<p>Photovoltaic (PV) systems are becoming increasingly popular; however, arc faults on the direct current (DC) side are becoming more widespread as a result of the effects of aging as well as the trend toward higher DC voltage levels, posing severe risk to human safety and system stability. The parallel arc faults present higher level of current as compared with the series arc faults, making it more difficult to spot the series arc. In this paper and for the aim of condition monitoring, the features of a DC series arc fault are analyzed by analysing the arc features, performing model’s simulation in PSCAD, and carrying out experimental studies. Various arc models are simulated and investigated; for low current arcs, the heuristic model is used where a set of parameters established. Moreover, the heuristic model’s simulated arc has been shown to be compatible with the experimental data. The features of arc noise in the electrode separation region and steady-arcing states with varied gap widths are investigated. It has been discovered that after an arc fault occurs, arc noise increases, notably in the frequency range below 50 kHz; where this property is useful for detecting DC series arc faults. Besides that, variations in air gap width are more sensitive to frequencies under 5 kHz.</p>
The purpose of this research is to demonstrate the impact of deposit insurance to reduce banking risks, as banks in various countries of the world face a variety of risks that led to banking and financial crises that led to the failure and bankruptcy of many of its bank, which led to the banks to find quick and appropriate solutions to get rid of these difficulties These solutions include the use of bank deposit protection system for the many risks and sequences of crises that accompanied the Iraqi banking work of thefts, forgery, embezzlement and changing and unstable circumstances. The importance of studying the subject of research through the theoretical framework of banking risks as well as the framework of consideration In order to
... Show MoreArtificial roughness on the absorber plate of a Solar Air Heater (SAH) is a popular technique for increasing its effective efficiency. The study investigated the effect of geometrical parameters of discrete multi-arc ribs (DMAR) installed below the SAH absorber plate on the effective efficiency. The effects of major roughness factors, such as number of gaps (Ng = 1-4), rib pitch (p/e = 4-16), rib height (e/D = 0.018-0.045), gab width (wg/e = 0.5-2), angle of attack ( = 30-75), and Reynolds number (Re= 2000-20000) on the performance of a SAH are studied. The performance of the SAH is evaluated using a top-down iterative technique. The results show that as Re rises, SAH-effective DMAR's efficiency first ascends to a specified value o
... Show Moreالنظام السياسي اليمني : دراسة في المتغيرات الداخلية
This paper introduces a relationship between the independence of polynomials associated with the links of the network, and the Jacobian determinant of these polynomials. Also, it presents a way to simplify a given communication network through an algorithm that splits the network into subnets and reintegrates them into a network that is a general representation or model of the studied network. This model is also represented through a combination of polynomial equations and uses Groebner bases to reach a new simplified network equivalent to the given network, which may make studying the ability to solve the problem of network coding less expensive and much easier.
A multivariate multisite hydrological data forecasting model was derived and checked using a case study. The philosophy is to use simultaneously the cross-variable correlations, cross-site correlations and the time lag correlations. The case study is of two variables, three sites, the variables are the monthly rainfall and evaporation; the sites are Sulaimania, Dokan, and Darbandikhan.. The model form is similar to the first order auto regressive model, but in matrices form. A matrix for the different relative correlations mentioned above and another for their relative residuals were derived and used as the model parameters. A mathematical filter was used for both matrices to obtain the elements. The application of this model indicates i
... Show MoreWaste is one of the most important problems affecting the city’s environment and its urban landscape, which results from the activities and activities of man and the natural environment. Its sources have varied between residential, commercial, industrial, medical and hazardous, and its spread in cities, on roads and on abandoned open lands, has led to significant negative effects and risks to human health and the environment.
Therefore, there were serious attempts to deal with waste and follow sequential steps that formed a waste management system such as (collection, sorting, transport, then treatment and disposal). Preventing and reducing waste, then recycling and recovering by composting or burning, and ending with bu
... Show MoreThe problem of the paper focused on the role of the learning organization in the crisis management strategy, and the extent of the actual interest in both the learning organization and the crisis management and aimed at diagnosing and analyzing that and surrounding questions. The Statistical Package for the Social Sciences (SPSS) program was used to calculate the results and the correlation coefficient between the two main variables. The methodology was descriptive and analytical. The case study was followed by a questionnaire that was distributed to a sample of 31 teachers. The paper adopted a seven-dimensional model of systemic thinking that encourages questioning, empowerment, provision of advanced technologies, and strategic lea
... Show MoreThe importance of the construction sector and its Great role in the provision of services and infrastructure, reduce poverty, improve living conditions and improve the economic situation in the country, impose attention to the way in which the projects implemented for its improvement and to get successful projects. The objective of this research was to determine the criteria for success as well as critical success and failure factors that have a significant impact on project success. A selected 75 engineer (department managers, project managers and engineers) are asked to fill the questionnaire form, Sixty-seven valid questionnaire forms were analyzed statistically to get search results, which were as follows : Twe
... Show More