The purpose of this paper is to build a simulation model by using HEC-RAS software to simulate the reality of water movement in the main river of Basra City (South of Iraq) which is known as Siraji-Khoura River. The main objective of the simulation is to detect areas where the water cycle is interrupted in some stations of the river stream, as this river has become an outlet for the disposal of sewage, leading to pollution and causing weakness in some sections of the river & obstructing the water cycle that takes place between this river and Shatt al – Arab river. A field survey data of the river and its banks were adopted to derive the grades, longitudinal and cross sections of the river, these data included three-dimensional coordinates observed by precise GPS device. Depending on the river's derived sections and elevation of water, a one dimensional unsteady flow model was constructed by HEC-RAS software to simulate the behavior of water flow during the tide periods. The results of simulation illustrated the weak areas that cause obstruction in the water flow within the river stream. It also determines the solid waste accumulation areas and stations where bed level rises from the water levels, causing the water cycle to break down in some parts of the river. Thus, an integrated database for the rivers of the study area was obtained, in order to the correct design decisions that are in the interest of these rivers.
In this paper, The transfer function model in the time series was estimated using different methods, including parametric Represented by the method of the Conditional Likelihood Function, as well as the use of abilities nonparametric are in two methods local linear regression and cubic smoothing spline method, This research aims to compare those capabilities with the nonlinear transfer function model by using the style of simulation and the study of two models as output variable and one model as input variable in addition t
... Show MoreThis paper shews how to estimate the parameter of generalized exponential Rayleigh (GER) distribution by three estimation methods. The first one is maximum likelihood estimator method the second one is moment employing estimation method (MEM), the third one is rank set sampling estimator method (RSSEM)The simulation technique is used for all these estimation methods to find the parameters for generalized exponential Rayleigh distribution. Finally using the mean squares error criterion to compare between these estimation methods to find which of these methods are best to the others
Productivity estimating of ready mixed concrete batch plant is an essential tool for the successful completion of the construction process. It is defined as the output of the system per unit of time. Usually, the actual productivity values of construction equipment in the site are not consistent with the nominal ones. Therefore, it is necessary to make a comprehensive evaluation of the nominal productivity of equipment concerning the effected factors and then re-evaluate them according to the actual values.
In this paper, the forecasting system was employed is an Artificial Intelligence technique (AI). It is represented by Artificial Neural Network (ANN) to establish the predicted model to estimate wet ready mixe
... Show MoreInitially-produced isotopes during the course of the
Turkey Consider Tigris and Euphrates rivers as a national rivers, and not an a International rivers, so that . It insists on its absolute sovereignty on that resources. The block ( levee ) which Turkey established should not create International problems.
The All International agreements and laws in this sect warrant the rights of all the states that located in river stream to use it without any consider to the regional absolute right.
During the 1980s, Turkey construct water projects, started with GAP, project which is one of the greatest project in the world, in spite of the plane of construct of the keep an levee on the Euphrates was pre of that project. The
... Show MoreFor many years, the construction industry damages have been overlooked such as unreasonable consumption of resources in addition to producing a lot of construction waste but with global awareness growth towards the sustainable development issues, the sustainable construction practices have been adopted, taking into account the environment and human safety. The research aims to propose a management system for construction practices which could be adopted during constructing different types of sustainable buildings besides formulating flowcharts which clarify the required whole phases of sustainable buildings life cycle. The research includes two parts: theoretical part which generally ,handles the sustainability concepts at construction i
... Show MoreThe study was conducted to measure diatom species diversity in the lotic ecosystem across the Wasit Province for 12 months. The quantitative study of diatoms (phytoplankton) was investigated in the Tigris river. The density of algae was ranged from 60989 cell×103/l to 112780.82 cell×103/l in the five sites. These algae were belonging to 39 genera. The richness index values ranged from 1.53 at site 5 in January 2016 to 6.34 at site 1 and June2015. Shannon-Weiner diversity index (H´) was 2.33 in February 2016 and 3.72 in June 2015 both values at site 3, whereas Evenness index was 0.54 at site 5 in March2016 and 0.98 at site 1 in both August2015 and May2016. The lack of homogeneity of the appearance of species indicates the dominance of a
... Show MoreThis paper presents a computer simulation model of a thermally activated roof (TAR) to cool a room using cool water from a wet cooling tower. Modeling was achieved using a simplified 1-D resistance-capacitance thermal network (RC model) for an infinite slab. Heat transfer from the cooling pipe network was treated as 2-D heat flow. Only a limited number of nodes were required to obtain reliable results. The use of 6th order RC-thermal model produced a set of ordinary differential equations that were solved using MATLAB - R2012a. The computer program was written to cover all possible initial conditions, material properties, TAR system geometry and hourly solar radiation. The cool water supply was considered time
... Show More