Principles of using project management tools and techniques of mitigate components causing delays and disruption in public and private construction projects in Iraq
...Show More Authors

Delays and disruption are a common issue in both community and personal building programs The problem exists all throughout the world, but it is particularly prevalent in Iraq, where millions of dollars are squandered each time as a outcome. Delays and interruptions may have serious consequences not just for Iraq's construction plans, but also for the country's economic and social status. While numerous studies have been conducted to investigate the factors driving delays and disruption in Iraqi construction projects, slight consideration has been given to by what means project management implements and approaches have affected the occurrence of project delays and disruption. After analyzing the crucial reasons for delays and instability in public and private construction projects in Iraq, this paper aims to improve the recording and recommendations using Project Supervision concepts. A thorough investigation was conducted to identify the critical factors that are causing delays and disruptions in construction projects in Iraq's public and private sectors and present project management application procedures in order to establish recommendations to successfully reduce work disruptions and instability in Iraq This paper identifies the top crucial factors contributing to construction project delays and disruptions in Iraq. It further identifies project management Tools and techniques that, when used appropriately, have the potential to address the major causes of delays and interruptions. Following that, a new set of guidelines for applying Project Management methodologies and strategies to address the identified delay and disruption issues is provided, with the objective of aiding practitioners in minimizing the possibility for construction delays and interruption in Iraqi projects.

Crossref
Publication Date
Mon Jun 06 2022
Journal Name
Engineering, Technology & Applied Science Research
Supply Chain Management of Infrastructure Projects in Iraq
...Show More Authors

Infrastructure projects take a long time, are complex, multidisciplinary, use different materials and products, and have high risk. These characteristics affect the process of supplying materials. The current paper studies the ability to improve the supply chain process and decrease its cost by identifying the factors that affect it. These factors are used as variables in the mathematical model, which is working under uncertain conditions when the consumption rate of materials is not constant. The information used in this model is obtained from Building Information Modeling (BIM) and Geographical Information System (GIS) techniques and the genetic algorithm is utilized to determine the optimal supplier and the quantities of supplies

... Show More
View Publication
Scopus (4)
Crossref (4)
Scopus Crossref
Publication Date
Fri Jan 01 2021
Journal Name
E3s Web Of Conferences
Investigation the Opportunity of BIM with Agile Management Approach in Iraqi Construction Projects
...Show More Authors

The construction industry in Iraq suffers from many problems, perhaps the most important of which is the delay in time and the increase in costs. Therefore, it was necessary to try to adopt a new methodology that would help in overcoming these problems. It was suggested to combine building information modeling with the agile management approach because this technique and methodology is modern and helps in reducing time and cost and improving quality. This paper aims to know the status of using Building Information Modeling (BIM) and Agile Project management (APM) in Iraq and to shed light on the merging of this integration, explaining the benefits, difficulties, and workflow practices, finding the most influencing factors on the tim

... Show More
View Publication
Crossref (4)
Crossref
Publication Date
Mon Oct 02 2023
Journal Name
Journal Of Engineering
Main Delay Factors of Implementation EPC Construction Projects in Iraq
...Show More Authors

This essay aims to highlight the most important issues and difficulties facing implementing large projects that follow the turn-key method, considered one of the types of contractual methods in Iraq, especially for large and complex projects requiring speedy completion. The projects implemented in this way face delays and delays in completion, which led to the lack of benefit from the projects for which they were implemented, especially those affecting the lives of citizens within the health sector. The case study dealt with the construction of hospitals with multi-bed capacities within multiple governorates in Iraq, With large financial allocations within the federal budget of the Government of Iraq over several years.

... Show More
View Publication Preview PDF
Crossref (2)
Crossref
Publication Date
Sat Dec 02 2023
Journal Name
Journal Of Engineering
Empirical Study for Capturing and Allocating Significant Risk Factors in School Construction Projects in Iraq
...Show More Authors

In Iraq, more than 1031 school projects have been halted due to disputes and claims resulting from financial, contractual, or other issues. This research aims to identify, prioritize, and allocate the most critical risk factors that threaten these projects’ success for the duration (2017-2022). Based on a multi-step methodology developed through systematic literature reviews, realistic case studies, and semi-structured interviews, 47 risk factors were identified. Based on 153 verified responses, the survey reveals that the top-ranked risk factors are corruption and bribery, delaying the payments of the financial dues to the contractors or sub-contractors, absence of risk management strategy, multiple change orders due

... Show More
View Publication Preview PDF
Crossref (1)
Crossref
Publication Date
Fri Jun 01 2018
Journal Name
Journal Of Accounting And Financial Studies ( Jafs )
Employment cost management tools in the fast-track method Of the constructionindustries for the purpose of rationalizing costs: An applied research in the Shatt al-Diwaniya transference project General Authority for projects of irrigation and reclamation
...Show More Authors

The important factor in the success of construction projects is its ability to objective estimate of the cost of the project and adapt to the changes of the external environment, which is affected by a lot of elements and the requirements of the competitive environment. The faces of those projects are several problems in order to achieve particular goals. To overcome these difficulties has been the development of research in the last two decades and turn the focus on the role of the cost of project management, by providing information and assist management in planning and control of the budget among the main elements of the project, namely, (time-cost-quality),The research aims at the possibility of developing and implementing mechanisms

... Show More
View Publication Preview PDF
Crossref
Publication Date
Fri Jul 01 2016
Journal Name
Journal Of Engineering
Identificatio n Of Key Factors Affecting Waste Management In Life Cycle Of The Construction Project By Using Delphi Technique
...Show More Authors

The problem of generated waste as a result of the implementation of construction projects, has  been aggravated recently because of construction activity experienced by the world, especially Iraq, which is going through a period of reconstruction, where construction waste represents (20-40%) of the total generated waste and has a negative effect on the environment and economic side of the project. In addition, the rate of consumpted  amounts of natural resources are estimated to be about 40% in the construction industry, so it became necessary to reduce waste and to be manage well. This study aims to identify the key factors affecting waste management through the various phases of the project, and this is accom

... Show More
View Publication Preview PDF
Publication Date
Tue Dec 01 2015
Journal Name
Journal Of Engineering
Valuation the Impact of Risks on the Goals and the Safety of Construction Projects in Iraq
...Show More Authors

Construction projects have a special nature and affect them many factors making them exposed to multiple risks as a result of the length of the implementation period and the multiplicity of stages, starting from the decision stage through implementation until the final delivery, which leads to increased uncertainty and the likelihood of risk.
The process of analysis and risk management is one of the effective and productive methods that are used in managing the construction projects for the purpose of increasing the chances of ending the project successfully in terms of cost, time and quality and at the lowest possible problems.

The research aims first to the effective planning for analysis and risk managemen

... Show More
View Publication Preview PDF
Publication Date
Tue May 16 2023
Journal Name
Political Sciences Journal
Institutional Reality Construction: Principles of its Construction and Functions of Language in its Production; Diplomacy as a Model
...Show More Authors

This study aims to answer a significant problem of social sciences and philosophy: How do we construct an institutional reality such as diplomacy with an objective recognizable existence? The study assumes that the ability to build institutional reality is based on our biological capacity, as it takes different forms in all the institutions we construct. The study takes the theory of the American philosopher John Searle as an approach to examining the assumption. The study sums up important findings; cultures, although they share the biological capacity on which they produce institutional realities, differ in the form of the value standards on which the institutional realities are based. The study recommends the need of Arab social resea

... Show More
View Publication Preview PDF
Crossref
Publication Date
Wed May 10 2023
Journal Name
Journal Of Planner And Development
The Role of Public Relations Management on the Practices of Green Human Resources Management in Jordanian Private Hospitals in Amman
...Show More Authors

The study aimed to identify the role of public relations management in its dimensions (mental image, media, advertising, and the public) on green human resource management practices in Jordanian private hospitals in Amman, and this study relied on the quantitative approach (descriptive and analytical) to test hypotheses. Where the questionnaire was relied upon to collect data and their number was (1771) workers, and the study population consisted of workers in the hospitals that were studied on them and their number was 10 hospitals, where 316 questionnaires were distributed, 300 questionnaires were retrieved, and 16 questionnaires were not valid for analysis. That is, 91.7% of the sample, and the study relied on proportional stratified

... Show More
View Publication Preview PDF
Publication Date
Sat Dec 01 2012
Journal Name
Journal Of Economics And Administrative Sciences
The impact of public expenditure and public revenue on some of the intangible components of social development in Iraq for the period 1985-2008
...Show More Authors

تحتل أدوات السياسة المالية (الإنفاقية والإيرادية) مكانة مهمة بين أدوات السياسات الاقتصادية الأخرى لما تتمتع به من تأثيرات اقتصادية واجتماعية على مجمل النشاط الاقتصادي .

     وفي بحثنا هذا سنركز على الآثار الاجتماعية لأدوات السياسة المالية (الإنفاق العام والإيراد العام) لما للتنمية الاجتماعية من أهمية متزايدة في عالمنا اليوم خاصة فيما يتعلق بمقوماتها غير المادية المتمثلة في خدما

... Show More
View Publication Preview PDF
Crossref