Diagnoses of Delay Causes in Construction Projects During Disaster
...Show More Authors

Purpose: The aim of this study was to gain insight into causes of time delays and cost overruns in a selection of thirty case projects in Iraq. Delay factors have been studied in many countries/contexts, but not much data exists from countries under the conditions characterizing Iraq during the last 10-15 years.Design/methodology/approach: A case study approach was adopted, with thirty construction projects selected from the Baghdad region, of different types and sizes. For the case of the study, the participants in the projects provided data about the projects through the data collection tool distributed through the questionnaire directed to them. Statistical data analysis was used to build statistical relationships between time and cost delay ratios and delay factors.Findings: Major delay factors identified were contractor failures resulting in schedule overruns, re-designs, poor planning and frequent change orders, security issues, low bid selection, weather factors, and owner failures.Originality/value: While many studies have looked into factors causing delays and cost overruns, few have studied projects in conditions such as have dominated Iraq the last decade and a half during pandemic as external factors. As such, this study offers unique insights into factors that need to be taken into account when implementing projects in such a context

Crossref
View Publication
Publication Date
Wed Jun 01 2016
Journal Name
Journal Of Engineering
Application of Total Quality Management (TQM) Requirements in Risk Management in Construction Projects in Iraq
...Show More Authors

Total quality management  considers one of the modern scientific entrances  which practiced by productivity service organizations alike to provide appropriate quality required outputs according to the needs and desires of customers manage , enable the organization seeking to continue and grow in light of the increasing competition from the satisfy and provide the appropriate total quality management requirements whenever led to face risks that they may have  in a manner in which they can be addressed and find ways to avoid them in the future when repeated.                          &n

... Show More
View Publication Preview PDF
Publication Date
Thu Feb 01 2024
Journal Name
Journal Of Engineering
Public Procurement Crisis of Iraq and its Impact on Construction Projects
...Show More Authors

 

The public procurement crisis in Iraq plays a fundamental role in the delay in the implementation of construction projects at different stages of project bidding (pre, during, and after). The procurement system of any country plays an important role in economic growth and revival. The paper aims to use the fuzzy logic inference model to predict the impact of the public procurement crisis (relative importance index and Likert scale) was carried out at the beginning to determine the most important parameters that affect construction projects, the fuzzy analytical hierarchy process (FAHP) to set up, and finally, the fuzzy decision maker's (FDM) verification of the parameter for comparison with reality. Sixty-five

... Show More
View Publication Preview PDF
Crossref
Publication Date
Sat Jan 01 2022
Journal Name
Journal Of The Mechanical Behavior Of Materials
Identifying the selection criteria of design consultant for Iraqi construction projects
...Show More Authors
Abstract<p>The quality and cost of constructed buildings are heavily influenced by the performance of design/auditing consultants. Thus, selecting the right design consultant and design auditing consultants is of utmost importance and not an easy task for any construction client. so, the client should specify the efficiency criteria and assess the performance levels of the design and design auditing consultant firm. The study aims to identify the selection criteria of the design consultant in construction projects and also identify the selection criteria of the design auditing consultant for the construction projects by using the Delphi survey with applying the principal components analysis (PCA</p> ... Show More
View Publication
Scopus (1)
Crossref (1)
Scopus Clarivate Crossref
Publication Date
Sun Jan 01 2023
Journal Name
Journal Of Engineering
Evaluation of the Current Status of the Cost Control Processes in Iraqi Construction Projects
...Show More Authors

One of the most important problems of Iraqi construction projects is the cost variances, so it is important to identify the problems and shortcomings that cause poor cost control. Through the utilization of questionnaires, the study evaluated how project costs were managed and reported. The questionnaire was distributed to 180 professionals working in the Iraqi construction sector, with a response rate of 91%. The results showed that a high percentage of projects are implemented with a difference between real and estimated costs, and the process of documenting cost data needs to be more secure. On the other hand, there is a weakness in providing the necessary work structure information to monitor costs and a lack of proc

... Show More
View Publication Preview PDF
Crossref (2)
Crossref
Publication Date
Sun Aug 03 2014
Journal Name
Journal Of Advances In Mathematics
On types of Delay in Delay Differential equation
...Show More Authors

Publication Date
Mon Jan 01 2024
Journal Name
Proceedings Of The International Conference On Research Advances In Engineering And Technology - Itechcet 2022
Suitability of Iraqi legal system for building operation transfer contract in infrastructure construction projects
...Show More Authors

View Publication
Scopus Crossref
Publication Date
Sun Jul 09 2023
Journal Name
Journal Of Engineering
Development a Proposed System of Organization Structure to Management Multi Construction Projects
...Show More Authors

The purpose of this study is aimed to lay down an arranged platform suited to Iraqi constructional associations which in charge to carry out multi constructional projects, as it fulfilled management requirements and supervising, so that low - cost projects will be controlled in due term and quality. Based on primary info and observed data collected, the study thesis has been formulated in this way: Iraqi constructional sector bodies which are in charge to implement simultaneously multi constructional projects in need to reformulate its organized structure so that it will be more fitted to management and control of these projects. This thesis includes a
theoretical part contained presenting the most important resources locally and int

... Show More
View Publication Preview PDF
Crossref
Publication Date
Wed Jun 01 2016
Journal Name
Journal Of Engineering
Management Model for Evaluation and Selection of Engineering Equipment Suppliers for Construction Projects in Iraq
...Show More Authors

Engineering equipment is essential part in the construction project and usually manufactured with long lead times, large costs and special engineering requirements. Construction manager targets that equipment to be delivered in the site need date with the right quantity, appropriate cost and required quality, and this entails an efficient supplier can satisfy these targets. Selection of engineering equipment supplier is a crucial managerial process .it requires evaluation of multiple suppliers according to multiple criteria. This process is usually performed manually and based on just limited evaluation criteria, so better alternatives may be neglected. Three stages of survey comprised number of public a

... Show More
View Publication Preview PDF
Publication Date
Sat Dec 02 2023
Journal Name
Journal Of Engineering
Empirical Study for Capturing and Allocating Significant Risk Factors in School Construction Projects in Iraq
...Show More Authors

In Iraq, more than 1031 school projects have been halted due to disputes and claims resulting from financial, contractual, or other issues. This research aims to identify, prioritize, and allocate the most critical risk factors that threaten these projects’ success for the duration (2017-2022). Based on a multi-step methodology developed through systematic literature reviews, realistic case studies, and semi-structured interviews, 47 risk factors were identified. Based on 153 verified responses, the survey reveals that the top-ranked risk factors are corruption and bribery, delaying the payments of the financial dues to the contractors or sub-contractors, absence of risk management strategy, multiple change orders due

... Show More
View Publication Preview PDF
Crossref (1)
Crossref
Publication Date
Sat Aug 01 2015
Journal Name
Journal Of Engineering
Development of a Blueprint Impact System of the risks on construction projects Implementation
...Show More Authors

In Production and Operations Management the specialists  have  tried to develop a strategy to counter the risks arising from the activities of the organization and of waste of various types and therefore the risk management in the contemporary framework represents a phenomenon of new quality, and can not be this phenomenon to take practical dimensions, but the development of culture of the organization towards the risks and deal with all aspects and paint ways to address them within an integrated program, and requires new skills and systems provide accurate information capable of coordination between the various parties within the organization.

     The research aims to develop a blu

... Show More
View Publication Preview PDF