In this paper, the dynamic behaviour of the stage-structure prey-predator fractional-order derivative system is considered and discussed. In this model, the Crowley–Martin functional response describes the interaction between mature preys with a predator. e existence, uniqueness, non-negativity, and the boundedness of solutions are proved. All possible equilibrium points of this system are investigated. e sucient conditions of local stability of equilibrium points for the considered system are determined. Finally, numerical simulation results are carried out to conrm the theoretical results.
In this work, the fractional damped Burger's equation (FDBE) formula = 0,
In this research, we studied the multiple linear regression models for two variables in the presence of the autocorrelation problem for the error term observations and when the error is distributed with general logistic distribution. The auto regression model is involved in the studying and analyzing of the relationship between the variables, and through this relationship, the forecasting is completed with the variables as values. A simulation technique is used for comparison methods depending on the mean square error criteria in where the estimation methods that were used are (Generalized Least Squares, M Robust, and Laplace), and for different sizes of samples (20, 40, 60, 80, 100, 120). The M robust method is demonstrated the best metho
... Show MoreIn this research, we studied the multiple linear regression models for two variables in the presence of the autocorrelation problem for the error term observations and when the error is distributed with general logistic distribution. The auto regression model is involved in the studying and analyzing of the relationship between the variables, and through this relationship, the forecasting is completed with the variables as values. A simulation technique is used for comparison methods depending
Background: There is a significant molecular response to imatinib given at standard doses in individuals with chronic myeloid leukemia (CML) whose ABCB1 polymorphisms are present. Objective: To investigate the impact of the polymorphism in the ABCB1 gene rs1128503 on the effectiveness of nilotinib or imatinib therapy. Methods: From May 2022 until the end of January 2023, the current study was carried out in a single research institution, the National Center of Hematology, Baghdad Teaching Hospital at Medical City, Iraq. 76 people with chronic phase myeloid leukemia (CML-CP), who had previously received a diagnosis using the European Leukemia Net (ELN) criteria, enrolled in the trial. The PCR product was delivered to Macrogen Corpora
... Show MoreThe problems of modeling the signal and dispersion properties of a second order recursive section in the integer parameter space are considered. The formulation and solution of the section synthesis problem by selective and dispersive criteria using the methods of integer nonlinear mathematical programming are given. The availability of obtaining both positive and negative frequency dispersion of a signal in a recursive section, as well as the possibility of minimizing dispersion distortions in the system, is shown.
The study aims to identify the third instar larvae of fly species (Order : Diptera) feeding on carcasses (Fishes and Rabbits). Two families (Calliphoridae and Sarcophagidae), were recorded with highest rate in Calliphoridae species. The following species had been registered in accordance with their prevalence respectively; Calliphora vicina Rob.-Desvoidy, Chrysomya albiceps (Wiedmann), Chrysomy megacephala (Fabricius), Sarcophaga sp. and Lucilia sericata (Meigen). The highest rate has been registered Calliphora vicina during February, November, December and January at rate 100%, the larvae of this fly have not been observed during July, August, September and October. The highest rate of Ch
... Show MoreScheduling considered being one of the most fundamental and essential bases of the project management. Several methods are used for project scheduling such as CPM, PERT and GERT. Since too many uncertainties are involved in methods for estimating the duration and cost of activities, these methods lack the capability of modeling practical projects. Although schedules can be developed for construction projects at early stage, there is always a possibility for unexpected material or technical shortages during construction stage. The objective of this research is to build a fuzzy mathematical model including time cost tradeoff and resource constraints analysis to be applied concurrently. The proposed model has been formulated using fuzzy the
... Show More