The construction industry in Iraq suffers from many problems, perhaps the most important of which is the delay in time and the increase in costs. Therefore, it was necessary to try to adopt a new methodology that would help in overcoming these problems. It was suggested to combine building information modeling with the agile management approach because this technique and methodology is modern and helps in reducing time and cost and improving quality. This paper aims to know the status of using Building Information Modeling (BIM) and Agile Project management (APM) in Iraq and to shed light on the merging of this integration, explaining the benefits, difficulties, and workflow practices, finding the most influencing factors on the time, cost and quality of the project. For a comprehensive understanding, the literature was reviewed for each of BIM and Agile separately, and an initial field survey was conducted to diagnose the factors of greatest importance, and a second field survey was conducted to know the effect of the factors identified from the initial questionnaire on time, cost and quality. The results indicated the weak use of BIM in Iraq, where the non-use rate reached more than 60% and the rate may reach 75%. The agile methodology from the field survey sample is not used in this paper. The benefits that have been presented deserve to be overcome.
Building Information Modeling (BIM) is extensively used in the construction industry due to its benefits throughout the Project Life Cycle (PLC). BIM can simulate buildings throughout PLC, detect and resolve problems, and improve building visualization that contributes to the representation of actual project details in the construction stage. BIM contributes to project management promotion by detecting problems that lead to conflicts, cost overruns, and time delays. This work aims to implement an effective BIM for the Iraqi construction projects’ life cycle. The methodology used is a literature review to collect the most important factors contributing to the success of BIM implementation, interview the team of the Cent
... Show MoreThe purpose of this paper is to statistically classify and categorize Building Information Modelling (BIM)-Facility Management (FM) publications in order to extract useful information related to the adoption and use of BIM in FM.
This study employs a quantitative approach using science mapping techniques to examine BIM-FM publications using Web of Science (WOS) database for the period between 2000 and April 2018.
The findi
The research endeavors to harness the benefits stemming from the integration of constraint theory into construction project management, with the primary goal of mitigating project completion delays. Additionally, it employs fuzzy analysis to determine the relative significance of fundamental constraints within projects by assigning them appropriate weights. The research problem primarily revolves around two key issues. Firstly, the persistent utilization of outdated methodologies and a heavy reliance on workforce experience without embracing modern computerized technologies. Secondly, the recurring problem of project delivery delays. Construction projects typically encompass five fundamental constraint types: cost restrictions, tim
... Show MoreThe research problem is that the traditional methods of internal auditing are somewhat heavy with long and rigid procedures for the members of the audit process team, especially in light of the current developments that are reflected in the business environment and internal audit reports, so it is necessary to reconsider the traditional internal audit work method and assess the extent of its development by agile methods to reduce the time of the audit process on the activities and elements that add value and direct the effort and time to the activities and elements that add value to the work of the economic unit and the report of the internal auditor.
The research aims to study the possibility of applying agile internal auditing
... Show MoreThe cost management of cost indicators in housing projects, on the level of planning and design, is the most important quality indicators, for adoption of strategies of planning and design efficient in managing these indicators. So this research points out the need to highlight the most effective and influential cost indicators in housing projects, and to determine strategies in the management of these indicators in order to raise the efficiency of housing projects quality, to seemly the income level target group, taking into consideration the quality of housing standards, to achieve the basic requirements of housing. This paper highlights the importance of the cost management, the types of housing cost, the method
... Show MoreSoftware cost management is a significant feature of project management. As such, it needs to be employed in a project or line of work. Software cost management is integral to software development failures, which, in turn, cause software failure. Thus, it is imperative that software development professionals develop their cost management skills to deliver successful software projects. The aim of this study is to examine the impact of cost management success factors with project management factors and three agile methodologies – Extreme Programming (XP), Scrum and Kanban methodologies which are used in the Pakistani software industry. To determine the results, the researchers applied quantitative approach through an extensive survey on
... Show MoreThe importance of the construction sector and its Great role in the provision of services and infrastructure, reduce poverty, improve living conditions and improve the economic situation in the country, impose attention to the way in which the projects implemented for its improvement and to get successful projects. The objective of this research was to determine the criteria for success as well as critical success and failure factors that have a significant impact on project success. A selected 75 engineer (department managers, project managers and engineers) are asked to fill the questionnaire form, Sixty-seven valid questionnaire forms were analyzed statistically to get search results, which were as follows : Twe
... Show MoreThe research problem is that most of the construction projects exceed the planned value, due to the failure to implement the plans on time. The current study aims to monitor the implementation of the project and for each of the executed tasks of the table of quantities in order to detect deviations at the time they occur, evaluate the time and cost performance, and then identify the areas of waste and analyze the implementation of each task in order to diagnose the underlying problems and find possible and applicable solutions in the environment Iraqi. The research was applied in one of the companies specialized in the field of construction projects, and one of the most important conclusions reached is the possibility of applying
... Show More