The study focused on the results of first paleostress from thrust fault slip data on Tertiary age of Hemrin North Structure, North of Iraq. The stress inversion was performed for fault slip data using an improved right dihedral model, and then followed by rotational optimization (Georient Software). The trend of the principal stress axes (σ1, σ2 and σ3) and the ratio of the principal stress differences (R) show the main paleostress field is NE-SW compression regime. As well as using Lisle graph and Mohr diagram to determine the magnitudes of palestress. The values paleostress of the study area were σ1=1430 bars, σ2=632 bars and σ3=166 bar. The large magnitudes of the primary stress axes could be attributed to active tecto
... Show MoreThis study is directed at investigating the liquefaction potential within earth dams using numerical modelling by two-dimensional finite element analyses method for considering the Makhool earth dam on the Tigris River in Iraq. The effect of peak ground acceleration of 0.02g, 0.04g, 0.06g, and 0.08g is viewed for a shell, and the crest is presented for all scaled earthquake duration 25 s, 50 s, 75 s, and 100 s. The current study program comprises selecting a representative history point within the Makhool earth dam as a case study. Many points were allocated at different locations within the shell and crest to observe the fluctuation in the factor of safety against liquefaction. The seepage analysis results viewed graphically for the operat
... Show MoreWellbore instability problems cause nonproductive time, especially during drilling operations in the shale formations. These problems include stuck pipe, caving, lost circulation, and the tight hole, requiring more time to treat and therefore additional costs. The extensive hole collapse problem is considered one of the main challenges experienced when drilling in the Zubair shale formation. In turn, it is caused by nonproductive time and increasing well drilling expenditure. In this study, geomechanical modeling was used to determine a suitable mud weight window to overpass these problems and improve drilling performance for well development. Three failure criteria, including Mohr–Coulomb, modifie
A structural and engineering geological study of rock slope stability was carried out in six stations that lie in the Southwest of Baranan mountain, along Sirwan road. The rock slopes and discontinuities were surveyed at each of these stations, and the relationships with failures were determined. The slopes were classified on the basis of (Al-Saadi, 1981), and the rocks were described in engineering terms according to (Anon, 1972) and (Hawkins, 1986), Stereographic projection was made using software (GEOrient 9.5.0) to represent the field data that were recorded in order to understand the situation in the six stations (sites) that were chosen along Sirwan road near Darbandikhan dam, the failures' types were recorded during field study we
... Show MoreEngineering geological study of rock slope stability in two stations lying in the SW of Haibat Sultan mountain, along the Kalksmaq - Koisanjaq road was carried out. At each station, rock slopes and discontinuities were comprehensively surveyed and the relationships with failures were determined. The limestone rock was described in engineering terms, the types of failures recorded during field study were rock roll and toppling whiles the probable failures were sliding, toppling, and rock roll. The study also revealed that the factors affecting slope stability in the study area were slope angle, height, dip of strata, and discontinuities (which are almost perpendicular to the bedding plane). The laboratory test, of the rock samples (point-
... Show MoreThe road network in the Baranan mountain, near Dararash village, connecting Sulaymaniyah city with Qaradagh town, plays a major role in socio- economic activities of Qaradagh town and its surrounding villages. Any type of slope failure in the area may cause breaking up in traffic, loss of lives, and injuries.
For assessing the stability of rock slopes in the area, seven stations (rock-cut slopes) were selected along the road and evaluated by kinematic analysis, using DIPS v6.008 software and slope mass rating system (SMRTool - v205 software).
The kinematic analysis revealed that planar and wedge sliding may occur in stations no.2, 5, 6, and 7, flexural toppling
... Show MoreThe road network in Surdash anticline is considered as an important road network connecting lower Dukan town with the touristic upper Dukan town. Dukan lake plays an important role in the social and economic activities of Dukan town and the surrounding areas.
For assessing the stability of the rock slopes in the area, 9 stations were selected along the upper Dukan road on both sides of Surdash anticline, and their stability was evaluated by the kinematic analysis using DIPS V6.008 software.
Kinematic analysis of the studied stations shows thatplanar sliding is possible in stations No. 1, 2, 3 and 8, while wedge sliding is possible in station No. 5, 6, 7 and 9b. The other stations (No. 4and 9a) are stable. Tectonic structures
This Study aims to engineering geological evaluation of Fatha and Injana Formations in northern Hamrin anticline throughout geological and engineering geological Survey including Preparing engineering geological map (Scale1:90000) and Studying rock Slopes Stability in (6) Stations ,representing all types of failures (taken place and possible).General Survey for rock Slopes included Classification and engineering description according to [1], [2]. The slopes in the area are Classified based on the direction of the Strike Slopes and Strike of beds into Parallel, Oblique Lateral and orthogonal Slopes according to [3].Classification and the Slope Types are Concordant Slope and discordant Slope . The rocks in the area consists of two engineer