The main objective of this paper is present a novel method to choice a certain wind turbine for a specific site by using normalized power and capacity factor curves. The site matching is based on identifying the optimum turbine rotation speed parameters from turbine performance index (TPI) curve, which is obtained from the higher values of normalized power and capacity factor curves. Wind Turbine Performance Index a new ranking parameter, is defined to optimally match turbines to wind site. The relations (plots) of normalized power, capacity factor, and turbine performance index versus normalized rated wind speed are drawn for a known value of Weibull shape parameter of a site, thus a superior method is used for Weibull parameters estimation which is called Equivalent Energy Method (EEM).
The capacity factor is the main factor in assessing the efficiency of wind Turbine. This paper presents a procedure to find the optimal wind turbine for five different locations in Iraq based on finding the highest capacity factor of wind turbine for different locations. The wind data for twelve successive years (2009-2020) of five locations in Iraq are collected and analyzed. The longitudes and latitudes of the candidate sites are (44.3661o E, 33.3152o N), (47.7738o E, 30.5258o N), (45.8160o E, 32.5165o N), (44.33265o E, 32.0107o N) and (46.25691o E, 31.0510o N) for Baghdad, Basrah, Al-Kut, Al-Najaf, and Al-Nasiriyah respectively. The average wind velocity, standard deviation, Weibull shape and scale factors, and probability density functi
... Show MoreWind energy is considered one of the most important sources of renewable energy in the world, because it contributes to reducing the negative effects on the environment. The most important types of wind turbines are horizontal and vertical axis wind turbines. This work presents the full details of design for vertical axis wind turbine (VAWT) and how to find the optimal values of necessary factors. Additionally, the results shed light on the efficiency and performance of the VAWT under different working conditions. It was taken into consideration the variety of surrounding environmental conditions (such as density and viscosity of fluid, number of elements of the blade, etc.) to simulate the working of vertical wind turbines under di
... Show MoreMatching between wind site characteristics and wind turbine characteristics for three selected sites in Iraq was carried out. Site-turbine matching for potential wind power application in Iraq has not yet been well reported on. Thus, in this study, five years’ wind speed data for sites located in Baghdad (33.34N, 44.40E), Nasiriyah (31.05N, 46.25E), and Basrah (30.50N, 47.78E) were collected. A full wind energy analysis based on the measured data, Weibull distribution function, and wind turbine characteristics was made. A code developed using MATLAB software was used to analyse the wind energy and wind turbines models. The primary objective was to achieve a standard wind turbine-site matching based on the capacity factor. Another matching
... Show MoreThe main objective of the paper is to study the possibility of erecting 2 MW wind turbine in the south of Iraq (Barjisiah site) by utilizing WAsP model. Wind potential and output predicted the power of WT at a supposed site was calculated. The results for proposed WT showed the WT has a weak performance due to its high capacity and low potential of wind speeds at this site. So, the WT will provide power for a limited time during the year due to its operating at the zone under the rated wind speed.
The aim of most researchers is to complete full projects for establishing renewable sources stations. The project depend on many variables, which is called criteria, that’s makes the project workable or not. The criterion which studied in this paper is roads suitability for transporting turbines from the loading ports to construction site. One of the important factors which must provide paved roads for transportation and within standard. Southern Um-Qasr port is the best choice to receive wind turbine equipments. The nods down to the construction region will face 0 turns, 2 bridges that crosses over and 23 bridges that passes underneath.
Wind farm assessment project have several steps. This paper aim on the second step which is harvesting the roads properties from the loading point to the construction point. The difficulties of examining the roads whether they are appropriate or not for transporting wind turbine components. The selected site for establishing wind farm is located at Maysan province and has 262 km distance from Um – Qaser port. The results through applying remote sensing and GIS techniques on Landsat (30 m resolution) and QuckBird (0.6 m resolution) are summarized by (2 hard turn, 18 Bridges that crossing over, and 13 Bridges passing under).
In this paper, the 5 minutes measured wind speed data for year 2012 at 10 meter height for Tweitha have been statically analyzed to assess the time of wind turbine electrical power generation. After collection Tweitha wind data and calculation of mean wind speed the cumulative Weibull diagram and probability density function was ploted, then each of cumulative Weibull distribution, cut-in and furling turbine wind speed could be used as a mathematical input parameters in order to estimate the hours of electrical power generation for wind turbine during one day or one year. In Tweitha site, found that the average wind speed was (v= 1.76 m/s), so five different wind turbines were be selected to calculate hours of electrical generation for A
... Show MoreThe load shedding scheme has been extensively implemented as a fast solution for unbalance conditions. Therefore, it's crucial to investigate supply-demand balancing in order to protect the network from collapsing and to sustain stability as possible, however its implementation is mostly undesirable. One of the solutions to minimize the amount of load shedding is the integration renewable energy resources, such as wind power, in the electric power generation could contribute significantly to minimizing power cuts as it is ability to positively improving the stability of the electric grid. In this paper propose a method for shedding the load base on the priority demands with incorporating the wind po
... Show MoreThe placement of buildings and structures on/or adjacent to slopes is possible, but this poses a danger to the structure due to failures that occur in slopes. Therefore, a solution or improvement should be determined for these issues of the collapse of the structure as a result of the failure of the slopes. A laboratory model has been built to test the impact of some variables on the bearing capacity factor. The variables include the magnitude of static axial load applied at the center of footing, the depth of embedment, the spacing between geogrid reinforcement layer and the numbering of the geogrid sheet under the footing, the inclination angle of slope clayey soil (β), the spacing between the footing's edge and the slope's end (b/H). Th
... Show MoreIn this research, we built a program to assess Weibull parameters and wind power of three separate locations in Iraq: Baghdad, Basrah and Dhi-qar for two years 2009 and 2010, after collecting and setting the data available from the website "Weather Under Ground" for each of the stations Baghdad, Basrah and Dhi-qar. Weibull parameters (shape parameter and scale parameter) were estimated using maximum likelihood estimation method (MLE) and least squares method (LSM). Also, the annual wind speed frequencies were calculated noting speed most readily available through the above two years. Then, we plotted Weibull distribution function and calculate the most significant quantities represented by mean wind speed, standard deviation of the value
... Show More