Diyala Governorate was recently exposed to high flood waves discharged from Hemrin Dam. Since the dam was at its full capacity during the flood period, these waves were discharged to the Diyala River. Because of the reduction in Diyala River capacity to 750m3/s, the cities and villages on both sides of the river banks were inundated. Thus, the study's objective is to design a flood escape out of the Diyala River, to discharge the flood wave through it. The flood escape simulation was done by using HEC- RAS software. Two hundred twenty-three cross sections for the escape and 30 cross-sections of the Diyala River were used as geometric data. Depending on the geological formation that the escape passed t
... Show MoreThis study examined the imperative construction: the command, the interrogative, the prohibition, the call, and the wish. In the Diwan of Al-Shamakh bin Dirar; where the poetic verses were monitored in each of the topics of the student's creation, and the rhetorical meanings that he came out with. What is new in this study is that it is the first to study the demanded composition in the poetry of a glorious poet, Al-Shammakh bin Dirar Al-Dhubyani. As his poetry did not receive such a study, it sought to employ what was written by rhetoric scholars, in an attempt to explore the demanded composition in the poetry of Al-Shamakh. The study adopted the descriptive analytical approach, which is based on counting the number of times the poet us
... Show MoreLiquid membrane electrodes for the determination iron(III) were constructed based on chloramphenicol sodium succinate and iron(III) CPSS-Fe(III) as ion pair complex, with four plasticizers Di-butyl phosphate (DBP); Di-butyl phthalate (DBPH); Di-octyl phthalate (DOP); Tri-butyl phosphate (TBP); in PVC matrix . These electrodes give Nernstian and sub-Nernstian slopes (19.79, 24.60, 16.01 and 13.82mV/decade) and linear ranges from (1x10-5-1x10-2 M, 1x10-5-1x10-2 M, 1x10-6-1x10-2 M and 1x10-5-1x10-2 M) respectively. The best electrode was based on DBP plasticizer which gave a slope 19.79 mV/decade, correlation coefficient 0.9999, detection limit of 9×10-6 M, lifetime 37 day displayed good stability and reproducibility and used to determine
... Show MoreConstruction projects have a special nature and affect them many factors making them exposed to multiple risks as a result of the length of the implementation period and the multiplicity of stages, starting from the decision stage through implementation until the final delivery, which leads to increased uncertainty and the likelihood of risk.
The process of analysis and risk management is one of the effective and productive methods that are used in managing the construction projects for the purpose of increasing the chances of ending the project successfully in terms of cost, time and quality and at the lowest possible problems.
The research aims first to the effective planning for analysis and risk managemen
... Show MoreThis research investigated the importance and priorities of the project overhead costs in Iraq via a questionnaire using the fuzzy analytic hierarchy process technique (FAHP). Using this technique is very important in the uncertain circumstances as in our country. The researcher reached to frame an equation through the results of the priorities of weights include the percentages of each of the main items of the project overhead costs. The researcher tested this equation by applying it to one of the completed projects and the results showed suitability for the application. The percentages of the (salaries, grants, and incentives) and (fieldwork requirements) in equation represent approximately two-thirds of project overhe
... Show MoreThe construction sector in Iraq has faced many challenges. One of the major challenges is the lack of productivity of laborers who are working construction sites. Although research studies have been conducted to investigate, explore, and identify factors influencing labor productivity in the Middle-east region, the lack of such research studies to address these challenges in Iraq. This motivates the researcher to explore and identify the key factors affecting labor productivity in construction sites across different organizational structures (Matrix, Projectized, and functional). A survey questionnaire has been conducted using Delphi technique in order to achieve a concrete and reliab
Form of investment in infrastructure important factor to drive economic growth in any country, with the dwindling ability of governments to provide the necessary funds for such investments, emerged as a rising trend for private sector involvement in public projects and infrastructure, and one of these trends is the build-operate-transfer system (BOT), which commonly used in various developed and developing countries as one of the tools used in the implementation of these investments, as the private sector under this system design, finance, build and operate the project, and are re-administration of the state after a certain period under a contractual agreement between the parties of the contract. As this system provides majo
... Show MoreAbstract
Uncertainty, the deeply-rooted fact that surrounding the investment environment, especially the stock market which just prices have taken a specific trend until they moved to another one for its up or down. This means that the volatility characteristic of financial market requires the rational investor an argument led towards the adoption of planned acts to gain greater benefit in the goal of wealth maximizing. There is no possibility to achieve this goal without the burden of uncertainty and the risk of systematic fluctuations of investment returns in the financial market after the facts of efficient diversification have pro
... Show MoreThe construction industry presents significant high risks of injury and fatality to its workforce. Adopting prevention through design (PtD) principles is reported to have high potential for mitigating such risks and improving safety outcomes. PtD seeks to assess and reduce workplace hazards during the design phase, minimizing unsafe construction conditions. Despite its potential benefits, the construction industry encounters challenges in effectively utilizing PtD. Thus, the implementation of PtD in the US construction industry is limited, and designers’ awareness remains low. This evident lack of utilization warrants further examination of the contributing factors. The goal of this study is to identify and rank PtD utilization ba
... Show More