Soil water use and water storage vary by vegetative management practices, and these practices affect land productivity and hydrologic processes. This study investigated the effects of agroforestry buffers (AB), grass buffers (GB), and biofuel crops (BC), relative to row crops (RC) on soil water use for a claypan soil in northern Missouri, USA. The experiment located at the Greenley Memorial Research Center included RC, AB, GB, and BC established in 1991, 1997, 1997, and 2012, respectively. Soil water reflectometer sensors installed at 5‐, 10‐, 20‐, and 40‐cm depths monitored soil water from April to November in 2017 and 2018. Results showed significant differences in weekly volumetric water content (VWC) among treatments for all fou
... Show MoreStorage of rainwater within the root depth zone is one of the modern ways to increase plant production. Subsurface water retention technology was applied to assess improving values of crop yield and crop water use efficiency, applying a membrane made of low-density polyethylene trough installed below the crop root zone. The goal of this paper is to assess that the retention of rainwater above the membrane can improve the crop yield and crop water use efficiency values for winter wheat. The experiment was conducted in open field, within Joeybeh Township, located in east of the Ramadi City, in Anbar Province, in winter growing season 2018-2019. Two plots T1 (with membrane trough) and T2 (without membrane) were used for the
... Show MoreThe Backstepping Sliding Mode Control is a control technique used for controlling nonlinear systems. In this paper, the performance of the backstepping sliding mode controller schemes for the angular velocity control for a rotary actuator of an angular velocity control system that utilizes a novel hydraulic flow control method called inlet throttling was investigated. For the angular velocity dynamic, a linear state feedback with suitable high gain is designed as the virtual controller, where steady state error can be made arbitrarily small according to the gain value. A time varying sliding variable is then selected based on the designed virtual controller. The resulting control design is robust, and the maximum error of the angular veloci
... Show MoreThe researchers believe the problem of searching the scarcity or limited tests of time kinetic response led to scarcity or limited availability of experimental research in exercises codified within the training curriculum for the junior class, and therefore has been weakening this physical variable as an important episode in the development of the players physical capacities as well as the lack of measure for this variable within the defensive skills in general and the skill of the player movement defender in particular, and it represents the goal of research in the treatment of the above through the construction and rationing test to measure the kinetic response to the movement of the player defender basketball junior time. Chosen as the r
... Show MoreSustainable crop production in a coarse soil texture is challenging due to high water permeability and low soil water holding capacity. In this paper, subsurface water retention technology (SWRT) through impermeable polyethylene membranes was placed at depth 35 cm below ground surface and within the root zone to evaluate and compare the impact of these membranes and control treatment (without using the membranes) on yield and water use efficiency of eggplant inside the greenhouse. The study was conducted in Al-Fahamah Township, Baghdad, Iraq during spring growing season 2017. Results demonstrated the yield and water use efficiencies were 3.483 kg/m2 and 5.653 kg/m3, respectively for SWRT treatment p
... Show MoreCost estimation is considered one of the important tasks in the construction projects management. The precise estimation of the construction cost affect on the success and quality of a construction project. Elemental estimation is considered a very important stage to the project team because it represents one of the key project elements. It helps in formulating the basis to strategies and execution plans for construction and engineering. Elemental estimation, which in the early stage, estimates the construction costs depending on . minimum details of the project so that it gives an indication for the initial design stage of a project. This paper studies the factors that affect the elemental cost estimation as well as the rela
... Show MoreIn this research, the researchers attempted to reveal the non-verbal language in the Holy Qur'an through the hurt of the eye, its communicative effect, and its psychological significance in order to demonstrate the importance of this language. Fold the search ..