The existing study aimed to assess four soil moisture sensors’ capacitive (WH51 and SKU: S EN0193) and resistive (Yl69 and IC Station) abilities, which are affordable and medium-priced for their accuracy in six common soil types in the central region of Iraq. The readings’ calibration for the soil moisture sensor devices continued through two gravimetric methods. The first depended on the protocols’ database, while the second was the traditional calibration method. The second method recorded the lowest analysis error compared with the first. The moderate-cost sensor WH51 showed the lowest standard error (SE), MAD , and RMSE and the highest R² in both methods. The performance accuracy of WH51 was close to readings shown by the manufacturing company (1%), as the MAD amounted to 1.62%. Through both methods, the average MAD for sensors ranged from 4.76% to 7.36%, with this result considered acceptable, especially for low-cost sensors with insufficient available information for accuracy. In general, the average mean absolute percentage (MAPE) for all sensors was 25.54%, which means that the validity of the measurement for the l ow-cost sensors reached 7 5%. It encourages their use by plant breeders in irrigation, as the error rate was less than the specified depletion of 50% for available water in irrigation, where all study textures showed that the sensor reading reached the limits of 72 (±2), adopting 3% MAD for all sensors. The study affirms that, except for the IC station sensor recommended for irrigation use only in sandy-sandy loam soils, low-cost sensors have suitable accuracy for irrigation management.
A field experiment is conducted to study the effect of different levels of peat (0, 25, 50, 75, and 100 Mg ha-1 to uncropped and cropped soil to wheat. Soil samples are taken in different period of time (0, 3, 30, 60, 90, 120, and 180 days after cultivation to determine (NaHCO3-Exteractable P at 3 different depths (0-10, 10-20, and 20-30 cm). Field Experiment is conducted in a randomized complete block design (RCBD) with four replicates. Wheat, Al-Rasheed variety, is cultivated as a testing crop. The entire field is equally dived in two divisions. One of the two divisions is cultivated to wheat and the second is left uncropped. The effect of five levels of peat namely 0, 25, 50, 75, 100 Mg ha-1 is investigated. Soils are fully analyzed
... Show MoreAbstract
The Non - Homogeneous Poisson process is considered as one of the statistical subjects which had an importance in other sciences and a large application in different areas as waiting raws and rectifiable systems method , computer and communication systems and the theory of reliability and many other, also it used in modeling the phenomenon that occurred by unfixed way over time (all events that changed by time).
This research deals with some of the basic concepts that are related to the Non - Homogeneous Poisson process , This research carried out two models of the Non - Homogeneous Poisson process which are the power law model , and Musa –okumto , to estimate th
... Show Moreطريقة سهلة وبسيطة ودقيقة لتقدير السبروفلوكساسين في وجود السيفاليكسين او العكس بالعكس في خليط منهما. طبقت الطريقة المقترحة بطريقة الاضافة القياسية لنقطة بنجاح في تقدير السبروفلوكساسين بوجود السيفاليكسين كمتداخل عند الاطوال الموجية 240-272.3 نانوميتر وبتراكيز مختلفة من السبروفلوكساسين 4-18 مايكروغرام . مل-1 وكذلك تقدير السيفاليكسين بوجود السبروفلوكساسين الذي يتداخل باطوال موجية 262-285.7 نانوميتر وبتراكيز مخ
... Show More
Software cost management is a significant feature of project management. As such, it needs to be employed in a project or line of work. Software cost management is integral to software development failures, which, in turn, cause software failure. Thus, it is imperative that software development professionals develop their cost management skills to deliver successful software projects. The aim of this study is to examine the impact of cost management success factors with project management factors and three agile methodologies – Extreme Programming (XP), Scrum and Kanban methodologies which are used in the Pakistani software industry. To determine the results, the researchers applied quantitative approach through an extensive survey on
... Show MoreIn this research, the problem of ambiguity of the data for the project of establishing the typical reform complex in Basrah Governorate was eliminated. The blurry of the data represented by the time and cost of the activities was eliminated by using the Ranking function and converting them into normal numbers. Scheduling and managing the Project in the Critical Pathway (CPM) method to find the project completion time in normal conditions in the presence of non-traditional relationships between the activities and the existence of the lead and lag periods. The MS Project was used to find the critical path. The results showed that the project completion time (1309.5) dinars and the total cost has reached (33113017769) dinars and the
... Show MorePurpose: The main objective of this paper is, to determine the optimal no. of technicians’ men in a workshop crew of an Industrial System. Theoretical framework: The purpose of applying these tools is to explore their ability to reduce costs and improvements that can be obtained in the process of providing services to the end customer. Design/methodology/approach: The literature structure review was built from analyzing 12 of scientific papers and books, from web sciences and the Elsevier database. The papers were analyzed from descriptive, methodologic, and citation characteristics. Finding: By applying the equation model of the paper, the optimal no. of technician men in the crew of the workshop can be determined when
... Show MoreInfrastructure, especially wastewater projects, plays an important role in the life of residential communities. Due to the increasing population growth, there is also a significant increase in residential and commercial facilities. This research aims to develop two models for predicting the cost and time of wastewater projects according to independent variables affecting them. These variables have been determined through a questionnaire distributed to 20 projects under construction in Al-Kut City/ Wasit Governorate/Iraq. The researcher used artificial neural network technology to develop the models. The results showed that the coefficient of correlation R between actual and predicted values were 99.4% and 99 %, MAPE was
... Show MorePurpose/objective:
1 - To explain the financial impact of the activities and areas of human resources management and the adoption of the methodology for estimating costs on the basis of conduct and statement of how to assess costs and benefits of human resource activities.
2 - Measuring human capital, and its impact on the financial statements.
Design/methodology/approach:
Concentrated dimensions of the research paper's lack of financial statements prepared by the organizations for information mandated human resource its components of the three (attraction - development
... Show MoreThe main aim of this research is to introduce financing cost optimization and different financing alternatives. There are many studies about financing cost optimization. All previous studies considering the cost of financing have many shortcomings, some considered only one source of financing as a credit line without taking into account different financing alternatives. Having only one funding alternative powers, restricts contractors and leads to a very specific financing model. Although it is beneficial for the contractor to use a long-term loan to minimize interest charges and prevent a substantial withdrawal from his credit line, none of the existing financial-based planning models have considered long-term loans in
... Show More