An Optimal Algorithm for HTML Page Building Process
The Planning and Resource Development Department of the Iraqi Ministry of Health is very interested in improving medical care, health education, and village training programs. Accordingly, and through the available capabilities of the ministry, itdesires to allocate seven health centers to four villages in Baghdad, Iraq therefore the ministry needs to determine the number of health centers allocated to each of these villages which achieves the greatest degree of the overall effectiveness of the seven health centers in a fuzzy environment. The objective of this study is to use a fuzzy dynamic programming(DP) method to determine the optimal allocation of these centers, which allows the greatest overall effectiveness of these health centers
... Show MoreIn the modern world, wind turbine (WT) has become the largest source of renewable energy. The horizontal-axis wind turbine (HAWT) has higher efficiency than the vertical-axis wind turbine (VAWT). The blade pitch angle (BPA) of WT is controlled to increase output power generation over the rated wind speed. This paper proposes an accurate controller for BPA in a 500-kw HAWT. Three types of controllers have been applied and compared to find the best controller: PID controller (PIDC), fuzzy logic type-2 controller (T2FLC), and hybrid type-2 fuzzy-PID controller (T2FPIDC). This paper has been used Mamdani and Sugeno fuzzy inference systems (FIS) to find the best inference system for WT controllers. Furthermore, genetic algorithm (GA) and particl
... Show MoreNegotiation is considered as one of the most important kinds of communication in the contemporary organizations, which depend on the important role of managerial information systems in providing necessary and suitable information for success of the negotiation process.
Accordingly, this study aims at measuring the extent of the variables effect of managerial information system in the negotiation process.
To achieve this study, two hypotheses were chosen; the first is the correlation relation and the second is the effect, and statistical means represented by correlation coefficient "Spearman" and (R2) were used.
A Number of conclusions were
... Show MoreThe research endeavors to harness the benefits stemming from the integration of constraint theory into construction project management, with the primary goal of mitigating project completion delays. Additionally, it employs fuzzy analysis to determine the relative significance of fundamental constraints within projects by assigning them appropriate weights. The research problem primarily revolves around two key issues. Firstly, the persistent utilization of outdated methodologies and a heavy reliance on workforce experience without embracing modern computerized technologies. Secondly, the recurring problem of project delivery delays. Construction projects typically encompass five fundamental constraint types: cost restrictions, tim
... Show MoreThe regression analysis process is used to study and predicate the surface response by using the design of experiment (DOE) as well as roughness calculation through developing a mathematical model. In this study; response surface methodology and the particular solution technique are used. Design of experiment used a series of the structured statistical analytic approach to investigate the relationship between some parameters and their responses. Surface roughness is one of the important parameters which play an important role. Also, its found that the cutting speed can result in small effects on surface roughness. This work is focusing on all considerations to make interaction between the parameters (position of influenc
... Show MoreBuildings begin to deteriorate gradually over time due to several factors, including environmental influences, improper use of the building, and neglected repairs for damages during the building's life span. Effective maintenance practices can minimize operational costs, extend the life of building systems and components, improve energy efficiency, and maintain property value. This paper aims to review articles related to building maintenance to identify factors affecting maintenance practices. After conducting the review, the result was that there were 33 factors affecting building maintenance categorized into six groups: management-related factors, manpower-related factors, technical-related factors, financial-
... Show MoreThe studying trying to determine the role of Strategic Intelligence on the Process of Green Manufacturing of Sample of Mineral water factories at Dahuk city. The study submit a theoretical frame of Strategic Intelligence and Green Manufacturing, a supposed sample, had been set to reverye the nature of the relations and effect in the study Varity, the study depend on group of the main and branch concurring with the relations and effect between the Strategic Intelligence and Green Manufacturing to answer the following questions about research to problems:
What are the relationships and effects between stra
... Show MoreIn this paper, a discretization of a three-dimensional fractional-order prey-predator model has been investigated with Holling type III functional response. All its fixed points are determined; also, their local stability is investigated. We extend the discretized system to an optimal control problem to get the optimal harvesting amount. For this, the discrete-time Pontryagin’s maximum principle is used. Finally, numerical simulation results are given to confirm the theoretical outputs as well as to solve the optimality problem.
In this paper, the reliability and scheduling of maintenance of some medical devices were estimated by one variable, the time variable (failure times) on the assumption that the time variable for all devices has the same distribution as (Weibull distribution.
The method of estimating the distribution parameters for each device was the OLS method.
The main objective of this research is to determine the optimal time for preventive maintenance of medical devices. Two methods were adopted to estimate the optimal time of preventive maintenance. The first method depends on the maintenance schedule by relying on information on the cost of maintenance and the cost of stopping work and acc
... Show More