This study examines the causes of time delays and cost overruns in a selection of thirty post-disaster reconstruction projects in Iraq. Although delay factors have been studied in many countries and contexts, little data exists from countries under the conditions characterizing Iraq during the last 10-15 years. A case study approach was used, with thirty construction projects of different types and sizes selected from the Baghdad region. Project data was gathered from a survey which was used to build statistical relationships between time and cost delay ratios and delay factors in post disaster projects. The most important delay factors identified were contractor failure, redesigning of designs/plans and change orders, security is
... Show MoreModern automation robotics have replaced many human workers in industrial factories around the globe. The robotic arms are used for several manufacturing applications, and their responses required optimal control. In this paper, a robust approach of optimal position control for a DC motor in the robotic arm system is proposed. The general component of the automation system is first introduced. The mathematical model and the corresponding transfer functions of a DC motor in the robotic arm system are presented. The investigations of using DC motor in the robotic arm system without controller lead to poor system performance. Therefore, the analysis and design of a Proportional plus Integration plus Divertive (PID) controller is illustrated.
... Show MoreThis article presents the results of an experimental investigation of using carbon fiber–reinforced polymer sheets to enhance the behavior of reinforced concrete deep beams with large web openings in shear spans. A set of 18 specimens were fabricated and tested up to a failure to evaluate the structural performance in terms of cracking, deformation, and load-carrying capacity. All tested specimens were with 1500-mm length, 500-mm cross-sectional deep, and 150-mm wide. Parameters that studied were opening size, opening location, and the strengthening factor. Two deep beams were implemented as control specimens without opening and without strengthening. Eight deep beams were fabricated with openings but without strengthening, while
... Show MoreExcessive water production is a persistent challenge in oil and gas wells, with polymer and gel solutions commonly employed for water control. This study investigates the rheological behaviour of cross-linked polyacrylamide gels and their impact on water shutoff treatment in gas wells. Rheological measurements, coreflooding experiments using Berea sandstone samples, and micromodel flow visualizations were conducted to evaluate gel performance. Results showed that during water injection, the water residual resistance factor ( Frrw ) decreases with increasing flow rates, mainly due to gel shear thinning behaviour and reduced residual gas saturation. Higher polymer concentrations in the gel enhance water permeability reduction. In contrast, un
... Show More
The complete genome sequence of bacteriophage VPUSM 8 against O1 El Tor Inaba
This study focuses on the impact of technology on creating a dystopian world as presented by the English playwright Caryl Churchill in her play A Number (2002). This dramatic work came as a reaction to the most crucial and valuable turning point in the scientific achievements of human engineering, namely, the cloning of the sheep called Dolly. Therefore, A Number is a play that presents an analytical stage for imagining the biotechnological and scientific future. This dramatic vignette captures the playwright’s fears towards the abnormal progress of technology and science and how far such technological progress affects human relationships and identity. It also portrays how technological progress results in the feeling of a lack of
... Show MoreThis article presents the results of an experimental investigation of using carbon fiber–reinforced polymer sheets to enhance the behavior of reinforced concrete deep beams with large web openings in shear spans. A set of 18 specimens were fabricated and tested up to a failure to evaluate the structural performance in terms of cracking, deformation, and load-carrying capacity. All tested specimens were with 1500-mm length, 500-mm cross-sectional deep, and 150-mm wide. Parameters that studied were opening size, opening location, and the strengthening factor. Two deep beams were implemented as control specimens without opening and without strengthening. Eight deep beams were fabricated with openings but without strengthening, while
... Show MoreAmong a collection of leafhoppers from Erbil Province in Kurdistan/Iraq, a new species of the genus Arboridia Zakhvatkin, 1946 was designated and described here as a new species to the science. The erection of this species was mainly built on the external characters included the male genitalia. Sites and dates of collections so as the host-plants were verified.