Solving Tri-criteria: Total Completion Time, Total Earliness, and Maximum Tardiness Using Exact and Heuristic Methods on Single-Machine Scheduling Problems
...Show More Authors

Scopus Crossref
View Publication
Publication Date
Mon Jun 10 2024
Journal Name
Iraqi Journal For Computer Science And Mathematics
Solving tri-criteria: total completion time, total late work, and maximum earliness by using exact, and heuristic methods on single machine scheduling problem
...Show More Authors

The presented study investigated the scheduling regarding  jobs on a single machine. Each  job will be processed with no interruptions and becomes available for the processing at time 0. The aim is finding a processing order with regard to jobs, minimizing total completion time , total late work , and maximal tardiness  which is an NP-hard problem. In the theoretical part of the present work, the mathematical formula for the examined problem will be presented, and a sub-problem of the original problem of minimizing the multi-objective functions  is introduced. Also, then the importance regarding the dominance rule (DR) that could be applied to the problem to improve good solutions will be shown. While in the practical part, two

... Show More
View Publication
Scopus (6)
Crossref (3)
Scopus Crossref
Publication Date
Mon May 01 2023
Journal Name
Periodicals Of Engineering And Natural Sciences
Solving the multi-criteria: total completion time, total late work, and maximum earliness problem
...Show More Authors

Within this research, The problem of scheduling jobs on a single machine is the subject of study to minimize the multi-criteria and multi-objective functions. The first problem, minimizing the multi-criteria, which include Total Completion Time, Total Late Work, and Maximum Earliness Time (∑𝐶𝑗, ∑𝑉𝑗, 𝐸𝑚𝑎𝑥), and the second problem, minimizing the multi-objective functions ∑𝐶𝑗 + ∑𝑉𝑗 +𝐸𝑚𝑎𝑥 are the problems at hand in this paper. In this study, a mathematical model is created to address the research problems, and some rules provide efficient (optimal) solutions to these problems. It has also been proven that each optimal solution for ∑𝐶𝑗 + ∑𝑉𝑗 + 𝐸𝑚𝑎𝑥 is an effic

... Show More
View Publication
Scopus (7)
Crossref (1)
Scopus Crossref
Publication Date
Wed Jul 02 2025
Journal Name
Advances In Nonlinear Variational Inequalities
Suggesting Approximation and Exact Algorithms to Solve New Tri-Criteria Machine Scheduling Problems
...Show More Authors

This study presents the multi criteria single-machine model. The machine scheduling problem (MSP) for ntasks on a single machine involves minimizing a function of three criteria: total completion time (C_j),maximum earliest (E_max), and tardiness (〖ΣT〗_j), This is an NP-hard issue. Within this work's theoretical section, we present the mathematical formulation of The presented topic thenhighlights the usefulness of the dominance rule (DR), which may be used to develop effective solutions. Whilein the practical part, one of the important exact methods; The proposed MSP tricriteria are solved by applyingthe Branch and Bound (BAB) method, which finds a set of efficient solutions for 1//F(ΣC_j ,ΣT_j ,E_max) upto n=100 jobs. The BAB appro

... Show More
Publication Date
Thu Mar 01 2018
Journal Name
Case Studies In Thermal Engineering
The temperatures distributions of a single-disc clutches using heat partitioning and total heat generated approaches
...Show More Authors

View Publication
Scopus (40)
Crossref (37)
Scopus Clarivate Crossref
Publication Date
Tue Jun 30 2020
Journal Name
Journal Of Economics And Administrative Sciences
Using The Maximum Likelihood And Bayesian Methods To Estimate The Time-Rate Function Of Earthquake Phenomenon
...Show More Authors

In this research, we dealt with the study of the Non-Homogeneous Poisson process, which is one of the most important statistical issues that have a role in scientific development as it is related to accidents that occur in reality, which are modeled according to Poisson’s operations, because the occurrence of this accident is related to time, whether with the change of time or its stability. In our research, this clarifies the Non-Homogeneous hemispheric process and the use of one of these models of processes, which is an exponentiated - Weibull model that contains three parameters (α, β, σ) as a function to estimate the time rate of occurrence of earthquakes in Erbil Governorate, as the governorate is adjacent to two countr

... Show More
View Publication Preview PDF
Crossref
Publication Date
Wed Dec 23 2020
Journal Name
Iraqi Journal For Electrical And Electronic Engineering
Heuristic and Meta-Heuristic Optimization Models for Task Scheduling in Cloud-Fog Systems: A Review
...Show More Authors

Nowadays, cloud computing has attracted the attention of large companies due to its high potential, flexibility, and profitability in providing multi-sources of hardware and software to serve the connected users. Given the scale of modern data centers and the dynamic nature of their resource provisioning, we need effective scheduling techniques to manage these resources while satisfying both the cloud providers and cloud users goals. Task scheduling in cloud computing is considered as NP-hard problem which cannot be easily solved by classical optimization methods. Thus, both heuristic and meta-heuristic techniques have been utilized to provide optimal or near-optimal solutions within an acceptable time frame for such problems. In th

... Show More
View Publication
Crossref (12)
Crossref
Publication Date
Sun Jan 01 2023
Journal Name
Aip Conference Proceedings
Efficient computational methods for solving the nonlinear initial and boundary value problems
...Show More Authors

Scopus (2)
Crossref (1)
Scopus Crossref
Publication Date
Fri Apr 21 2023
Journal Name
Aip Conference Proceedings
Efficient computational methods for solving the nonlinear initial and boundary value problems
...Show More Authors

In this paper, three approximate methods namely the Bernoulli, the Bernstein, and the shifted Legendre polynomials operational matrices are presented to solve two important nonlinear ordinary differential equations that appeared in engineering and applied science. The Riccati and the Darcy-Brinkman-Forchheimer moment equations are solved and the approximate solutions are obtained. The methods are summarized by converting the nonlinear differential equations into a nonlinear system of algebraic equations that is solved using Mathematica®12. The efficiency of these methods was investigated by calculating the root mean square error (RMS) and the maximum error remainder (𝑀𝐸𝑅n) and it was found that the accuracy increases with increasi

... Show More
View Publication Preview PDF
Scopus (2)
Crossref (1)
Scopus Crossref
Publication Date
Sun Dec 08 2019
Journal Name
Periodicals Of Engineering And Natural Sciences (pen)
Estimating total dissolved solids and total suspended solids in Mosul dam lake in situ and using remote sensing technique
...Show More Authors

View Publication
Scopus (12)
Crossref (10)
Scopus Crossref
Publication Date
Sun Mar 01 2026
Journal Name
Journal Of Engineering
Bi-objective Machine Scheduling Using Enhanced Simulated Annealing and Bee Algorithm Approaches
...Show More Authors

Many industrial systems involve multiple criteria and objectives, and they are very complex problems in computational science, such as task scheduling. We propose bi-criteria and bi-objective scheduling problems, which are solved by two nature-inspired evolutionary algorithms, such as Simulated Annealing (SA) and Bee Algorithm (BA). This problem is characterized by scheduling a batch of tasks on multiple machines, and it is fundamental because the solution should focus on the simultaneous optimization of two conflicting objectives: the makespan minimization and the total tardiness minimization. This problem is NP-Hard, and therefore, two evolutionary methods were used to search for solutions intelligently in this huge, very complex