Infrastructure projects take a long time, are complex, multidisciplinary, use different materials and products, and have high risk. These characteristics affect the process of supplying materials. The current paper studies the ability to improve the supply chain process and decrease its cost by identifying the factors that affect it. These factors are used as variables in the mathematical model, which is working under uncertain conditions when the consumption rate of materials is not constant. The information used in this model is obtained from Building Information Modeling (BIM) and Geographical Information System (GIS) techniques and the genetic algorithm is utilized to determine the optimal supplier and the quantities of supplies for different materials. The case study used in this research is a concrete bridge. The obtained results show that the cost can decrease by about 28.2% by changing the supplier and the quantity of supplies.
This study examines the causes of time delays and cost overruns in a selection of thirty post-disaster reconstruction projects in Iraq. Although delay factors have been studied in many countries and contexts, little data exists from countries under the conditions characterizing Iraq during the last 10-15 years. A case study approach was used, with thirty construction projects of different types and sizes selected from the Baghdad region. Project data was gathered from a survey which was used to build statistical relationships between time and cost delay ratios and delay factors in post disaster projects. The most important delay factors identified were contractor failure, redesigning of designs/plans and change orders, security is
... Show MoreIn Iraq, more than 1031 school projects have been halted due to disputes and claims resulting from financial, contractual, or other issues. This research aims to identify, prioritize, and allocate the most critical risk factors that threaten these projects’ success for the duration (2017-2022). Based on a multi-step methodology developed through systematic literature reviews, realistic case studies, and semi-structured interviews, 47 risk factors were identified. Based on 153 verified responses, the survey reveals that the top-ranked risk factors are corruption and bribery, delaying the payments of the financial dues to the contractors or sub-contractors, absence of risk management strategy, multiple change orders due
... Show MoreConstruction projects have a special nature and affect them many factors making them exposed to multiple risks as a result of the length of the implementation period and the multiplicity of stages, starting from the decision stage through implementation until the final delivery, which leads to increased uncertainty and the likelihood of risk.
The process of analysis and risk management is one of the effective and productive methods that are used in managing the construction projects for the purpose of increasing the chances of ending the project successfully in terms of cost, time and quality and at the lowest possible problems.
The research aims first to the effective planning for analysis and risk managemen
... Show MoreThat the building of the national economy depends on the extent of the possibility of transition from the rent economy seeking to increase GDP (GDP1), and the tendency to manage projects with external sources of funding, or allow projects with foreign capital is a necessity. The strategic challenges faced by the economy in countries that have experience in investment projects have faced several factors internal and external for a period of time and not a few and the pressures and difficulties and failures have affected in one way or another on the development work in that country. On this basis, the stakeholders have a role to pay attention to the issue of the feasibility of the pattern of foreign investment in the investment environment
... Show MoreThe importance of the construction sector and its Great role in the provision of services and infrastructure, reduce poverty, improve living conditions and improve the economic situation in the country, impose attention to the way in which the projects implemented for its improvement and to get successful projects. The objective of this research was to determine the criteria for success as well as critical success and failure factors that have a significant impact on project success. A selected 75 engineer (department managers, project managers and engineers) are asked to fill the questionnaire form, Sixty-seven valid questionnaire forms were analyzed statistically to get search results, which were as follows : Twe
... Show MoreThe research aims to identify the risks faced by projects and work on the administration, such as those risks by using professional Project Management System (Project Management Professional) by identifying those risks and their impact on the objectives of the project, if they occur and to provide appropriate responses to Ha.autam search application on the draft Law Faculty port by the General Mansour Construction Contracting company has been using a method personal interview with the heads of departments and project managers in the Al-Mansour and tools descriptive and quantitative analysis as was used (likelihood and impact of risk analysis, Ai_kaoa scheme Sbb- effect, analysis of probability and impact, risk matrix (probability
... Show MoreReconstruction project management in the cities of Mosul, Anbar, and Tikrit, in Iraq still faces major obstacles that impede the comprehensive performance of these projects. It is thus necessary to improve the arising challenge estimation in the implementation of reconstruction projects and evaluate their components: time, cost, quality, and scope. This study used the Analytical Hierarchy Process (AHP) to prioritize major and minor criteria in the influential causes of challenges and formulate a mathematical model to help decision-makers estimate them. Using the Super Decisions software, the final results indicated that changes in scope reached 40.8%, which is the greatest difficulty, followed by changes in cost at 27.6%, changes in
... Show MoreThe research is based on the basic idea that companies today are moving towards a new trend towards protecting the environment coupled with the increasing wareness of the pollution damage caused by these companies due to their operations and activities in the environment. The two main reasons that led the researchers to choose this subject is the need to adapt the companies themselves in response to successive developments, The great development was that companies moved from the sole economic responsibility of the business to social responsibility by emphasizing socially responsible profit. The problem of research is the knowledge of the availability of the dimensions of the green processing series in Kirkuk Cement Factory The re