In this paper, we propose a method using continuous wavelets to study the multivariate fractional Brownian motion through the deviations of the transformed random process to find an efficient estimate of Hurst exponent using eigenvalue regression of the covariance matrix. The results of simulations experiments shown that the performance of the proposed estimator was efficient in bias but the variance get increase as signal change from short to long memory the MASE increase relatively. The estimation process was made by calculating the eigenvalues for the variance-covariance matrix of Meyer’s continuous wavelet details coefficients.
Benign prostatic hyperplasia (BPH) is one of the most common disease and major cause of morbidity in elderly men which may lead to bladder outflow obstruction and lower urinary tract symptoms (LUTS). Although sex steroid hormones play fundamental roles in prostate growth, their clinical significance is not completely clear. In the present study we assessed whether serum hormones levels as markers of prostate disease. This study includes (40) patients with benign prostatic hypertrophy and (40) control group with age rang (41-79) and (42-71) years respectively. The following biochemical investigations have been studied: Testosterone, Estradiol (E2), and Prostatic Specific Antigen (PSA) levels using ELISA method which correlated with t
... Show MoreIn this paper, a relationship between the liquid limit and the coefficient of consolidation of Iraqi soils are studied. The samples of soil used in study are undisturbed silty clay. These samples are taken from different locations and depths of Middle and South of Iraq by cooperation with Consulting Engineering Bureau- University of Baghdad- College of Engineering. The depth reached about 20 meters. The experimental work is made to calculate the liquid limit and the coefficient of consolidation. From these sites, 280 points are obtained. The relationship between the liquid limit and the coefficient of consolidation is drawn as a curve. This curve is studied and compared with the curve that obtained from other studies. From these curves, it
... Show MoreThe parameter and system reliability in stress-strength model are estimated in this paper when the system contains several parallel components that have strengths subjects to common stress in case when the stress and strengths follow Generalized Inverse Rayleigh distribution by using different Bayesian estimation methods. Monte Carlo simulation introduced to compare among the proposal methods based on the Mean squared Error criteria.
In this paper, the researcher suggested using the Genetic algorithm method to estimate the parameters of the Wiener degradation process, where it is based on the Wiener process in order to estimate the reliability of high-efficiency products, due to the difficulty of estimating the reliability of them using traditional techniques that depend only on the failure times of products. Monte Carlo simulation has been applied for the purpose of proving the efficiency of the proposed method in estimating parameters; it was compared with the method of the maximum likelihood estimation. The results were that the Genetic algorithm method is the best based on the AMSE comparison criterion, then the reliab
... Show MoreBackground: The evaluation of the chronological age is a practical method in crime investigation field that assists in identifying individuals to treat them as underage or adult. This study aimed to assess the stages of third molars mineralization in relation to chronological age of Iraqi individuals, determine the gender differences and arches (maxillary/mandibular) differences.
Materials and Methods: A total of 300 orthopantomograms of orthodontic patients were collected according to specific criteria and evaluated visually. The developmental stages of maxillary and mandibular third molars were determined according to Demirjian method. T
... Show MoreThis research will cover different aspects of estimating process of construction work in a desert area. The inherent difficulties which accompany the cost estimating of the construction works in desert environment in a developing country, will stem from the limited information available, resources scarcity, low level of skilled workers, the prevailing severe weather conditions and many others, which definitely don't provide a fair, reliable and accurate estimation. This study tries to present unit price to estimate the cost in preliminary phase of a project. Estimations are supported by developing mathematical equations based on the historical data of maintenance, new construction of managerial and school projects.
... Show More