The need for Dewatering is very important in construction workshops field and sometimes it needs to pay more attention as a result of its impacts on causing additional settlement of nearby pile foundations. Dewatering construction may become a costly topic if ignored during project planning and designing .In this paper a simplified procedure maybe adopted to calculate the foundation settlement induced by using dewatering system which is required to lower the water table level to reach a dry condition during construction. Synthesized case study adopted at a specified location in Baghdad city and analysis are computed for two types of piles both of them are submerged with water. Results shows the effect of dewatering on pile foundation settlement, consolidation of soil around the pile shaft, soil-pile interaction and negative skin friction.
Gypseous soils are distributed in many regions in the world including Iraq, which cover more than (31%) of the surface area of the country. Existence of these soils, always with high gypsum content, caused difficult problems to the buildings and strategic projects due to dissolution and leaching of the gypsum caused by the action of water flow through soil mass. For the study, the gypseous soil was brought from Bahr Al-Najaf, Al-Najaf Governorate which is located in the middle of Iraq. The model pile was embedded in gypseous soil with 42% gypsum content. Compression axial model pile load tests have been carried out for model pile embedded in gypseous soil at initial degree of saturation of (7%) before and after soil satu
... Show MorePrediction of the formation of pore and fracture pressure before constructing a drilling wells program are a crucial since it helps to prevent several drilling operations issues including lost circulation, kick, pipe sticking, blowout, and other issues. IP (Interactive Petrophysics) software is used to calculate and measure pore and fracture pressure. Eaton method, Matthews and Kelly, Modified Eaton, and Barker and Wood equations are used to calculate fracture pressure, whereas only Eaton method is used to measure pore pressure. These approaches are based on log data obtained from six wells, three from the north dome; BUCN-52, BUCN-51, BUCN-43 and the other from the south dome; BUCS-49, BUCS-48, BUCS-47. Along with the overburden pr
... Show MorePrediction of the formation of pore and fracture pressure before constructing a drilling wells program are a crucial since it helps to prevent several drilling operations issues including lost circulation, kick, pipe sticking, blowout, and other issues. IP (Interactive Petrophysics) software is used to calculate and measure pore and fracture pressure. Eaton method, Matthews and Kelly, Modified Eaton, and Barker and Wood equations are used to calculate fracture pressure, whereas only Eaton method is used to measure pore pressure. These approaches are based on log data obtained from six wells, three from the north dome; BUCN-52, BUCN-51, BUCN-43 and the other from the south dome; BUCS-49, BUCS-48, BUCS-47. Along with the overburden pressur
... Show MoreAbstract:
This research aims to identify the actual reality of the supply chain processes applied in the Noor Al-Kafeel Food Products Company, which was chosen as a research sample by measuring the application and documentation gap. The current research relies on the case study method to reach the desired results, and the seven-scale scale was relied on to identify the reality of the supply chain operations applied in the researched company and the use of quantitative and qualitative methods in data collection and analysis, as quantitative methods such as the arithmetic mean were used weighted, percentage measurement, and g
... Show MoreThe piled raft is a geotechnical composite construction consisting of three elements: piles, raft and soil.
In the design of piled rafts, the load shared between the piles and the raft, and the piles are used up to a
load level that can be of the same order of magnitude as the bearing capacity of a comparable single
pile or even greater. Therefore, the piled raft foundation allows reduction of settlements in a very
economic way as compared to traditional foundation concepts.
This paper presents experimental study to investigate the behavior of piled raft system in sandy
soil. A small scale “prototype” model was tested in a sand box with load applied to the system through
a compression machine. The settlement was
Background: Breast cancer remains a substantial cause of morbidity and mortality, there is a need for continued efforts to understand the etiology of the disease, maintain screening effort, implement prevention strategies, and develop better treatments.Objective: To analyze the risk factors, improve early detection and prevention of breast cancer in Al-Russafa district- Baghdad, aiming to increase survival rate and improve the quality of life.Methods: A cross sectional audit of 258 breast cancer cases seen at Al-Elwiya maternity teaching hospital from January2009 to December 2011,data collected from patients files were: age, gender , residency, marital status, parity, age at menarche and menopause age at first live birth, hormonal therap
... Show MorePolish Academy of Sciences
In this study the rate of infection in acute and chronic Toxoplasma gondii parasite that causes toxoplasmosis was determined. This study was Included 120 blood samples that collected from pregnant women revisions to some clinics and laboratories in Baghdad civil as well as 10 blood samples from non-infected women as a control group. All blood samples were collected in the first three months of the pregnancy period for detection toxoplasmosis by using serological tests of test kit ( Toxo , IgG.,Toxo , IgM ). To detect antibodies specialized type of IgG &IgM in acute and the chronic infection by Electro Clia manner using a Roche Cobas e411. The results showed that the total infection rate was (55.83)%, the rate of infection in acu
... Show MoreOne of the main element in the network is the intersection which consider as the critical points because there are many conflict in this element. The capability and quality of operation of an intersection was assessed to provide a better understanding of the network's traffic efficiency. In Baghdad city, the capital of/Iraq the majority of the intersections are operated under the congestion status and with level of service F, therefore theses intersection are consider as high spot point of delay in the network of Baghdad city. In this study we selected Al-Ameria signalized intersection as a case study to represent the delay problem in the intersections in Baghdad. The intersection is located in the w
The research aims to improve operational performance through the application of the Holonic Manufacturing System (HMS) in the rubber products factory in Najaf. The problem was diagnosed with the weakness of the manufacturing system in the factory to meet customers' demands on time within the available resources of machines and workers, which led to time delays of Processing and delivery, increased costs, and reduced flexibility in the factory, A case study methodology used to identify the reality of the manufacturing system and the actual operational performance in the factory. The simulation was used to represent the proposed (HMS) by using (Excel 2010) based on the actual data and calculate the operational performance measures
... Show More