Numerical Study of the Seismic Response of Closed-Ended Pipe Pile in Cohesionless Soils
...Show More Authors
The concept of -closedness, a kind of covering property for topological spaces, has already been studied with meticulous care from different angles and via different approaches. In this paper, we continue the said investigation in terms of a different concept viz. grills. The deliberations in the article include certain characterizations and a few necessary conditions for the -closedness of a space, the latter conditions are also shown to be equivalent to -closedness in a - almost regular space. All these and the associated discussions and results are done with grills as the prime supporting tool.
This study focuses on the modeling of manufactured damper when used in steel buildings. The main aim of the manufactured dampers is to protect the steel buildings from the damaging effects that may result due to earthquakes by introducing an extra damping in addition to the traditional damping.
Only Pure Manufactured Dampers, has been considered in this study. Viscous modeling of damping is generally preferred in structural engineering as it leads to a linear model then it has been used during this study to simulate the behavior of the Pure Manufactured Damper.
After definition of structural parameters of a manufactured damper (its stiffness and its damping) it can be used as a structural element that can be added to a mathematica
There are many events which causes nonproductive time (NPT) in the drilling industry. The mostly effective in this NPT is pipe sticking event. A considerable amount of time and resources can be spent in efforts to free a stuck pipe. In addition, Unsuccessful fishing operations results in costly alternatives including side-tracking. The drilling in Khabaz oil field poses many operational challenges among of them stuck pipe , lost circulation, flow of salt water during drilling, and hole caving. Stuck pipe can be considered the quite difficult problem in Khabaz oil field due to associated incidents which lead to NPT activities.Well Khabaz -34 was selected to study the problem of stuck pipe in this field. An analysis of stuck pipe even
... Show MoreThere are many events which causes nonproductive time (NPT) in the drilling industry. The mostly effective in this NPT is pipe sticking event. A considerable amount of time and resources can be spent in efforts to free a stuck pipe. In addition, Unsuccessful fishing operations results in costly alternatives including side-tracking. The drilling in Khabaz oil field poses many operational challenges among of them stuck pipe , lost circulation, flow of salt water during drilling, and hole caving. Stuck pipe can be considered the quite difficult problem in Khabaz oil field due to associated incidents which lead to NPT activities.
Well Khabaz -34 was selected to study the problem of stuck pipe in this field. An analysis of stuck pipe event
Abstract Throughout this paper R represents commutative ring with identity and M is a unitary left R-module, the purpose of this paper is to study a new concept, (up to our knowledge), named St-closed submodules. It is stronger than the concept of closed submodules, where a submodule N of an R-module M is called St-closed (briefly N ≤Stc M) in M, if it has no proper semi-essential extensions in M, i.e if there exists a submodule K of M such that N is a semi-essential submodule of K then N = K. An ideal I of R is called St-closed if I is an St-closed R-submodule. Various properties of St-closed submodules are considered.
The need for Dewatering is very important in construction workshops field and sometimes it needs to pay more attention as a result of its impacts on causing additional settlement of nearby pile foundations. Dewatering construction may become a costly topic if ignored during project planning and designing .In this paper a simplified procedure maybe adopted to calculate the foundation settlement induced by using dewatering system which is required to lower the water table level to reach a dry condition during construction. Synthesized case study adopted at a specified location in Baghdad city and analysis are computed for two types of piles both of them are submerged with water. Results shows the effect of dewatering on pile foundatio
... Show MoreAs the temperature of combustion gases is higher than the melting temperature of the turbine materials, cooling of turbine parts in a gas turbine engine is necessary for safe operation. Cooling methods investigated in this computational study included cooling flow losses. Film-cooling is one typically used cooling method whereby coolant is supplied through holes passage, in present study the holes placed along the camber line of the blade. The subject of this paper is to evaluate the heat transfer that occur on the holes of blade through different
blowing coolant rates. The cases of this study were performed in a low speed wind tunnel with two tip gap at small and large (0.03 and 0.09cm) and multiple coolant flow rates through the fil
Construction projects are characterized as projects with multi phases and activities, complex, unique, and have many different parties and stakeholders. Risks could appear at one or more of the construction project stages and may affect the achievement of project objectives. Therefore, one of the key elements in the planning phase of any project is the risk management process (RMP). This study attempts to understand the terminology of risk in general, risk management, and response to risk in particular. This study is mainly a review of thirty-eight studies that have been published between 1997 and 2020 that demonstrate the importance of the crucial phase of risk response from the risk management process and its impact on
... Show MoreThis study comprised three traverses extending parallel through the Northern, Central and Southern Mahmudiya districts, and perpendicular to the course of the Euphrates River. They were identified to collect (15) soil samples and some water samples as distributed within the land cover classes of the study area. Those classes were determined by visual interpretation and supervised classification for Landsat (TM) images obtained in August/2007. The digital classification was based on Maximum Likelihood method using six spectral bands excluding the thermal band. Chemical and physical laboratory analysis for the soil characteristics was performed to determine the types of land degradation in the study area.
The results showed that the hig