Preferred Language
Articles
/
joe-510
Efficient Cost Management in the Housing Projects
...Show More Authors

The cost management of cost indicators in housing projects, on the level of planning and design, is the most important quality indicators, for adoption of strategies of planning and design efficient in managing these indicators. So this research points out the need to highlight the most effective and influential cost indicators in housing projects, and to determine strategies in the management of these indicators in order to raise the efficiency of housing projects quality, to seemly the income level target group, taking into consideration the quality of housing standards, to achieve the basic requirements of housing. This paper highlights the importance of the cost  management, the types of housing cost, the method of  control and the most important planning and design strategies to be adopted in order to achieve efficient cost management in housing projects. One local project under construction was selected as case study, to evaluate the application of the indicators the efficiency of the cost management on planning and design levels.

View Publication Preview PDF
Quick Preview PDF
Publication Date
Sat Aug 12 2017
Journal Name
Journal Of Engineering
Regulations Enforcement Mechanisms for Sustainable Housing Projects
...Show More Authors


 

View Publication Preview PDF
Publication Date
Fri Mar 19 2021
Journal Name
Periodicals Of Engineering And Natural Sciences (pen)
New cost control techniques in mega construction projects
...Show More Authors

View Publication
Scopus (3)
Crossref (1)
Scopus Crossref
Publication Date
Sat Feb 12 2022
Journal Name
Engineering, Technology & Applied Science Research
Investigating the Causes of Poor Cost Control in Iraqi Construction Projects
...Show More Authors

Controlling cost in construction projects is an essential issue. This study investigates the most critical problems that cause weakness in cost control in Iraqi construction projects. The quantitative technique was used by conducting a survey directed to professionals who work on construction projects. One hundred and sixty-four questionnaire forms were distributed to private sector companies, government companies, and government institutions, and the responses were subjected to the required statistical analysis. The results indicate that the most influential factors are the weakness in keeping up with the use of modern concepts, methods, and technologies, the delay in receiving the amounts due for work done from the owner, fluctuat

... Show More
View Publication
Crossref (6)
Crossref
Publication Date
Sun Jan 01 2023
Journal Name
Journal Of Engineering
Evaluation of the Current Status of the Cost Control Processes in Iraqi Construction Projects
...Show More Authors

One of the most important problems of Iraqi construction projects is the cost variances, so it is important to identify the problems and shortcomings that cause poor cost control. Through the utilization of questionnaires, the study evaluated how project costs were managed and reported. The questionnaire was distributed to 180 professionals working in the Iraqi construction sector, with a response rate of 91%. The results showed that a high percentage of projects are implemented with a difference between real and estimated costs, and the process of documenting cost data needs to be more secure. On the other hand, there is a weakness in providing the necessary work structure information to monitor costs and a lack of proc

... Show More
View Publication Preview PDF
Crossref (2)
Crossref
Publication Date
Mon Aug 01 2016
Journal Name
Journal Of Engineering
Application Artificial Forecasting Techniques in Cost Management (review)
...Show More Authors

For the duration of the last few many years many improvement in computer technology, software program programming and application production had been followed with the aid of diverse engineering disciplines. Those trends are on the whole focusing on synthetic intelligence strategies. Therefore, a number of definitions are supplied, which recognition at the concept of artificial intelligence from exclusive viewpoints. This paper shows current applications of artificial intelligence (AI) that facilitate cost management in civil engineering tasks. An evaluation of the artificial intelligence in its precise partial branches is supplied. These branches or strategies contributed to the creation of a sizable group of fashions s

... Show More
View Publication Preview PDF
Publication Date
Wed Jan 01 2020
Journal Name
Periodicals Of Engineering And Natural Sciences
Using modified earned value for cost control in construction projects
...Show More Authors

Scopus (7)
Scopus
Publication Date
Sat Jan 01 2022
Journal Name
Journal Of Engineering
Developing Crisis Management System for Construction Projects in Iraq
...Show More Authors

Construction is a complicated process that takes place in an almost uncontrollable environment. Although projects can be carefully planned in advance in principle, there is a chance that unforeseen events and crises can disrupt these plans, affecting project development. Because the initial investment expenditures in construction projects are so large, they may be quickly influenced by crises, resulting in significant financial losses. The 2014 financial crisis was one of the most prominent crises that Iraq faced, which significantly impacted various activities in general and the construction industry in particular. Despite the importance of crisis management systems, the researchers found a great lack of local studies l

... Show More
View Publication Preview PDF
Crossref (6)
Crossref
Publication Date
Mon Feb 01 2021
Journal Name
Journal Of Engineering
Assessment of the Cost and Time Impact of Variation Orders on Construction Projects in Sulaimani Governorate
...Show More Authors

Variation orders are an on-going phenomenon in construction and industry projects worldwide, particularly in the province of Sulaimani, where the project's damage from cost and schedule overrun because of variation orders. However, the effect on project costs and time overrun of variation order has yet to be identified. This study evaluates the impact of variation orders on the cost and time off in the Sulaimani governorate. Two hundred twenty-eight projects from various construction sectors built between 2007-2012 were adopted to calculate the contract cost and schedule overruns due to variation orders. Data analysis was applied in the study were descriptive statistics. One-way ANOVA was also applied to determine w

... Show More
View Publication Preview PDF
Crossref (6)
Crossref
Publication Date
Sat Jan 01 2022
Journal Name
Archives Of Civil Engineeringthis Link Is Disabled
Factors affecting time and cost trade-off in multiple construction projects
...Show More Authors

Scopus (3)
Scopus
Publication Date
Sun Jan 01 2023
Journal Name
Journal Of Engineering
Artificial Neural Network Models to Predict the Cost and Time of Wastewater Projects
...Show More Authors

Infrastructure, especially wastewater projects, plays an important role in the life of residential communities. Due to the increasing population growth, there is also a significant increase in residential and commercial facilities. This research aims to develop two models for predicting the cost and time of wastewater projects according to independent variables affecting them. These variables have been determined through a questionnaire distributed to 20 projects under construction in Al-Kut City/ Wasit Governorate/Iraq. The researcher used artificial neural network technology to develop the models. The results showed that the coefficient of correlation R between actual and predicted values were 99.4% and 99 %, MAPE was

... Show More
View Publication Preview PDF
Crossref (1)
Crossref