The Halabja earthquake occurred on 12/11/2017 in Iraq, with a magnitude of 7.3 Mw, which happened in the Iraqi-Iranian borders. This earthquake killed and injured many people in the Kurdish region in the north of the country. There is no natural disaster more dangerous than earthquake, especially it occurs without warning, great attention must be paid to the impact of earthquakes on the soil and preparing for a wave of earthquakes. Numerical modeling using specific elements is considered a powerful tool to investigate the required behavior of structures in Geotechnical engineering, and the main objective of this is to assess the response of the Al-Wand dam to the Halabja earthquake, as this dam is located in an area that has been subjected to seismic activity recently. The modeling was done through the Geo-studio program, where the seepage was analyzed during the Al-wand dam using the Seep/w program. It was verified that the dam was safe against seepage failure and then moved to the QUAKE/W (a subprogram of GEOSTUDIO, which is used for liquefaction modeling of earthquakes and dynamic loading and determines the movement and increased pressures of pore water that arise due to earthquake vibration or sudden shock loads). The program was used to analyze the effect of the earthquake on the porewater pressure, effective stresses, and displacements. Also, it is not clear that the significant impact the earthquake has on these values. Finally, the Slope/w program was used to analyze the stability of the dam and to calculate the safety factor of the dam in two ways, and the results of the analysis show that the dam is considered safe under the influence of the tremor.
The objective of this work is to study the influence of end milling cutting process parameters, tool material and geometry on multi-response outputs for 4032 Al-alloy. This can be done by proposing an approach that combines Taguchi method with grey relational analysis. Three cutting parameters have been selected (spindle speed, feed rate and cut depth) with three levels for each parameter. Three tools with different materials and geometry have been also used to design the experimental tests and runs based on matrix L9. The end milling process with several output characteristics is solved using a grey relational analysis. The results of analysis of variance (ANOVA) showed that the major influencing parameters on multi-objective response w
... Show MorePraise be to God, and may blessings and peace be upon our master and Prophet Muhammad and those who follow him, and may God be pleased with him
Taha is my guardian and whoever follows their path until the Day of Judgment. And after... The book (The Treasure in the Ten Recitations), written by Abu Muhammad Abdullah bin Abd al-Wasiti, who died in the year 710 AH, is considered one of the important books in recitations: because it included the universal custom that it contained in the books Al-Taysir by Al-Dani and Al-Irshad by Al-Falanisi, as the first of them was specialized.
Satisfy the second with the ten readings
May God bless my time, through His grace and generosity, to achieve this treasure and to publish it
... Show MoreIn this study, functional and numerical response tests, which are important components in the selection of biological control agent, were carried out. In functional response trials, the amount of food consumed, attack rate (a) and handling time (Th) were calculated for each developmental period, depending on the number of preys given after 24 hours. The obtained results were evaluated with the Holling. In numerical response experiments, the development of the predator insect was examined depending on the number of preys given in certain numbers (5, 10, 20, 40 and 80) and the data were recorded. This phase of the trials continued until the individuals died. At this stage of the trials, the reproductive response of the p
... Show MoreIssam al-Din al-Asfrani's footnote
On the interpretation of the oval
Imam
Issam al-Din Ibrahim Arbashah al-Asfrani
(Th 159 e)
Surah Al-Baqarah (verse 55-911)
This research represents a practical attempt applied to calibrate and verify a hydraulic model for the Blue Nile River. The calibration procedures are performed using the observed data for a previous period and comparing them with the calibration results while verification requirements are achieved with the application of the observed data for another future period and comparing them with the verification results. The study objective covered a relationship of the river terrain with the distance between the assumed points of the dam failures along the river length. The computed model values and the observed data should conform to the theoretical analysis and the overall verification performance of the model by comparing i
... Show MoreThis research represents a practical attempt applied to calibrate and verify a hydraulic model for the Blue Nile River. The calibration procedures are performed using the observed data for a previous period and comparing them with the calibration results while verification requirements are achieved with the application of the observed data for another future period and comparing them with the verification results. The study objective covered a relationship of the river terrain with the distance between the assumed points of the dam failures along the river length. The computed model values and the observed data should conform to the theoretical analysis and the overall verification performance of the model by comparing it with anothe
... Show MoreThe current study aims to find a new plan to manage the water quality of the western part of the Hammar Marsh to reduce the salts that cause problems for the marshes and preserve their environmental life by isolating the southwestern part of the Hammar Marsh by closing the outlet under the railway embankment. The outlet is discharging saline water to the east-western part of Al Hammar Marsh. After isolating the southwestern part of the marsh, a new outlet is proposed. The impact of the flow hydrodynamics on improving the water quality was simulated using the SMS model. The hydrodynamics and water quality simulation models for the marsh are : a hydrodynamic model and average depth (SMS RMA2) and a two-dimensional water quality model (SMS
... Show MoreDr. Qahtan Al-Madfa’i’s architecture has been characterized by a particular characteristic that may be unique and extreme at the same time, that is the use of the distinctive three-dimensional structural coverings and the exploitation of structural construction to give an extra aesthetic touch to the composition of the building, to achieve the application of his universal ideas, which he strongly believed and defended.
In the period of the marked urban decline that the country undergoes now, which urges us toward making a comparison between the beginning of the modern Iraqi architecture and its ascending path up to its peak and the periods of its decline until it reached a very
... Show MoreWe have found through research , that administrative institutions on the outskirts of Kufa and their management is not as important as administrative institution in place that were associated with it and subject to its control ,as it often was express power , or poor ( if true ) expression , directors of the center for the suburbs , as it became clear to our diversity of those administrative institutions and prominent role in the interest of the affairs of the people and society in all aspects of life , and are the functions and different staff from the highest authority the suburbs represented by house of representatives ( the workers ) ,then workers abscess and Al-dhaqan and not to mention for other jobs came the actions of Bhaltsier a
... Show MoreThe Taylor series is defined by the f and g series. The solution to the satellite's equation of motion is expanding to generate Taylor series through the coefficients f and g. In this study, the orbit equation in a perifocal system is solved using the Taylor series, which is based on time changing. A program in matlab is designed to apply the results for a geocentric satellite in low orbit (height from perigee, hp= 622 km). The input parameters were the initial distance from perigee, the initial time, eccentricity, true anomaly, position, and finally the velocity. The output parameters were the final distance from perigee and the final time values. The results of radial distance as opposed to time were plotted for dissimilar times in
... Show More