Preferred Language
Articles
/
dBaqK4cBVTCNdQwC4Dt6
Principles of using project management tools and techniques of mitigate components causing delays and disruption in public and private construction projects in Iraq
...Show More Authors

Delays and disruption are a common issue in both community and personal building programs The problem exists all throughout the world, but it is particularly prevalent in Iraq, where millions of dollars are squandered each time as a outcome. Delays and interruptions may have serious consequences not just for Iraq's construction plans, but also for the country's economic and social status. While numerous studies have been conducted to investigate the factors driving delays and disruption in Iraqi construction projects, slight consideration has been given to by what means project management implements and approaches have affected the occurrence of project delays and disruption. After analyzing the crucial reasons for delays and instability in public and private construction projects in Iraq, this paper aims to improve the recording and recommendations using Project Supervision concepts. A thorough investigation was conducted to identify the critical factors that are causing delays and disruptions in construction projects in Iraq's public and private sectors and present project management application procedures in order to establish recommendations to successfully reduce work disruptions and instability in Iraq This paper identifies the top crucial factors contributing to construction project delays and disruptions in Iraq. It further identifies project management Tools and techniques that, when used appropriately, have the potential to address the major causes of delays and interruptions. Following that, a new set of guidelines for applying Project Management methodologies and strategies to address the identified delay and disruption issues is provided, with the objective of aiding practitioners in minimizing the possibility for construction delays and interruption in Iraqi projects.

Crossref
Publication Date
Wed Jun 01 2016
Journal Name
Journal Of Engineering
Management Model for Evaluation and Selection of Engineering Equipment Suppliers for Construction Projects in Iraq
...Show More Authors

Engineering equipment is essential part in the construction project and usually manufactured with long lead times, large costs and special engineering requirements. Construction manager targets that equipment to be delivered in the site need date with the right quantity, appropriate cost and required quality, and this entails an efficient supplier can satisfy these targets. Selection of engineering equipment supplier is a crucial managerial process .it requires evaluation of multiple suppliers according to multiple criteria. This process is usually performed manually and based on just limited evaluation criteria, so better alternatives may be neglected. Three stages of survey comprised number of public a

... Show More
View Publication Preview PDF
Publication Date
Thu Dec 19 2024
Journal Name
Technical University Of Munich
Conditions for Applying Public Private Partnership PPP in Iraq Infrastructure Projects Successfully
...Show More Authors

Public private partnership PPP is a method to procure public projects in order to achieve additional value for money in terms of efficiency and quality of services. This thesis studies the concepts of PPP, advantages and disadvantages of PPP. In addition, current Iraq infrastructure projects situations and needs, as well as, some aspects relating to the Iraq’s construction market, legal and contract systems were discussed. A financial model was carried out and applied to a real-life case study project. Finally, a survey targeted researchers; public and private- sectors were applied.

View Publication
Publication Date
Sat Jan 01 2022
Journal Name
International Journal Of Mechanical Engineering
Innovations and Requirements of Strategy for Digital Maintenance Management in Construction Project
...Show More Authors

Scopus (1)
Scopus
Publication Date
Fri Mar 19 2021
Journal Name
Periodicals Of Engineering And Natural Sciences (pen)
New cost control techniques in mega construction projects
...Show More Authors

View Publication
Scopus (3)
Crossref (1)
Scopus Crossref
Publication Date
Sat Apr 01 2017
Journal Name
Journal Of Economics And Administrative Sciences
Risk Analysis of Projects Accordance with the Professional Project Management System: A case- Study Mansur Construction Contracting Company here
...Show More Authors

The research aims to identify the risks faced by projects and work on the administration, such as those risks by using professional Project Management System (Project Management Professional) by identifying those risks and their impact on the objectives of the project, if they occur and to provide appropriate responses to Ha.autam search application on the draft Law Faculty port by the General Mansour Construction Contracting company has been using a method personal interview with the heads of departments and project managers in the Al-Mansour and tools descriptive and quantitative analysis as was used (likelihood and impact of risk analysis, Ai_kaoa scheme Sbb- effect, analysis of probability and impact, risk matrix (probability

... Show More
View Publication Preview PDF
Crossref
Publication Date
Sat Dec 01 2012
Journal Name
Journal Of Economics And Administrative Sciences
Public sector in Iraq Transition and partnership with the private sector
...Show More Authors

  The role of the public sector- Investment customizations-  economic embargo -  The role of the private sector - Coexistence between the public and private sectors -   Ratio of growth

View Publication
Crossref
Publication Date
Mon Jun 01 2015
Journal Name
Journal Of Economics And Administrative Sciences
Partnership between Public-Private secters between legislation and practice in IRAQ
...Show More Authors

The topic of the partnership between the public and private sectors with great interest by researchers around the world after making sure that the process of economic and social development depends on a combination of resources and energies and expertise of both the public and private sectors in the creation and operation of the various projects , the economic development of the growing proved the failure of both sectors in achieving greater economic growth Klaaly separately in many countries , especially developing countries with a socialist approach , led one way or another to adopt most of the countries economic reform programs promoted by international organizations and institutions ( such as the IMF and the World Bank ) of i

... Show More
View Publication Preview PDF
Crossref
Publication Date
Thu Jul 07 2022
Journal Name
Public Works Management & Policy
Impact of Pandemic SARS COVID-19 on Different Construction Project Management: Problems and Solutions
...Show More Authors

This study discusses risk management strategies caused by pandemic-related (Covid-19) suspensions in thirty-six engineering projects of different types and sizes selected from countries in the middle east and especially Iraq. The primary data collection method was a survey and questionnaire completed by selected project crew and laborers. Data were processed using Microsoft Excel to construct models to help decision-makers find solutions to the scheduling problems that may be expected to occur during a pandemic. A theoretical and practical concept for project risk management that addresses a range of global and local issues that affect schedule and cost is presented and results indicate that the most significant delays are due to a

... Show More
View Publication
Scopus (4)
Crossref (4)
Scopus Clarivate Crossref
Publication Date
Thu Jul 07 2022
Journal Name
Public Works Management & Policy
Impact of Pandemic SARS COVID-19 on Different Construction Project Management: Problems and Solutions
...Show More Authors

This study discusses risk management strategies caused by pandemic-related (Covid-19) suspensions in thirty-six engineering projects of different types and sizes selected from countries in the middle east and especially Iraq. The primary data collection method was a survey and questionnaire completed by selected project crew and laborers. Data were processed using Microsoft Excel to construct models to help decision-makers find solutions to the scheduling problems that may be expected to occur during a pandemic. A theoretical and practical concept for project risk management that addresses a range of global and local issues that affect schedule and cost is presented and results indicate that the most significant delays are due to a

... Show More
Scopus (4)
Crossref (4)
Scopus Clarivate Crossref
Publication Date
Mon Jun 06 2022
Journal Name
Engineering, Technology & Applied Science Research
Supply Chain Management of Infrastructure Projects in Iraq
...Show More Authors

Infrastructure projects take a long time, are complex, multidisciplinary, use different materials and products, and have high risk. These characteristics affect the process of supplying materials. The current paper studies the ability to improve the supply chain process and decrease its cost by identifying the factors that affect it. These factors are used as variables in the mathematical model, which is working under uncertain conditions when the consumption rate of materials is not constant. The information used in this model is obtained from Building Information Modeling (BIM) and Geographical Information System (GIS) techniques and the genetic algorithm is utilized to determine the optimal supplier and the quantities of supplies

... Show More
View Publication
Scopus (4)
Crossref (4)
Scopus Crossref