The aim of this research work is to study the effect of stabilizing gypseous soil, which covers vast areas in the middle, west and south parts of Iraq, using liquid asphalt on its strength properties to be used as a base course layer replacing the traditional materials of coarse aggregate and broken stones which are scarce at economical prices and hauling distances. Gypseous soil brought from Al-Ramadi City, west of Iraq, with gypsum content of 66.65%, medium curing cutback asphalt (MC-30), and hydrated lime are used in this study. The conducted tests on untreated and treated gypseous soil with different percentages of medium curing cutback asphalt (MC-30), water, and lime were: unconfined compression strength, and one dimensional confined compression under both dry and absorbed test conditions. The test results showed that stabilizing gypseous soil using the optimum fluid content of 16% (5% cutback asphalt+11% water) have improved the unconfined compressive strength, compressibility, rebound consolidation, and waterproofing of gypseous soil, but under absorbed condition the stabilized gypseous soil using cutback asphalt only did not satisfy the requirements for base course construction, therefore it was decided to use lime additive to improve the properties of soil-cutback mixture under absorbed condition.
Highway embankments stability during its service period represents an important factor for the safety of highway users and vehicles. Consequently, the cost of construction of these embankments should be adequate to maintain the safety and durability during this period through proper estimation of the loading on asphalt pavement, slope stability, horizontal and vertical deformation, etc. Slope stability of the embankment mainly depends on the shear strength of the soil layers materials; this shear strength is affected by the water table level through the contribution of the capillary water. Negative pore water pressure above the water table level evolves matric suction in the unsaturated zone above water table; this matric suction increases
... Show MoreOne of the most important problems of Iraqi construction projects is the cost variances, so it is important to identify the problems and shortcomings that cause poor cost control. Through the utilization of questionnaires, the study evaluated how project costs were managed and reported. The questionnaire was distributed to 180 professionals working in the Iraqi construction sector, with a response rate of 91%. The results showed that a high percentage of projects are implemented with a difference between real and estimated costs, and the process of documenting cost data needs to be more secure. On the other hand, there is a weakness in providing the necessary work structure information to monitor costs and a lack of proc
... Show MoreThe experiment was conducted in Baghdad for study effect using mold board and disc plows as main factor , and second factor was three speeds 1.85 , 3.75 and 5.62 km / hr , and sub-second factor was three levels of soil moisture 21,18 and 14 % to determined data fuel consumption and economy costs machine unit in silt clay loam with depth 22cm. The experiment was a split – split plot arrangement in a randomized complete block design with three replications and statistical analysis using Least Significant Design 0.05 was used to compare the means of treatments. Mold board recorded least fuel consumption and cast fixed and variable and management and total costs of tractor and plow costs and total cost. Increasing forward speeds of the t
... Show MoreThe paper deals with claims in construction projects in Iraq and studies their types, causes, impacts, resolution methods and then proposes a management system to control the impacts of claims. Two parts have been done to achieve the research objective (theoretical part and practical part). The findings showed that the main types of the claims are extra work claims, different site condition claims, delay claims and the main causes of the claims are variation of the orders, design errors and omission, delay in payments by owner, variation in quantities and scheduling errors. The claims have bad impacts on the cost by increasing (10% to 25%) and also on the duration of the project by increasing from (25% to 50%).The negotiation is the main
... Show MoreThis work involves the calculation of the cooling load in Iraqi building constructions taking in account the effect of the convective heat transfer inside the buildings. ASHRAE assumptions are compared with the Fisher and Pedersen model of estimation of internal convective heat transfer coefficient when the high rate of ventilation from ceiling inlet configuration is used. Theoretical calculation of cooling load using the Radiant Time Series Method (RTSM) is implemented on the actual tested spaces. Also the theoretical calculated cooling loads are experimentally compared by measuring the cooling load in these tested spaces. The comparison appears that using the modified Fisher and Pedersen model when large ventilation ra