The purpose of this work is to study the classification and construction of (k,3)-arcs in the projective plane PG(2,7). We found that there are two (5,3)-arcs, four (6,3)-arcs, six (7,3)arcs, six (8,3)-arcs, seven (9,3)-arcs, six (10,3)-arcs and six (11,3)-arcs. All of these arcs are incomplete. The number of distinct (12,3)-arcs are six, two of them are complete. There are four distinct (13,3)-arcs, two of them are complete and one (14,3)-arc which is incomplete. There exists one complete (15,3)-arc.
The purpose of this work is to determine the points and planes of 3-dimensional projective space PG(3,2) over Galois field GF(q), q=2,3 and 5 by designing a computer program.
In this research, a group of gray texture images of the Brodatz database was studied by building the features database of the images using the gray level co-occurrence matrix (GLCM), where the distance between the pixels was one unit and for four angles (0, 45, 90, 135). The k-means classifier was used to classify the images into a group of classes, starting from two to eight classes, and for all angles used in the co-occurrence matrix. The distribution of the images on the classes was compared by comparing every two methods (projection of one class onto another where the distribution of images was uneven, with one category being the dominant one. The classification results were studied for all cases using the confusion matrix between ev
... Show MoreIn this research, a group of gray texture images of the Brodatz database was studied by building the features database of the images using the gray level co-occurrence matrix (GLCM), where the distance between the pixels was one unit and for four angles (0, 45, 90, 135). The k-means classifier was used to classify the images into a group of classes, starting from two to eight classes, and for all angles used in the co-occurrence matrix. The distribution of the images on the classes was compared by comparing every two methods (projection of one class onto another where the distribution of images was uneven, with one category being the dominant one. The classification results were studied for all cases using the confusion matrix between every
... Show MoreBackground: Bone is essentially a highly vascular, living, constantly changing mineralized connective tissue. It is remarkable for its hardness, resilience and regenerative capacity, as well as its characteristic growth mechanisms. This study aimed to: 1. To evaluate the effect of bone morphogenetic protein7 (BMP7) on bone healing in artificially created intrabony defect in rabbits upper diastema, histologically. 2. To study the immunohistochemical expression of TGF-β3 and IGF-1R as bone formation markers in experimental and control groups during bone healing. Material and method: Forty male rabbits, was used in this study, 8 rabbits for each healing interval (3 days, 1,2 ,4 and 6 weeks). In each rabbit two bone holes were created on th
... Show MoreTo evaluate the effects of the thermal analysis and temperature of the atmospheric heat on the optical system. it varying the thermal expansion (positive or Negative Values) of the material and then changes the characteri of the optical system properties such as radius of curvetur of the surfaces, size of the aperture stop ect.
This paper had calculated the accepted ratio of the temperature variable on the optical system during analyzing the effect of thermal analysis on the Radial Energy Distribution for +20C0 and +50C0 •
Projects suspensions are between the most insistent tasks confronted by the construction field accredited to the sector’s difficulty and its essential delay risk foundations’ interdependence. Machine learning provides a perfect group of techniques, which can attack those complex systems. The study aimed to recognize and progress a wellorganized predictive data tool to examine and learn from delay sources depend on preceding data of construction projects by using decision trees and naïve Bayesian classification algorithms. An intensive review of available data has been conducted to explore the real reasons and causes of construction project delays. The results show that the postpo