Preferred Language
Articles
/
yBZIBYcBVTCNdQwCMS5H
Information model of plastic products formation process duration by injection molding method
...Show More Authors

Scopus
Preview PDF
Quick Preview PDF
Publication Date
Tue Oct 24 2023
Journal Name
Chemical Engineering & Technology
Electrodeposition of Manganese Dioxide under Different Conditions: Application of MnO<sub>2</sub>/Carbon Fibers in the Electrosorption Process
...Show More Authors
Abstract<p>Anodic electrodeposition was used to synthesize a composite electrode of nanostructured manganese dioxide/carbon fiber (CF) galvanostatically. Different characterization results of the nanostructured MnO<sub>2</sub> were obtained by varying the H<sub>2</sub>SO<sub>4</sub> concentration and the current density. Field emission scanning electron microscopy, X‐ray diffraction, and atomic force microscopy were utilized to characterize the prepared composite electrodes. The best conditions were: 0.3 mA cm<sup>−2</sup> current density and 0.64 M H<sub>2</sub>SO<sub>4</sub> concentration. The electrosorption performance of the MnO<sub></sub></p> ... Show More
View Publication
Scopus (3)
Crossref (4)
Scopus Clarivate Crossref
Publication Date
Sun Jan 08 2023
Journal Name
Journal Of Planner And Development
Statistical Evaluation of the Planning Process and Scheduling Management for Irrigation and Drainage Projects in the Republic of Iraq
...Show More Authors

The Research aims to investigate into reality in terms of planning and scheduling management process for sake the implementation and maintenance of irrigation and drainage projects in the Republic of Iraq, with an indication of the most important obstacles that impede the planning and scheduling management process for these projects and ways of addressing them and minimizing their effects.                                                  For the purpose of achieving the goal of the research, a sci

... Show More
View Publication Preview PDF
Publication Date
Wed Mar 30 2022
Journal Name
Iraqi Journal Of Chemical And Petroleum Engineering
Crystallization Process as a Final Part of Zero Liquid Discharge System for Treatment of East Baghdad Oilfield Produced Water
...Show More Authors

This study investigated the application of the crystallization process for oilfield produced water from the East Baghdad oilfield affiliated to the Midland Oil Company (Iraq). Zero liquid discharge system (ZLD) consists of several parts such as oil skimming, coagulation/flocculation, forward osmosis, and crystallization, the crystallization process is a final part of a zero liquid discharge system. The laboratory-scale simple evaporation system was used to evaluate the performance of the crystallization process. In this work, sodium chloride solution and East Baghdad oilfield produced water were used as a feed solution with a concentration of 177 and 220 g/l. The impact of temperature (70, 80, and 90 °C), mixing speed (300, 400, and 500 rp

... Show More
Preview PDF
Publication Date
Sun Jan 01 2023
Journal Name
International Journal Of Economics And Finance Studies
THE EFFECTS OF NEGATIVE AUDIT AND AUDIT ENVIRONMENT ON THE INTERNAL AUDITOR PERFORMANCE: MEDIATING ROLE OF AUDITING PROCESS INDEPENDENCE
...Show More Authors

Scopus (23)
Scopus
Publication Date
Sun Jan 01 2023
Journal Name
Aip Conference Proceedings
Optimization of Fenton process for removal of chemical oxygen demand (COD) from hospital wastewater using response surface methodology (RSM)
...Show More Authors

View Publication
Scopus (4)
Crossref (3)
Scopus Crossref
Publication Date
Thu Dec 01 2022
Journal Name
Journal Of Engineering
Evaluation of the Influence of De-sanding (Recycling System) Process on the Pile Bearing Capacity Using Full Scale Models
...Show More Authors

The present study investigates the effect of the de-sanding (recycling system) on the bearing capacity of the bored piles. Full-scale models were conducted on two groups of piles, the first group was implemented without using this system, and the second group was implemented using the recycling system. All piles were tested by static load test, considering the time factor for which the piles were implemented. The test results indicated a significant and clear difference in the bearing capacity of the piles when using this system. The use of the recycling system led to a significant increase in the bearing capacity of the piles by 50% or more. Thus it was possible to reduce the pile length by (15 % or more) thus, and implementation costs

... Show More
View Publication Preview PDF
Scopus (1)
Scopus Crossref
Publication Date
Wed Mar 29 2023
Journal Name
Iraqi Journal Of Chemical And Petroleum Engineering
Estimation Pore and Fracture Pressure Based on Log Data; Case Study: Mishrif Formation/Buzurgan Oilfield at Iraq
...Show More Authors

Prediction of the formation of pore and fracture pressure before constructing a drilling wells program are a crucial since it helps to prevent several drilling operations issues including lost circulation, kick, pipe sticking, blowout, and other issues. IP (Interactive Petrophysics) software is used to calculate and measure pore and fracture pressure. Eaton method, Matthews and Kelly, Modified Eaton, and Barker and Wood equations are used to calculate fracture pressure, whereas only Eaton method is used to measure pore pressure. These approaches are based on log data obtained from six wells, three from the north dome; BUCN-52, BUCN-51, BUCN-43 and the other from the south dome; BUCS-49, BUCS-48, BUCS-47. Along with the overburden pr

... Show More
Crossref (1)
Crossref
Publication Date
Thu Jun 05 2014
Journal Name
Arabian Journal Of Geosciences
Applying the cluster analysis technique in logfacies determination for Mishrif Formation, Amara oil field, South Eastern Iraq
...Show More Authors

View Publication
Scopus (11)
Crossref (8)
Scopus Clarivate Crossref
Publication Date
Tue Sep 07 2021
Journal Name
Journal Of Petroleum Exploration And Production Technology
Wellbore instability management using geomechanical modeling and wellbore stability analysis for Zubair shale formation in Southern Iraq
...Show More Authors
Abstract<p>Wellbore instability problems cause nonproductive time, especially during drilling operations in the shale formations. These problems include stuck pipe, caving, lost circulation, and the tight hole, requiring more time to treat and therefore additional costs. The extensive hole collapse problem is considered one of the main challenges experienced when drilling in the Zubair shale formation. In turn, it is caused by nonproductive time and increasing well drilling expenditure. In this study, geomechanical modeling was used to determine a suitable mud weight window to overpass these problems and improve drilling performance for well development. Three failure criteria, including Mohr–Coulomb, modifie</p> ... Show More
View Publication
Scopus (45)
Crossref (42)
Scopus Clarivate Crossref
Publication Date
Wed Mar 29 2023
Journal Name
Iraqi Journal Of Chemical And Petroleum Engineering
Estimation Pore and Fracture Pressure Based on Log Data; Case Study: Mishrif Formation/Buzurgan Oilfield at Iraq
...Show More Authors

Prediction of the formation of pore and fracture pressure before constructing a drilling wells program are a crucial since it helps to prevent several drilling operations issues including lost circulation, kick, pipe sticking, blowout, and other issues. IP (Interactive Petrophysics) software is used to calculate and measure pore and fracture pressure. Eaton method, Matthews and Kelly, Modified Eaton, and Barker and Wood equations are used to calculate fracture pressure, whereas only Eaton method is used to measure pore pressure. These approaches are based on log data obtained from six wells, three from the north dome; BUCN-52, BUCN-51, BUCN-43 and the other from the south dome; BUCS-49, BUCS-48, BUCS-47. Along with the overburden pressur

... Show More
View Publication Preview PDF
Crossref (1)
Crossref