The quality and cost of constructed buildings are heavily influenced by the performance of design/auditing consultants. Thus, selecting the right design consultant and design auditing consultants is of utmost importance and not an easy task for any construction client. so, the client should specify the efficiency criteria and assess the performance levels of the design and design auditing consultant firm. The study aims to identify the selection criteria of the design consultant in construction projects and also identify the selection criteria of the design auditing consultant for the construction projects by using the Delphi survey with applying the principal components analysis (PCA). The results of the present study showed that there are 13 key criteria for selecting the design consultant, where the criterion of “Efficiency and experience of the company/consultant in previous work” was of the highest importance. While there are Ten key criteria for selecting the design auditing consultant for the construction project, where the criterion of “Credibility and professional integrity (transparency, professional conduct, and ethics)” was of the highest importance in the decision-making process. Moreover, the results of applying PCA on the Delphi survey outcomes showed that all the resulting selection criteria are most valuable and suitable for the selection process in construction projects.
Machine scheduling problems (MSP) are considered as one of the most important classes of combinatorial optimization problems. In this paper, the problem of job scheduling on a single machine is studied to minimize the multiobjective and multiobjective objective function. This objective function is: total completion time, total lead time and maximum tardiness time, respectively, which are formulated as are formulated. In this study, a mathematical model is created to solve the research problem. This problem can be divided into several sub-problems and simple algorithms have been found to find the solutions to these sub-problems and compare them with efficient solutions. For this problem, some rules that provide efficient solutio
... Show MoreThis research include design and implementation of an Iraqi cities database using spatial data structure for storing data in two or more dimension called k-d tree .The proposed system should allow records to be inserted, deleted and searched by name or coordinate. All the programming of the proposed system written using Delphi ver. 7 and performed on personal computer (Intel core i3).
The study was conducted at research station A, department of field crops, college of agricultural engineering sciences, university of Baghdad during summer 2021 to evaluate the effect of boron and some growth regulators on some growth criteria and yield of soybean crop (cv. shimaa). The experiment was carried out according to split plots by using randomized complete block design with three replications. The main plots included three concentrations of boron (75, 150 and 225) mg.L-1, the sub-plots included three levels of growth regulators, spraying kinetin (100 mg. L-1), spraying ethrel (200 mg.L-1) and spraying kinetin (100 mg.L-1) + spraying ethrel (200 mg.L-1) as
... Show MoreThe aim of this work is to develop an axi-symmetric two dimensional model based on a coupled simplified computational fluid dynamics (CFD) and Lagrangian method to predict the air flow patterns and drying of particles. Then using this predictive tool to design more efficient spray dryers. The approach to this is to model what particles experience in the drying chamber with respect to air temperature and humidity. These histories can be obtained by combining the particles trajectories with the air temperature/humidity pattern in the spray dryer. Results are presented and discussed in terms of the air velocity, temperature, and humidity profiles within the chambers and compared for drying of a 42.5% solids solution in a spray chamber
... Show MoreIn this paper, we consider the problem of stochastic project network when some or all activities are interrupted. An approach has been built to schedule the critical activities, by constructing some expressions based on the project lateness costs due to the interruption activities. Two simple example are presented to validate our approach.
Key words: Project Management, Project scheduling, Stochastic activity duration, Stochastic PERT.
Introduction
Recently, Projects planning and optimal timing, under uncertainty are extremely critical for many organizations, see [19]. Having an effective mathematical model wi
... Show MoreThe instant global trend towards developing tight reservoir is great; however, development can be very challenging due to stress and geomechanical properties effect in horizontal well placement and hydraulic fracturing design. Many parameters are known to be important to determine the suitable layer for locating horizontal well such as petrophysical and geomechanical properties. In the present study, permeability sensitivity to stress is also considered in the best layer selection for well placement. The permeability sensitivity to the stress of the layers was investigated using measurements of 27 core sample at different confining stress values. 1-D mechanical earth model (MEM) was built and converted to a 3-D full-field geomechanical mode
... Show More