Concrete structures are exposed to aggressive environmental conditions that lead to corrosion of the embedded reinforcement and pre-stressing steel. Consequently, the safety of concrete structures may be compromised, and this requires a significant budgets to repair and maintain critical infrastructure. Prediction of structural safety can lead to significant reductions in maintenance costs by maximizing the impact of investments. The aim of this paper is to establish a framework to assess the reliability of existing post-tensioned concrete bridges. A time-dependent reliability analysis of an existing post-tensioned involving the assessment of Ynys-y-Gwas bridge has been presented in this study. The main cause of failure of this bridge was corrosion of tendons, making it a relevant case study to evaluate the effect of corrosion on bridge safety. Uncertainties associated with material properties, geometry, loads and corrosion parameters are taken into account. The probabilistic models of the uncertainties are combined with a non-linear finite element analysis to study the effect of tendons pitting corrosion on the post-tensioned concrete bridge. The limit state function considered is flexural strength. The Monte-Carlo simulation (MCS) method is used to compute the statistical parameters of the resisting bending moment through a MATLAB code running ABAQUS. It was found that the reliability index for the first year of bridge service life is below the minimum value acceptable for structures. The study confirmed that this bridge was a high risk structure due to its design and location. The proposed framework can be used by engineers and researchers as a tool to support decision for segmental post-tensioned (PT) bridges maintenance since they need for a regular inspection due to their risk to corrosion.
Abstract
Travel Time estimation and reliability measurement is an important issues for improving operation efficiency and safety of traffic roads networks. The aim of this research is the estimation of total travel time and distribution analysis for three selected links in Palestine Arterial Street in Baghdad city. Buffer time index results in worse reliability conditions. Link (2) from Bab Al Mutham intersection to Al-Sakara intersection produced a buffer index of about 36% and 26 % for Link (1) Al-Mawall intersection to Bab Al- Mutham intersection and finally for link (3) which presented a 24% buffer index. These illustrated that the reliability get worst for link
... Show MoreThe main objective of the central bank is to achieve price stability and target in fractionates. Therefore, the bank sought to use modern tools and policies in order to reduce the negative effects of the accumulation of foreign reserves represented by monetary sterilization, similar to developed and developing countries alike, but with different available tools that are possible and imposed by the local financial and monetary environments, such as the window for buying and selling foreign currency, open market operations and deposit facilities. And lending existing. Because any in crease in the monetary base resulting from the accumulation of foreign reserves will affect price stability directly due to the consumer nature of the
... Show MoreThe Estimation Of The Reliability Function Depends On The Accuracy Of The Data Used To Estimate The Parameters Of The Probability distribution, and Because Some Data Suffer from a Skew in their Data to Estimate the Parameters and Calculate the Reliability Function in light of the Presence of Some Skew in the Data, there must be a Distribution that has flexibility in dealing with that Data. As in the data of Diyala Company for Electrical Industries, as it was observed that there was a positive twisting in the data collected from the Power and Machinery Department, which required distribution that deals with those data and searches for methods that accommodate this problem and lead to accurate estimates of the reliability function,
... Show MoreThe aim of this study is to investigate the behavior of composite castellated beam in which the concrete slab and steel beam connected together with headed studs shear connectors. Four simply supported composite beams with various degree of castellation were tested under two point static loads. One of these beams was built up using standard steel beam, i.e. without web openings, to be a reference beam. The other three beams were fabricated from the same steel I-section with various three castellation ratios, (25, 35, and 45) %. In all beams the concrete slab has the same section and properties. Deflection at mid span of all beams was measured at each 10 kN load increment. The test results show that the castellation process leads to
... Show MoreIn this paper, the Reliability Analysis with utilizing a Monte Carlo simulation (MCS) process was conducted on the equation of the collapse potential predicted by ANN to study its reliability when utilized in a situation of soil that has uncertainty in its properties. The prediction equation utilized in this study was developed previously by the authors. The probabilities of failure were then plotted against a range of uncertainties expressed in terms of coefficient of variation. As a result of reliability analysis, it was found that the collapse potential equation showed a high degree of reliability in case of uncertainty in gypseous sandy soil properties within the specified coefficient of variation (COV) for each property. When t
... Show More
Statistical control charts are widely used in industry for process and measurement control . in this paper we study the use of markov chain approach in calculating the average run length (ARL) of cumulative sum (Cusum) control chart for defect the shifts in the mean of process , and exponentially weighted moving average (EWMA) control charts for defect the shifts for process mean and , the standard deviation . Also ,we used the EWMA charts based on the logarithm of the sample variance for monitoring a process standard deviation when the observations (products are selected from al_mamun factory ) are identically and independently distributed (iid) from normal distribution in continuous manufacturing .
The main focus of research is on how to achieve the internal and external dimensions of corporate social responsibility through human resources management strategies, which is a major of research aimed. The main problem of this research was confirmed, which confirms that there is an unclear role for social responsibility, lack of human resources management strategies, and ambiguity of roles in the municipality under study. The diagnose of the problem and determining the gap between the internal and external dimensions of social responsibility and human resources management was identified, which attacked the researcher's attention to navigate in this subject, look for the reasons for the gaps and try to reduce them. The case study
... Show More