The quality and cost of constructed buildings are heavily influenced by the performance of design/auditing consultants. Thus, selecting the right design consultant and design auditing consultants is of utmost importance and not an easy task for any construction client. so, the client should specify the efficiency criteria and assess the performance levels of the design and design auditing consultant firm. The study aims to identify the selection criteria of the design consultant in construction projects and also identify the selection criteria of the design auditing consultant for the construction projects by using the Delphi survey with applying the principal components analysis (PCA). The results of the present study showed that there are 13 key criteria for selecting the design consultant, where the criterion of “Efficiency and experience of the company/consultant in previous work” was of the highest importance. While there are Ten key criteria for selecting the design auditing consultant for the construction project, where the criterion of “Credibility and professional integrity (transparency, professional conduct, and ethics)” was of the highest importance in the decision-making process. Moreover, the results of applying PCA on the Delphi survey outcomes showed that all the resulting selection criteria are most valuable and suitable for the selection process in construction projects.
Public-private partnership (PPP) has been used over the past 20-30 years by governments in developed countries to meet the public demand for infrastructural services. In Iraq, the PPP concept is comparatively new to the Government of Iraq (GoI), where the government has historically taken most of the responsibility for providing public services. There are few PPP projects in Iraq. However, the number is increasing. Recently the Iraqi market has experienced a number of attempts of PPP in different sectors, especially after the new investment law in 2006. The aim of this paper is to evaluate the investment environment in Iraq and to indicate the main factors affecting PPP in particular for infrastructure projects. Some literature review and
... Show MoreThe aim of this research is to test the relationship of influence and correlation between strategic performance and its five dimensions (financial dimension, after internal processes, after internal customer satisfaction, after learning and growth, environmental and social dimension), by adopting international indicators in agricultural projects To determine the extent of the differences between the research variable and its dimensions, and then try to come out with a number of recommendations that contribute to the evaluation of agricultural projects and their performance by diagnosing and treating deviations, and based on the importance of the research topic in agricultural institutions. Institutions of the Environment and Soci
... Show MoreTax is an important financial resource that the state depends on in all its economic, political, and social fields. Nevertheless, the role of the tax is highlighted in raising tax revenues and influencing economic variables, such as savings, consumption, investment, and employment. The tax was taken as an important tool to stimulate investment in industrial projects because of this activity's important role in raising the efficiency of economic development and reviving the national economy, as many industrial investment laws were enacted and the most important thing included was exempting industrial projects from all taxes and fees (5-10) years, and an exemption Profits from income tax for a period of 5 years starting from the year in which
... Show MoreThe Multiplicative Cyclic Group has been used to construct a New Digital Algebraic Generator System (NDAGS). This cryptosystem can be classified as a stream cipher cryptosystem. In this paper we will estimate the efficiency and security of the (NDAGS) by using the Basic Efficiency Criteria (BEC). A comparison has made between the some known generators and (NDAGS). The results of applying the BEC and the comparison results proof the high efficiency of the (NDAGS).
The study investigated the behaviour of asphalt concrete mixes for aggregate gradations, according to the Iraqi specification using the Bailey method designed by an Excel spreadsheet. In mixing aggregates with varying gradations (coarse and fine aggregate), The Bailey method is a systematic methodology that offers aggregate interlocking as the backbone of the framework and a controlled gradation to complete the blends. Six types of gradation are used according to the bailey method considered in this study. Two-course prepared Asphalt Concrete Wearing and Asphalt Concrete binder, the Nominal Maximum Aggregate Sizes (NMAS) of the mixtures are 19 and 12.5 mm, respectively. The total number of specimens was 240 for both layers (15 samp
... Show MoreThe graphic privacy feature is one of the most important specifications for the existence of any type of design achievements alike, which is one of the graphic products with its multiple data, and from here the current research investigates the graphic privacy of vector graphics design with all its technical descriptions and concepts associated with it and the possibility of achieving it to the best that it should be from Where its formal structure in children's publications, where the structural structure of the current research came from the first chapter, which contained the research problem, which came according to the following question: What is the graphic privacy in the design of vector graphics in children's publ
... Show MoreFeature selection algorithms play a big role in machine learning applications. There are several feature selection strategies based on metaheuristic algorithms. In this paper a feature selection strategy based on Modified Artificial Immune System (MAIS) has been proposed. The proposed algorithm exploits the advantages of Artificial Immune System AIS to increase the performance and randomization of features. The experimental results based on NSL-KDD dataset, have showed increasing in performance of accuracy compared with other feature selection algorithms (best first search, correlation and information gain).
In this paper, we consider the problem of stochastic project network when some or all activities are interrupted. An approach has been built to schedule the critical activities, by constructing some expressions based on the project lateness costs due to the interruption activities. Two simple example are presented to validate our approach.
Key words: Project Management, Project scheduling, Stochastic activity duration, Stochastic PERT.
Introduction
Recently, Projects planning and optimal timing, under uncertainty are extremely critical for many organizations, see [19]. Having an effective mathematical model wi
... Show More