This paper proposes a completion that can allow fracturing four zones in a single trip in the well called “Y” (for confidential reasons) of the field named “X” (for confidential reasons). The steps to design a well completion for multiple fracturing are first to select the best completion method then the required equipment and the materials that it is made of. After that, the completion schematic must be drawn by using Power Draw in this case, and the summary installation procedures explained. The data used to design the completion are the well trajectory, the reservoir data (including temperature, pressure and fluid properties), the production and injection strategy. The results suggest that multi-stage hydraulic fracturing can be done in a single trip by using the ball-and-sleeve method. Metallurgy and hydrogenated nitrile are sealing elementary constituent of chromium which are essential materials found in alloy with 13% of chromium.
Poly(ethylene oxide) is a promising material for solid-state lithium batteries due to its safety, ease of processing, and compatibility with lithium. However, conventional linear PEO falls short of practical requirements due to its limited ionic conductivity, a consequence of the high crystallinity of its ethylene oxide chains. This crystallinity hinders the movement of lithium ions, limiting its performance in solid-state battery applications. In this study, we successfully prepared the plasticized solid polymer electrolytes (PSPEs) based on poly(ethylene oxide) (PEO)/ tetracyanoethylene (TCE) complexed with lithium bis(trifluoromethanesulfonyl)imide (LiTFSI) salt and studied the effect of TCE on structural, mechanical, electrical and elec
... Show MoreThere is no doubt that the project control function is very important for administration, so the project Management depends on to monitor and control the project. The project control integrated to the planning which is the base of the administration functions; planning, organizing, directing, and controlling. Without project control cannot be insure to fulfill the plan of the project by the budget and specified time. The project management apply many methods of control to achieve the goals of project which are cost, time, and required specifications. Earned Value Management one of control methods that used in the project by international companies.
Earned Value Method is used in the project o
... Show MoreLED is an ultra-lightweight block cipher that is mainly used in devices with limited resources. Currently, the software and hardware structure of this cipher utilize a complex logic operation to generate a sequence of random numbers called round constant and this causes the algorithm to slow down and record low throughput. To improve the speed and throughput of the original algorithm, the Fast Lightweight Encryption Device (FLED) has been proposed in this paper. The key size of the currently existing LED algorithm is in 64-bit & 128-bit but this article focused mainly on the 64-bit key (block size=64-bit). In the proposed FLED design, complex operations have been replaced by LFSR left feedback technology to make the algorithm perform more e
... Show More