PERT.    

Introduction

   Recently, Projects planning and optimal timing, under uncertainty are extremely critical for many organizations, see [19]. Having an effective mathematical model wi

... Show More
View Publication Preview PDF
Crossref
Publication Date
Sat Jul 06 2019
Journal Name
Journal Of Legal Sciences
Temporary management of funds placed under custody
...Show More Authors

The interim administration is an application of the idea of ​​management required by certain circumstances, which are necessary and urgent, and most laws, especially the laws we have compared (the French Civil Code and the Egyptian civil law and the Iraqi civil law) did not regulate the idea of ​​interim administration accurately, This idea is interrelated, but this idea is highlighted whenever a temporary administrator is needed. It is often necessary to maintain a financial or financial burden that is impossible for the owner to manage his own money for one reason or another, the appointment of a temporary manager who manages these funds, we find the legislator resort in such a case to appoint a manager to temporarily save and ma

... Show More
Publication Date
Mon Dec 25 2017
Journal Name
Biomedical And Pharmacology Journal
Evaluation of Crestal Bone Loss and Alkaline Phosphatase Level in Saliva According To Different Flap Designs in Single-Tooth Dental Implant Surgery (A Clinical Comparative Study)
...Show More Authors

View Publication
Scopus (3)
Crossref (3)
Scopus Crossref
Publication Date
Mon Mar 01 2021
Journal Name
Journal Of Physics: Conference Series
Annual Behavior of Electron Density and Critical Frequency Parameters During Maximum and Minimum Years of Solar Cycles 22, 23 and 24
...Show More Authors
Abstract<p>In this work, the annual behavior of critical frequency and electron density parameters of the ionosphere have been studied for the years (1989, 2001 and 2014) and (1986, 1996 and 2008) which represent the maximum and minimum of years in the solar cycles (22, 23 and 24) respectively. The annual behavior of (Ne, f<sub>o</sub> ) parameters have been investigated for different heights of Ionosphere layer (100 -1000) Km. The dataset was created both of critical frequency and electron density parameters by using the international reference ionosphere model (IRI-2016 model). This study showed result that during the maximum solar cycles the values of the (Ne) parameter change with </p> ... Show More
View Publication
Scopus (4)
Crossref (2)
Scopus Crossref
Publication Date
Mon Oct 01 2018
Journal Name
Journal Of Economics And Administrative Sciences
Integration of Dissolved Analysis and Total Quality Management to reduce costs and improve product quality
...Show More Authors

there is a need to use the teardown Technique in a various fields and different motives and used often by economic units as a technique to help other techniques for example, used by some economic units for the analysis of other economic units of products in order to work on the development of products and look for opportunities to improve product quality and avoid product errors competitor or reduce its costs, in addition to the services provided by quality control is used ISO 17025 integration with unassembled analysis to adjust the quality of the product by comparing the pieces produced with designed models that are also the product as a whole compared with the original design

... Show More
View Publication Preview PDF
Crossref