The need for Dewatering is very important in construction workshops field and sometimes it needs to pay more attention as a result of its impacts on causing additional settlement of nearby pile foundations. Dewatering construction may become a costly topic if ignored during project planning and designing .In this paper a simplified procedure maybe adopted to calculate the foundation settlement induced by using dewatering system which is required to lower the water table level to reach a dry condition during construction. Synthesized case study adopted at a specified location in Baghdad city and analysis are computed for two types of piles both of them are submerged with water. Results shows the effect of dewatering on pile foundation settlement, consolidation of soil around the pile shaft, soil-pile interaction and negative skin friction.
In this study the rate of infection in acute and chronic Toxoplasma gondii parasite that causes toxoplasmosis was determined. This study was Included 120 blood samples that collected from pregnant women revisions to some clinics and laboratories in Baghdad civil as well as 10 blood samples from non-infected women as a control group. All blood samples were collected in the first three months of the pregnancy period for detection toxoplasmosis by using serological tests of test kit ( Toxo , IgG.,Toxo , IgM ). To detect antibodies specialized type of IgG &IgM in acute and the chronic infection by Electro Clia manner using a Roche Cobas e411. The results showed that the total infection rate was (55.83)%, the rate of infection in acu
... Show MoreABSTRACT:. The Lower Cretaceous Zubair formation is comprised of sandstones intercalated with shale sequences. The main challenges that were encountered while drilling into this formation included severe wellbore instability-related issues across the weaker formations overlaying the reservoir section (pay zone). These issues have a significant impact on well costs and timeline. In this paper, a comprehensive geomechanical study was carried out to understand the causes of the wellbore failure and to improve drilling design and drilling performance on further development wells in the field. Failure criteria known as Mogi-Coulomb was used to determine an operating mud weight window required for safe drilling. The accuracy of the geomechanical
... Show MoreThe Iraqi political and social arena has been characterized, subjectively and objectively, by the weakness of leadership building. This has led to a leadership crisis, which is reflected in the quality of the outcome of the process of rebuilding the state in Iraq. Thus, this building process has lacked the simplest requirements and conditions of success. It has suffered from a major and obvious failure: the situation in Iraq has raised conflict leaders, not constructive leaders, and this confirms the existence of a cultural crisis in the production of conscious, aware leadership compatible with democratic action. The weakness of leadership in Iraq is reflected in a series of ongoing crises that require radical solutions in accordance with l
... Show MorePrediction of the formation of pore and fracture pressure before constructing a drilling wells program are a crucial since it helps to prevent several drilling operations issues including lost circulation, kick, pipe sticking, blowout, and other issues. IP (Interactive Petrophysics) software is used to calculate and measure pore and fracture pressure. Eaton method, Matthews and Kelly, Modified Eaton, and Barker and Wood equations are used to calculate fracture pressure, whereas only Eaton method is used to measure pore pressure. These approaches are based on log data obtained from six wells, three from the north dome; BUCN-52, BUCN-51, BUCN-43 and the other from the south dome; BUCS-49, BUCS-48, BUCS-47. Along with the overburden pressur
... Show MorePrediction of the formation of pore and fracture pressure before constructing a drilling wells program are a crucial since it helps to prevent several drilling operations issues including lost circulation, kick, pipe sticking, blowout, and other issues. IP (Interactive Petrophysics) software is used to calculate and measure pore and fracture pressure. Eaton method, Matthews and Kelly, Modified Eaton, and Barker and Wood equations are used to calculate fracture pressure, whereas only Eaton method is used to measure pore pressure. These approaches are based on log data obtained from six wells, three from the north dome; BUCN-52, BUCN-51, BUCN-43 and the other from the south dome; BUCS-49, BUCS-48, BUCS-47. Along with the overburden pr
... Show MoreAbstract:
This research aims to identify the actual reality of the supply chain processes applied in the Noor Al-Kafeel Food Products Company, which was chosen as a research sample by measuring the application and documentation gap. The current research relies on the case study method to reach the desired results, and the seven-scale scale was relied on to identify the reality of the supply chain operations applied in the researched company and the use of quantitative and qualitative methods in data collection and analysis, as quantitative methods such as the arithmetic mean were used weighted, percentage measurement, and g
... Show More
his project try to explain the using ability of spatial techniques for land cover change detection on regional level with the time parameter and did select for explain these abilities study case (Hewaizah marsh ) . this area apply to many big changes with the time. These changes made action on characters and behaviors of this area as well as all activities in it . This Project concerting to recognize the Using importance of remote sensing and GIS Methodology in data collecting for the changes of land use and the methodology for the analyses and getting the results for the next using as a base data for development and drawing the plans as well as in regional planning .This project focus on practical
... Show MoreThe piled raft is a geotechnical composite construction consisting of three elements: piles, raft and soil.
In the design of piled rafts, the load shared between the piles and the raft, and the piles are used up to a
load level that can be of the same order of magnitude as the bearing capacity of a comparable single
pile or even greater. Therefore, the piled raft foundation allows reduction of settlements in a very
economic way as compared to traditional foundation concepts.
This paper presents experimental study to investigate the behavior of piled raft system in sandy
soil. A small scale “prototype” model was tested in a sand box with load applied to the system through
a compression machine. The settlement was