Exploitation of mature oil fields around the world has forced researchers to develop new ways to optimize reservoir performance from such reservoirs. To achieve that, drilling horizontal wells is an effective method. The effectiveness of this kind of wells is to increase oil withdrawal. The objective of this study is to optimize the location, design, and completion of a new horizontal well as an oil producer to improve oil recovery in a real field located in Iraq. “A” is an oil and gas condensate field located in the Northeast of Iraq. From field production history, it is realized the difficulty to control gas and water production in this kind of complex carbonate reservoir with vertical producer wells. In this study, a horizontal well design with multi-stage completion is studied and proposed to find optimal oil recovery in the southeast region of the selected field. A bulk oil well sector model is used to simulate the fluid flow of a single-porosity/single-permeability model. Then, a sensitivity analysis has been run to optimize; the well trajectory path, different scenarios on well oil and water production potential, and well completion design. The result of the well sector simulation indicates that the well trajectory with an Azimuth of 89 degrees and with a multi-stage completion design has better production performance under water production constraints. Optimum oil production rates of 1000 to 2000 STB/day, as delaying and controlling early gas and water production challenges is achieved.
Twenty four soil samples were collected from different sites in north sector of East Baghdad oil field, Iraq , and analyzed to assess the impact of urbanization and industrialization essential pollution. The soil samples were analyzed for heavy metals (As, Cd, Cr, Cu, Hg, Ni, Pb, and Zn) by using inductively coupled plasma–mass spectrometry (ICP-MS). Mean concentration of heavy metals in soil samples follows this pattern: Zn > Ni > Cr > Cu >Pb > As> Cd> Hg. The results show significant variations (lower and higher) in the concentrations of heavy metals compared with local and world studies, this variation is attributed to the natural anthropogenic sources. The pollution of studied soil was assessed using many soil
... Show MoreTo develop a petrol engine so that it works under the bi-engine pattern (producer gas-petrol) without any additional engine modifications, a single-point injection method inside the intake manifold is a simple and inexpensive method. Still, it leads to poor mixing performance between the air and producer gas. This deficiency can cause unsatisfactory engine performance and high exhaust emissions. In order to improve the mixing inside the intake manifold, nine separate cases were modelled to evaluate the impact of the position and angle orientation inside the intake manifold on the uniformity and spread of the mixture under AFR=2.07. A petrol engine (1.6 L), the maximum engine speed (8000 rpm), and bi-engine mode (petrol-producer ga
... Show MoreExploration activities of the oil and gas industry generate loads of formation water called produced water (PW) up to thousands of tons each day. Depending on the geographic area, formation depth, oil production techniques, and age of oil supply wells, PW from different oil fields contain different chemical compositions. Currently, PW is also known as industrial waste water containing heavy metals that are toxic to humans and the environment, requiring special processing so that they can be disposed of in the environment. To determine the heavy metals content in PW from the Al-Ahdab oil field (AOF), the Ministry of Science and Technology/Agricultural Research Department determined som
This paper aims to calculate the petrophysical properties in the Al-Ahdab field in the middle of Iraq within the Mauddud Formation. This study was based on the information available from well logs. The interactive petrophysical software IP (V4.5) was used to calculate the porosity, hydrocarbon saturation and shale volume, divide the formation into reservoir units and buffer units, and evaluate these units in each well. The Mauddud was divided into five units, two of them were considered good reservoirs having good petrophysical properties (high porosity, Low water saturation, and low shale volume). The other three are not reservoirs because of poor petrophysical properties.
This work deals with the production of light fuel cuts of (gasoline, kerosene and gas oil) by catalytic cracking treatment of secondary product mater (heavy vacuum gas oil) which was produced from the vacuum distillation unit in any petroleum refinery. The objective of this research was to study the effect of the catalyst -to- oil ratio parameter on catalytic cracking process of heavy vacuum gas oil feed at constant temperature (450 °C). The first step of this treatment was, catalytic cracking of this material by constructed batch reactor occupied with auxiliary control devices, at selective range of the catalyst –to- oil ratio parameter ( 2, 2.5, 3 and 3.5) respectively. The conversion of heavy vacuum gas
... Show MoreIn the recent decade, injection of nanoparticles (NPs) into underground formation as liquid nanodispersions has been suggested as a smart alternative for conventional methods in tertiary oil recovery projects from mature oil reservoirs. Such reservoirs, however, are strong candidates for carbon geo-sequestration (CGS) projects, and the presence of nanoparticles (NPs) after nanofluid-flooding can add more complexity to carbon geo-storage projects. Despite studies investigating CO2 injection and nanofluid-flooding for EOR projects, no information was reported about the potential synergistic effects of CO2 and NPs on enhanced oil recovery (EOR) and CGS concerning the interfacial tension (γ) of CO2-oil system. This study thus extensively inves
... Show MoreIn the field of construction project management, time and cost are the most important factors to be considered in planning every project, and their relationship is complex. The total cost for each project is the sum of the direct and indirect cost. Direct cost commonly represents labor, materials, equipment, etc.
Indirect cost generally represents overhead cost such as supervision, administration, consultants, and interests. Direct cost grows at an increasing rate as the project time is reduced from its original planned time. However, indirect cost continues for the life of the project and any reduction in project time means a reduction in indirect cost. Therefore, there is a trade-off between the time and cost for completing construc
Time series is an important statistical method adopted in the analysis of phenomena, practices, and events in all areas during specific time periods and predict future values contribute to give a rough estimate of the status of the study, so the study aimed to adopt the ARIMA models to forecast the volume of cargo handled and achieved in four ports (Umm Qasr Port, Khor Al Zubair Port, Abu Flus Port, and Maqal Port(, Monthly data on the volume of cargo handled for the years (2006-2018) were collected (156) observations. The study found that the most efficient model is ARIMA (1,1,1).
The volume of go
... Show MoreThis research aims to prepare exercises of varying resistances and muscular work exchange for 200m freestyle swimmers, in addition to these exercises’ effects on physical adequacy and the time needed to complete this distance. The experimental method is the basis for the design of the experimental group and the control group of a 100% intentionally chosen sample from a community of elite-youth swimmers of 200m freestyle swimming for the sport season of 2020-2021 at the Police Sports Club. The sample consists of 15 swimmers that were divided, randomly, into two groups; 7 of them in the experimental group while 8 were in the control group. Physical adequacy was calculated with the use of swimmers’ mechanical energy measurements
... Show More