Preferred Language
Articles
/
ijp-380
The nuclear level density parameter
...Show More Authors

The nuclear level density parameter  in non Equi-Spacing Model (NON-ESM), Equi-Spacing Model (ESM) and the Backshifted Energy Dependent Fermi Gas model (BSEDFG) was determined for 106 nuclei; the results are tabulated and compared with the experimental works. It was found that there are no recognizable differences between our results and the experimental -values. The calculated level density parameters have been used in computing the state density as a function of the excitation energies for 58Fe and 246Cm nuclei. The results are in a good agreement with the experimental results from earlier published work.

Crossref
View Publication Preview PDF
Quick Preview PDF
Publication Date
Mon Feb 10 2025
Journal Name
International Linguistics Research
A Semiotic Study of Reduplicative Words in Selected American Slang Expressions
...Show More Authors

This study explores the semiotic aspects of American slang, specifically focusing on the phenomenon of reduplicative expressions in informal speech. Despite the extensive research on American slang, limited attention has been given to the cultural and mythical meanings embedded within reduplicative expressions. To address this gap, the study investigates how these expressions convey denotative, connotative, and mythical meanings within casual American discourse. The objectives of the study include: 1. To what extent does Barthes’ semiotic model hold potential for application in this study? 2. How are reduplicative slang expressions widely used in everyday American life? 3. To what extent do qualitative and quantitative methods hav

... Show More
View Publication
Crossref
Publication Date
Sun Jul 09 2023
Journal Name
Journal Of Engineering
Solving Time-Cost Tradeoff Problem with Resource Constraint Using Fuzzy Mathematical Model
...Show More Authors

Scheduling considered being one of the most fundamental and essential bases of the project management. Several methods are used for project scheduling such as CPM, PERT and GERT. Since too many uncertainties are involved in methods for estimating the duration and cost of activities, these methods lack the capability of modeling practical projects. Although schedules can be developed for construction projects at early stage, there is always a possibility for unexpected material or technical shortages during construction stage. The objective of this research is to build a fuzzy mathematical model including time cost tradeoff and resource constraints analysis to be applied concurrently. The proposed model has been formulated using fuzzy the

... Show More
View Publication Preview PDF
Crossref (3)
Crossref
Publication Date
Tue Nov 01 2022
Journal Name
Isa Transactions
Robust adaptive active disturbance rejection control of an electric furnace using additional continuous sliding mode component
...Show More Authors

The temperature control process of electric heating furnace (EHF) systems is a quite difficult and changeable task owing to non-linearity, time delay, time-varying parameters, and the harsh environment of the furnace. In this paper, a robust temperature control scheme for an EHF system is developed using an adaptive active disturbance rejection control (AADRC) technique with a continuous sliding-mode based component. First, a comprehensive dynamic model is established by using convection laws, in which the EHF systems can be characterized as an uncertain second order system. Second, an adaptive extended state observer (AESO) is utilized to estimate the states of the EHF system and total disturbances, in which the observer gains are updated

... Show More
View Publication
Scopus (23)
Crossref (24)
Scopus Clarivate Crossref
Publication Date
Mon Sep 20 2021
Journal Name
Key Engineering Materials
Effect of Partial Substitution of Sr by Ba on the Structural Properties of Tl<sub>0.8</sub>Ni<sub>0.2</sub>Sr<sub>2-x</sub>Br<sub>x</sub>Ca<sub>2</sub>Cu<sub>3</sub>O<sub>9-δ</sub> System
...Show More Authors

In this manuscript, the effect of substituting strontium with barium on the structural properties of Tl0.8Ni0.2Sr2-xBrxCa2Cu3O9-δcompound with x= 0, 0.2, 0.4, have been studied. Samples were prepared using solid state reaction technique, suitable oxides alternatives of Pb2O3, CaO, BaO and CuO with 99.99% purity as raw materials and then mixed. They were prepared in the form of discs with a diameter of 1.5 cm and a thickness of (0.2-0.3) cm under pressures 7 tons / cm2, and the samples were sintered at a constant temperature o

... Show More
View Publication
Scopus (4)
Crossref (1)
Scopus Crossref
Publication Date
Tue Jun 01 2021
Journal Name
Iop Conference Series: Earth And Environmental Science
Performance Evaluation of Al-Karkh Water Treatment Plant Using Model-driven and Data-Driven Models
...Show More Authors
Abstract<p>There is a great operational risk to control the day-to-day management in water treatment plants, so water companies are looking for solutions to predict how the treatment processes may be improved due to the increased pressure to remain competitive. This study focused on the mathematical modeling of water treatment processes with the primary motivation to provide tools that can be used to predict the performance of the treatment to enable better control of uncertainty and risk. This research included choosing the most important variables affecting quality standards using the correlation test. According to this test, it was found that the important parameters of raw water: Total Hardn</p> ... Show More
View Publication
Scopus (1)
Crossref (2)
Scopus Crossref
Publication Date
Thu Jan 30 2020
Journal Name
Journal Of Engineering
Current and Modified Flood Discharge Capacity of a Reach of Tigris River between Kut and Amarah Barrages
...Show More Authors

This study was conducted to examine the discharge capacity of the reach of the Tigris River between Kut and Amarah Barrages of 250km in length. The examination includes simulation the current capacity of the reach by using HEC-RAS model. 247cross sections surveyed in 2012 were used in the simulation. The model was calibrated using observed discharges of 533, 800, 1025 and 3000m3/s discharged at Kut Barrage during 2013, 1995, 1995 and 1988, respectively, and its related water level at three gauge stations located along the reach. The result of calibration process indicated that the lowest Root Mean Square Error of 0.095 can be obtained when using Manning’s n coefficient of 0.026, 0.03 for th

... Show More
View Publication Preview PDF
Crossref (7)
Crossref
Publication Date
Fri Oct 02 2009
Journal Name
Noise And Health
Expert system to predict effects of noise pollution on operators of power plant using neuro-fuzzy approach
...Show More Authors

Ration power plants, to generate power, have become common worldwide. One such one is the steam power plant. In such plants, various moving parts of heavy machines generate a lot of noise. Operators are subjected to high levels of noise. High noise level exposure leads to psychological as well physiological problems; different kinds of ill effects. It results in deteriorated work efficiency, although the exact nature of work performance is still unknown. To predict work efficiency deterioration, neuro-fuzzy tools are being used in research. It has been established that a neuro-fuzzy computing system helps in identification and analysis of fuzzy models. The last decade has seen substantial growth in development of various neuro-fuzzy systems

... Show More
View Publication Preview PDF
Scopus (2)
Crossref (1)
Scopus Clarivate Crossref
Publication Date
Tue Jul 07 2020
Journal Name
Journal Of Mechanical Engineering Research & Developments
NOISE EFFECTS IN SKILL DISCRETION AND MODELING
...Show More Authors

Diesel generators is widely used in Iraq for the purpose of maintaining electric power demand. Large number of operators engaged in this work encounters high level of noise generated by back pack type diesel generators used for this purpose. High level of noise exposure gives different kinds of ill effect on human operators. Exact nature of deteriorated work performance is not known., in present research , quastionaire was adsministered 86 repondents in Baghdad city were exposured to wide range of noise level (80-110) dB(A) with different ages and they have different skill discretion levels. Noise levels A-weigthed decibles dB(A) were measured over 8 weeks two times aday during the 2019 summer using a sound level meter.For predicting the wo

... Show More
View Publication Preview PDF
Publication Date
Mon May 12 2025
Journal Name
Boundary Value Problems
Minimal wave speed and traveling wave in nonlocal dispersion SIS epidemic model with delay
...Show More Authors

This study examines traveling wave solutions of the SIS epidemic model with nonlocal dispersion and delay. The research shows that a key factor in determining whether traveling waves exist is the basic reproduction number R0. In particular, the system permits nontrivial traveling wave solutions for σ≥σ∗ for R0>1, whereas there are no such solutions for σ<σ∗. This is because there is a minimal wave speed σ∗>0. On the other hand, there are no traveling wave solutions when R0≤1. In conclusion, we provide several numerical simulations that illustrate the existence of TWS.

View Publication Preview PDF
Scopus (2)
Crossref (2)
Scopus Clarivate Crossref
Publication Date
Wed Jun 01 2016
Journal Name
Journal Of Engineering
Management Model for Evaluation and Selection of Engineering Equipment Suppliers for Construction Projects in Iraq
...Show More Authors

Engineering equipment is essential part in the construction project and usually manufactured with long lead times, large costs and special engineering requirements. Construction manager targets that equipment to be delivered in the site need date with the right quantity, appropriate cost and required quality, and this entails an efficient supplier can satisfy these targets. Selection of engineering equipment supplier is a crucial managerial process .it requires evaluation of multiple suppliers according to multiple criteria. This process is usually performed manually and based on just limited evaluation criteria, so better alternatives may be neglected. Three stages of survey comprised number of public a

... Show More
View Publication Preview PDF