A novel demountable shear connector for precast steel-concrete composite bridges is presented. The connector uses high-strength steel bolts, which are fastened to the top flange of the steel beam with the aid of a special locking nut configuration that prevents bolts from slipping within their holes. Moreover, the connector promotes accelerated construction and overcomes the typical construction tolerance issues of precast structures. Most importantly, the connector allows bridge disassembly. Therefore, it can address different bridge deterioration scenarios with minimum disturbance to traffic flow including the following: (1) precast deck panels can be rapidly uplifted and replaced; (2) connectors can be rapidly removed and replaced; and (
... Show MoreObjectives: The present study aims at detecting the depression among nurses who provide care for infected patients with corona virus phenomenon and to find out relationships between the depression and their demographic characteristics of age, gender, marital status, type of family, education, and years of experience of nurses in heath institutions, infection by corona virus, and their participation in training courses.
Methodology: A descriptive study is established for a period from October 10th, 2020 to April 15th, 2021. The study is conducted on a purposive (non-probability) sample of (100) nurse who are providing care for patients with COVID-19 and they are selected from the isolation wards. The instrument of the study is develope
A total of 48 experiments were conducted to investigate the impact of slit weir dimensions and locations on the maximum scour depth and scour area created upstream. The slit weir model was a 110 mm slit opening, and it was installed at the end of the working section in a laboratory flume. The flume was 10.0 m long, 30 cm wide, 30 cm deep, and almost middle. It includes a 2 m working section with a mobile bed with 110 mm in thickness. In the mobile bed, two types of nonuniform sand (with a geometric standard deviation of 1.58 and 1.6) were tested separately. The weir dimensions and location were changed with flow rates. Then dimensions of the slit weir were changed from 60 x 110 mm to 60 x 70 mm (width x height), while th
... Show MoreAbstract
The research’s goal lies in demonstrating the impact of the Federal Financial Supervision Endowment through the process of auditing the performance of the entities subject to its audit as to improve the performance of these entities, especially if the performance audit method is one of the newly applied methods that are compatible with the standards issued by the International Organization of Financial Supervision and Accounting Institutions which is the method of auditing performance according to the performance evaluation guide for programs and policies issued by the Federal Office of Financial Supervision.
T
... Show MoreThe new liganed Schiff base named [(E)-3-hydroxy-4-((3,4,5- trimethoxybenzylidene)amino) naphthalene-1- sulfonic acid] was synthesized from 3,4,5-trimethoxybenzyldehyde and 1-amino-2-aphthol-4- sulfonic acid in equal molar ratio. A series of new metal complexes' of the common molecular formulation [M(L)2(H2O)2].H2O are synthesized and characterized by IR, UV–Vis spectra, mass spectra, atomic absorption, elemental analyses, chloride content, magnetic susceptibility and conductivity measurements as well as thermo gravimetric analysis (TGA, DSC). Consistent with results of the magnetic and spectral studies, the advised geometrical structures for all of the prepared complexes have been octahedral formula
Larval instar duration of the house fly Musca domesticais influenced by the application of GHA and precocine. Topical use of ug / ul of JHA KID 183 prolonge Juvenile period compared to the control. On the contrary, application of ug / ul of precocine decreased it. Application of both substances has no effect. The emergence inhibitors were also influenced by such treatments. It reached 52.39% by the use of JHA, (-14.28%) by the use of precocine.
The splicing design of the existing road and the new road in the expansion project is an important part of the design work. Based on the analysis of the characteristics and the load effect of pavement structure on splicing, this paper points out that tensile crack or shear failure may occur at the splicing under the repeated action of the traffic load on the new/old pavement. According to the current structure design code of asphalt pavement in China, it is proposed that the horizontal tensile stress at the bottom of the splicing layer and the vertical shear stress at other layers of the splicing line should be controlled by adjusting the position and size of the excavated steps in addition to the conventional design ind
... Show More