Preferred Language
Articles
/
YRbilocBVTCNdQwCpVf5
Real-Time Intersection-Based Segment Aware Routing Algorithm for Urban Vehicular Networks
...Show More Authors

High vehicular mobility causes frequent changes in the density of vehicles, discontinuity in inter-vehicle communication, and constraints for routing protocols in vehicular ad hoc networks (VANETs). The routing must avoid forwarding packets through segments with low network density and high scale of network disconnections that may result in packet loss, delays, and increased communication overhead in route recovery. Therefore, both traffic and segment status must be considered. This paper presents real-time intersection-based segment aware routing (RTISAR), an intersection-based segment aware algorithm for geographic routing in VANETs. This routing algorithm provides an optimal route for forwarding the data packets toward their destination by considering the traffic segment status when choosing the next intersection. RTISAR presents a new formula for assessing segment status based on connectivity, density, load segment, and cumulative distance toward the destination. A verity period mechanism is proposed to denote the projected period when a network failure is likely to occur in a particular segment. This mechanism can be calculated for each collector packet to minimize the frequency of RTISAR execution and to control the generation of collector packets. As a result, this mechanism minimizes the communication overhead generated during the segment status computation process. Simulations are performed to evaluate RTISAR, and the results are compared with those of intersection-based connectivity aware routing and traffic flow oriented routing. The evaluation results provided evidence that RTISAR outperforms in terms of packet delivery ratio, packet delivery delay, and communication overhead.

Scopus Clarivate Crossref
View Publication
Publication Date
Mon Aug 01 2011
Journal Name
Journal Of Engineering
Preservation of Required Chlorine Concentration in Baghdad Water Supply Networks using On-Site Chlorine Injection
...Show More Authors

The chlorine concentration variation in Baghdad water networks was studied. The
chlorine data were collected from Mayoralty of Baghdad and Ministry of Environment
(MOE) for the networks for both sides of the city Karkh and Rasafa for (2008-2009). The
study of these data indicates that there are no systematic testing program .Classified GIS
maps showed that the areas far from the treatment plants have almost always low
chlorine concentration .This indicates that the problem of the low chlorine concentration
in the far areas is due to cracks of pipe along the conveyance path ,as expected. The area's
most frequently have low concentration are Al-sadir,Al-Kadhimya, and Al-Amiria . It
was found also that the chlorine c

... Show More
View Publication Preview PDF
Crossref
Publication Date
Sun May 01 2022
Journal Name
Journal Of Engineering
Estimating Pitting Corrosion Depth and Density on Carbon Steel (C-4130) using Artificial Neural Networks
...Show More Authors

The purpose of this research is to investigate the impact of corrosive environment (corrosive ferric chloride of 1, 2, 5, 6% wt. at room temperature), immersion period of (48, 72, 96, 120, 144 hours), and surface roughness on pitting corrosion characteristics and use the data to build an artificial neural network and test its ability to predict the depth and intensity of pitting corrosion in a variety of conditions. Pit density and depth were calculated using a pitting corrosion test on carbon steel (C-4130). Pitting corrosion experimental tests were used to develop artificial neural network (ANN) models for predicting pitting corrosion characteristics. It was found that artificial neural network models were shown to be

... Show More
View Publication Preview PDF
Crossref
Publication Date
Sun Dec 01 2019
Journal Name
Journal Of Economics And Administrative Sciences
Application of the Holonic Manufacturing System using the Genetic Algorithm : Case Study in Lab 7 of the General Company for the Leather Industry
...Show More Authors

The study aims to achieve several objectives, including follow-up scientific developments and transformations in the modern concepts of the Holistic Manufacturing System for the purpose of identifying the methods of switching to the entrances of artificial intelligence, and clarifying the mechanism of operation of the genetic algorithm under the Holonic Manufacturing System, to benefit from the advantages of systems and to achieve the maximum savings in time and cost of machines Using the Holistic Manufacturing System method and the Genetic algorithm, which allows for optimal maintenance time and minimizing the total cost, which in turn enables the workers of these machines to control the vacations in th

... Show More
View Publication Preview PDF
Crossref
Publication Date
Thu Jan 16 2025
Journal Name
Journal Of Physical Education
A Study of Actual Training Time Administration in Bedra Specialized Weightlifting Club
...Show More Authors

View Publication
Publication Date
Tue Jun 01 2021
Journal Name
Int. J. Nonlinear Anal. Appl.
Time series analysis of the number of covid-19 deaths in Iraq
...Show More Authors

Preview PDF
Scopus (1)
Scopus
Publication Date
Thu May 07 2015
Journal Name
Journal Of Infrared, Millimeter, And Terahertz Waves
Distinguishing Gasoline Engine Oils of Different Viscosities Using Terahertz Time-Domain Spectroscopy
...Show More Authors

View Publication
Scopus (27)
Crossref (24)
Scopus Clarivate Crossref
Publication Date
Tue Dec 29 2020
Journal Name
Iraqi Journal Of Science
Effect of Surface Recombination on Diffusion Length and Active Cavity Life time
...Show More Authors

This work presents an analytical study for simulating a Fabry-Perot Bi-stable etalon (F-P cavity) filled with a dispersive optimized nonlinear optical material (Kerr type) such as semiconductors Indium Antimonite (InSb). Depending on the obtained results and because of a trade-off between the optical path length of the sample and active cavity lifetime, an optimization procedure was applied on the InSb etalon/CO laser parameters; critical switching irradiance (Ic) was applied via simulation systems  of optimization procedures of optical cavity (Matlap program was used to study the optical Bi-stability of a nonlinear Fabry-Perot cavity). In order to achieve minimum switching power and faster switching time, the optimizatio

... Show More
View Publication Preview PDF
Scopus Crossref
Publication Date
Sun Sep 01 2013
Journal Name
Journal Of Economics And Administrative Sciences
The Use of Replacement Models On Determine the Optimal Time to Replacement
...Show More Authors

Abstract:-

            The approach maintenance and replacement one of techniques of operations research whom cares of the failure experienced by a lot of production lines which consist of a set of machines and equipment, which in turn exposed to the failure or work stoppages over the lifetime, which requires reducing the working time of these machines or equipment below what can or conuct  maintenance process once in a while or a replacement for one part of the machine or replace one of the machines in production lines. In this research is the study of the failure s that occur in some parts of one of the machines for the General Company for Vege

... Show More
View Publication Preview PDF
Crossref
Publication Date
Thu Mar 01 2018
Journal Name
Tribology International
Discriminating gasoline fuel contamination in engine oil by terahertz time-domain spectroscopy
...Show More Authors

View Publication
Scopus (14)
Crossref (12)
Scopus Clarivate Crossref
Publication Date
Sun Jul 09 2023
Journal Name
Journal Of Engineering
Solving Time-Cost Tradeoff Problem with Resource Constraint Using Fuzzy Mathematical Model
...Show More Authors

Scheduling considered being one of the most fundamental and essential bases of the project management. Several methods are used for project scheduling such as CPM, PERT and GERT. Since too many uncertainties are involved in methods for estimating the duration and cost of activities, these methods lack the capability of modeling practical projects. Although schedules can be developed for construction projects at early stage, there is always a possibility for unexpected material or technical shortages during construction stage. The objective of this research is to build a fuzzy mathematical model including time cost tradeoff and resource constraints analysis to be applied concurrently. The proposed model has been formulated using fuzzy the

... Show More
View Publication Preview PDF
Crossref (2)
Crossref