Delays and disruption are a common issue in both community and personal building programs The problem exists all throughout the world, but it is particularly prevalent in Iraq, where millions of dollars are squandered each time as a outcome. Delays and interruptions may have serious consequences not just for Iraq's construction plans, but also for the country's economic and social status. While numerous studies have been conducted to investigate the factors driving delays and disruption in Iraqi construction projects, slight consideration has been given to by what means project management implements and approaches have affected the occurrence of project delays and disruption. After analyzing the crucial reasons for delays and instability in public and private construction projects in Iraq, this paper aims to improve the recording and recommendations using Project Supervision concepts. A thorough investigation was conducted to identify the critical factors that are causing delays and disruptions in construction projects in Iraq's public and private sectors and present project management application procedures in order to establish recommendations to successfully reduce work disruptions and instability in Iraq This paper identifies the top crucial factors contributing to construction project delays and disruptions in Iraq. It further identifies project management Tools and techniques that, when used appropriately, have the potential to address the major causes of delays and interruptions. Following that, a new set of guidelines for applying Project Management methodologies and strategies to address the identified delay and disruption issues is provided, with the objective of aiding practitioners in minimizing the possibility for construction delays and interruption in Iraqi projects.
Purpose: The aim of this study was to gain insight into causes of time delays and cost overruns in a selection of thirty case projects in Iraq. Delay factors have been studied in many countries/contexts, but not much data exists from countries under the conditions characterizing Iraq during the last 10-15 years.Design/methodology/approach: A case study approach was adopted, with thirty construction projects selected from the Baghdad region, of different types and sizes. For the case of the study, the participants in the projects provided data about the projects through the data collection tool distributed through the questionnaire directed to them. Statistical data analysis was used to build statistical relationships between time and cost d
... Show MoreThe importance of the construction sector and its Great role in the provision of services and infrastructure, reduce poverty, improve living conditions and improve the economic situation in the country, impose attention to the way in which the projects implemented for its improvement and to get successful projects. The objective of this research was to determine the criteria for success as well as critical success and failure factors that have a significant impact on project success. A selected 75 engineer (department managers, project managers and engineers) are asked to fill the questionnaire form, Sixty-seven valid questionnaire forms were analyzed statistically to get search results, which were as follows : Twe
... Show MoreTo finalize any construction investment project, it would be necessary to identify the most significant problems and obstacles that lead to project reluctance and stalling. Unexpected events and conflicts may have disrupted these strategies and impacted project development. Due to the high initial investment costs of construction projects, crises can have an immediate impact, resulting in significant financial losses. The 2014 financial crisis was one of the most prominent crises that Iraq faced, which prompted the researcher to identify and evaluate those obstacles through this research and questionnaires using Pareto scientific theory to exclude factors that do not contribute to project lag. It was discovered that 28 o
... Show MoreStrategic Cost Management Tools Under Technological Development and Change in Customer Tastes Critical Studies
Variation orders are an on-going phenomenon in construction and industry projects worldwide, particularly in the province of Sulaimani, where the project's damage from cost and schedule overrun because of variation orders. However, the effect on project costs and time overrun of variation order has yet to be identified. This study evaluates the impact of variation orders on the cost and time off in the Sulaimani governorate. Two hundred twenty-eight projects from various construction sectors built between 2007-2012 were adopted to calculate the contract cost and schedule overruns due to variation orders. Data analysis was applied in the study were descriptive statistics. One-way ANOVA was also applied to determine w
... Show MoreThe paper deals with claims in construction projects in Iraq and studies their types, causes, impacts, resolution methods and then proposes a management system to control the impacts of claims. Two parts have been done to achieve the research objective (theoretical part and practical part). The findings showed that the main types of the claims are extra work claims, different site condition claims, delay claims and the main causes of the claims are variation of the orders, design errors and omission, delay in payments by owner, variation in quantities and scheduling errors. The claims have bad impacts on the cost by increasing (10% to 25%) and also on the duration of the project by increasing from (25% to 50%).The negotiation is the main
... Show MoreThe status of the semi total stoppage and non-use and waste of economic made studying and analyzing Dutch disease of high importance because it is a major cause in aggravation of this status which happened to the Iraqi economy in almost complete way and the relative big importance that oil source has and its domination on the largest percentage in the gross domestic product and exports that Iraqi economy is relying largely in funding the national budget made the concentration of the study on this subject an important and necessary within the important economic events that Iraqi economy witnessed after 2003 till 2016 to give a clear and an overall picture of the reality of the unilateral Iraqi economy under the status of semi tota
... Show MoreThis research investigated the importance and priorities of the project overhead costs in Iraq via a questionnaire using the fuzzy analytic hierarchy process technique (FAHP). Using this technique is very important in the uncertain circumstances as in our country. The researcher reached to frame an equation through the results of the priorities of weights include the percentages of each of the main items of the project overhead costs. The researcher tested this equation by applying it to one of the completed projects and the results showed suitability for the application. The percentages of the (salaries, grants, and incentives) and (fieldwork requirements) in equation represent approximately two-thirds of project overhe
... Show MoreThe reality of the field of construction projects in Iraq refers to needing for the development of performance in order to improve quality and reduce defects and errors and to control the time and cost, so there is needing for the application of effective methods in this area, one of the methods that can be applied in this area is the manner of Six Sigma. This research aims to enhance the performance and quality improvement for the construction projects by improving performance in the work of the implementation of the concrete structure depending on the Six Sigma methodology, and for the purpose of achieving the aim of the research, the researcher firstly depends on the theoretical study that include the concepts of qual