Preferred Language
Articles
/
XRZuR4gBVTCNdQwC2HYe
Development of a workforce sustainability model for construction
...Show More Authors

Publication Date
Mon Mar 08 2021
Journal Name
Baghdad Science Journal
A study of fermi hole for some atomic systems
...Show More Authors

the electron correlation effect for inter-shell can be described by evaluating the fermi hole and partial fermi hole for Li atom comparing with Be+ and B+2 ions

View Publication Preview PDF
Publication Date
Thu Dec 01 2016
Journal Name
Bulletin Of The Iraq Natural History Museum (p-issn: 1017-8678 , E-issn: 2311-9799)
A NEW RECORD OF ZIZIPHORA SPECIES (LAMIACEAE) FOR IRAQ
...Show More Authors

    Ziziphora persica Bunge is recorded as a new Study in Iraq. This species has been collected from Jabal Sinjar in Nineveh province in the north western part of Iraq. The morphological characters, habitat and geographical distribution of the species with a key to Ziziphora L. species in Iraq have been provided.

View Publication Preview PDF
Publication Date
Sun Feb 10 2019
Journal Name
Journal Of The College Of Education For Women
Toward a stereotype specification for measurement of university women
...Show More Authors

A- The research problem: the research problem which is the garments industry, as a
whole it does not rely on a single system in the sizes of the clothing and the working
companies, see that it is not plausible that the sizes be unificd and consistent in all companies.
The current sizes in the domestic Iraqi markets are not suitable for some females ,on the other
hand the Iraqi industry suffers the lack of a modern standard for some Iraqis female bodies.
B- The Signifiance of the research: lies in the study of the diversity of the human body
sizes and naming them to reflect the desires and requirements of the consumer and try to find
a method to meet their expectations as well as to raise the level of garments industr

... Show More
View Publication Preview PDF
Publication Date
Tue May 16 2023
Journal Name
Mathematics
A Mathematical Study for the Transmission of Coronavirus Disease
...Show More Authors

Globally, the COVID-19 pandemic’s development has presented significant societal and economic challenges. The carriers of COVID-19 transmission have also been identified as asymptomatic infected people. Yet, most epidemic models do not consider their impact when accounting for the disease’s indirect transmission. This study suggested and investigated a mathematical model replicating the spread of coronavirus disease among asymptomatic infected people. A study was conducted on every aspect of the system’s solution. The equilibrium points and the basic reproduction number were computed. The endemic equilibrium point and the disease-free equilibrium point had both undergone local stability analyses. A geometric technique was used

... Show More
View Publication Preview PDF
Scopus (8)
Crossref (4)
Scopus Clarivate Crossref
Publication Date
Tue Jan 01 2019
Journal Name
International Journal Of Information Systems And Change Management
Designing a knowledge management measurement for educational institutions: a qualitative research
...Show More Authors

View Publication
Scopus (2)
Crossref (1)
Scopus Crossref
Publication Date
Thu Jun 10 2021
Journal Name
Engineering, Technology & Applied Science Research
Corruption Risk Analysis at the Project Planning Stage in the Iraqi Construction Sector using the Bowtie Methodology
...Show More Authors

In this paper, the bowtie method was utilized by a multidisciplinary team in the Federal Board of Supreme Audit (FBSA)for the purpose of managing corruption risks threatening the Iraqi construction sector. Corruption in Iraq is a widespread phenomenon that threatens to degrade society and halt the wheel of economic development, so it must be reduced through appropriate strategies. A total of eleven corruption risks have been identified by the involved parties in corruption and were analyzed by using probability and impact matrix and their priority has been ranked. Bowtie analysis was conducted on four factors with high score risk in causing corruption in the planning stage. The number and effectiveness of the existing proactive meas

... Show More
View Publication
Scopus (6)
Crossref (5)
Scopus Clarivate Crossref
Publication Date
Fri Jul 01 2022
Journal Name
Journal Of Engineering
Use Risk Score Method to Identify the Qualitative Risk Analysis Criteria in Tendering Phase in Construction Projects
...Show More Authors

The purpose of this article was to identify and assess the importance of risk factors in the tendering phase of construction projects. The construction project cannot succeed without the identification and categorization of these risk elements. In this article, a questionnaire for likelihood and impact was designed and distributed to a panel of specialists to analyze risk factors. The risk matrix was also used to research, explore, and identify the risks that influence the tendering phase of construction projects. The probability and impact values assigned to risk are used to calculate the risk's score. A risk matrix is created by combining probability and impact criteria. To determine the main risk elements for the tender phase of

... Show More
Preview PDF
Crossref (2)
Crossref
Publication Date
Sun Oct 27 2024
Journal Name
Journal Of Economics And Administrative Sciences
An Integrated Approach to Constraints Theory and Fuzzy Analytical Hierarchy Process (FAHP) in Construction Projects (Case Study)
...Show More Authors

The research endeavors to harness the benefits stemming from the integration of constraint theory into construction project management, with the primary goal of mitigating project completion delays. Additionally, it employs fuzzy analysis to determine the relative significance of fundamental constraints within projects by assigning them appropriate weights. The research problem primarily revolves around two key issues. Firstly, the persistent utilization of outdated methodologies and a heavy reliance on workforce experience without embracing modern computerized technologies. Secondly, the recurring problem of project delivery delays. Construction projects typically encompass five fundamental constraint types: cost restrictions, tim

... Show More
Preview PDF
Crossref
Publication Date
Sat Aug 01 2015
Journal Name
Journal Of Economics And Administrative Sciences
Requirements high commitment management to achieve entrepreneurship strategic in busness organization / Field research in Iraqi construction companies
...Show More Authors

This research came to shed light on the relationship between the requirements of (practices) high commitment management (participative decision making،information sharing، training and development،team working،rewards،selective staffing،job security ) and strategic entrepreneurship dimensions (entrepreneurial culture،entrepreneurial leadership،entrepreneurial mindset، strategic management resources ) Sought to achieve the number of goals the knowledge and applied, and tested the relationship and impact between variables in a sample size of 100 directors of personnel departments and divisions and their associates in the Iraqi contractors in Baghdad (Hamorabi، Mutassim، AL Rasheed، AL Mansour  )، focused research

... Show More
View Publication Preview PDF
Crossref (1)
Crossref
Publication Date
Fri Jul 01 2022
Journal Name
Journal Of Engineering
Use Risk Score Method to Identify the Qualitative Risk Analysis Criteria in Tendering Phase in Construction Projects
...Show More Authors

The purpose of this article was to identify and assess the importance of risk factors in the tendering phase of construction projects. The construction project cannot succeed without the identification and categorization of these risk elements. In this article, a questionnaire for likelihood and impact was designed and distributed to a panel of specialists to analyze risk factors. The risk matrix was also used to research, explore, and identify the risks that influence the tendering phase of construction projects. The probability and impact values assigned to risk are used to calculate the risk's score. A risk matrix is created by combining probability and impact criteria. To determine the main risk elements for the tend

... Show More
View Publication Preview PDF