In this study, a preliminary economic feasibility study of the project of wind power at the site of Al-Shehabi (Wasit-Iraq) was conducted using measured wind data at altitudes of 10, 30, 50 and 52 m per 10 minutes. For the purpose of comparison, data from NASA were used at the same location at 50 m height. The lowest unit cost of electricity from wind energy was found to be 0.028 $/Kwh and 0.0399 $/Kwh by using the standard methodologies of Levelized Cost of Energy (LCOE) equation and Net Present Value (NPV) procedure, respectively. Furthermore, RETScreen software was used to perform the economic prefeasibility study of a proposed wind farm. The study concludes that this site is economically feasible if a wind farm with 5.0 MW of ten wind turbines (EWT DW54) was established, with an NPV of $11,309,956, after-tax IRR of 24.7%, a simple payback period of 6.1 years, and a capacity factor of 38.34%. Finally, this wind farm development will result in a reduction in greenhouse gases of 31876 tCO2 per year. The sensitivity and risk analysis were performed and guarantee the safety of specified financial input parameters values.
The calibration of a low-speed wind tunnel (LSWT) test section had been made in the present work. The tunnel was designed and constructed at the Aerodynamics Lab. in the Mechanical Engineering Department/University of Baghdad. The test section design speed is 70 m/s. Frictional loses and uniformity of the flow inside the test section had been tested and calibrated based on the British standards for flow inside ducts and conduits. Pitot-static tube, boundary layer Pitot tube were the main instruments which were used in the present work to measure the flow characteristics with emphasize on the velocity uniformity and boundary layer growth along the walls of the test section. It is found that the maximum calibrated velocity for empty test s
... Show MoreThe interest in green energy in recent years is very noticeable, as this energy is a very important alternative that can replace fuel in many applications, most notably electric power generation, so work must be done to develop a form of this energy such as wind energy by working on the development of turbines. The DMST method provided by Qblade software is an integrated tool for making a simulation of a vertical axis wind turbine (VAWT). The simulation was carried out on vertical axis wind turbines, designing turbine blades according to symmetrical NACA0018, and calculating some parameters such as power, torque and power coefficient. It is found that this type of turbine can be improved by treating the blade edges that cont
... Show MoreCriteria to be met in selecting the obtimal areas for generating alternative electric energy from wind
The main objective of this paper is present a novel method to choice a certain wind turbine for a specific site by using normalized power and capacity factor curves. The site matching is based on identifying the optimum turbine rotation speed parameters from turbine performance index (TPI) curve, which is obtained from the higher values of normalized power and capacity factor curves. Wind Turbine Performance Index a new ranking parameter, is defined to optimally match turbines to wind site. The relations (plots) of normalized power, capacity factor, and turbine performance index versus normalized rated wind speed are drawn for a known value of Weibull shape parameter of a site, thus a superior method is used for Weibull parameters estima
... Show MoreIn this paper, the 5 minutes measured wind speed data for year 2012 at 10 meter height for Tweitha have been statically analyzed to assess the time of wind turbine electrical power generation. After collection Tweitha wind data and calculation of mean wind speed the cumulative Weibull diagram and probability density function was ploted, then each of cumulative Weibull distribution, cut-in and furling turbine wind speed could be used as a mathematical input parameters in order to estimate the hours of electrical power generation for wind turbine during one day or one year. In Tweitha site, found that the average wind speed was (v= 1.76 m/s), so five different wind turbines were be selected to calculate hours of electrical generation for A
... Show MoreThe calibration of a low-speed wind tunnel (LSWT) test section had been made in the present work. The tunnel was designed and constructed at the Aerodynamics Lab. in the Mechanical Engineering Department/University of Baghdad. The test section design speed is 70 m/s. Frictional loses and uniformity of the flow inside the test section had been tested and calibrated based on the British standards for flow inside ducts and conduits. Pitot-static tube, boundary layer Pitot tube were the main instruments which were used in the present work to measure the flow characteristics with emphasize on the velocity uniformity and boundary layer growth along the walls of the test section. It is found that the maximum calibrated velocity for empty test sect
... Show MoreIn this research, the electrical characteristics of glow discharge plasma were studied. Glow discharge plasma generated in a home-made DC magnetron sputtering system, and a DC-power supply of high voltage as input to the discharge electrodes were both utilized. The distance between two electrodes is 4cm. The gas used to produce plasma is argon gas which flows inside the chamber at a rate of 40 sccm. The influence of work function for different target materials (gold, copper, and silver), - 5cm in diameter and around 1mm thickness - different working pressures, and different applied voltages on electrical characteristics (discharge current, discharge potential, and Paschen’s curve) were studied. The results showed that the discharge cur
... Show MoreThe ambient temperature is the major parameter that influences wind speed. When temperature rises, air will be extended and wind will flow with different speeds in all directions, increasing of temperature means that wind speed will be increased and vice versa. The relative humidity and atmospheric pressure affected with temperature, too. Climate changes making significant effects on the atmospheric temperature. In this project, the data of thirty four years (1981 – 2004) has been analyzed to get an idea about the changes occurred in the meteorological parameters in Al-Nasiriya city, which was chosen because it has a distinctive wind speed.