The presented study investigated the scheduling regarding jobs on a single machine. Each job will be processed with no interruptions and becomes available for the processing at time 0. The aim is finding a processing order with regard to jobs, minimizing total completion time , total late work , and maximal tardiness which is an NP-hard problem. In the theoretical part of the present work, the mathematical formula for the examined problem will be presented, and a sub-problem of the original problem of minimizing the multi-objective functions is introduced. Also, then the importance regarding the dominance rule (DR) that could be applied to the problem to improve good solutions will be shown. While in the practical part, two exact methods are important; a Branch and Bound algorithm (BAB) and a complete enumeration (CEM) method are applied to solve the three proposed MSP criteria by finding a set of efficient solutions. The experimental results showed that CEM can solve problems for up to jobs. Two approaches of the BAB method were applied: the first approach was BAB without dominance rule (DR), and the BAB method used dominance rules to reduce the number of sequences that need to be considered. Also, this method can solve problems for up to , and the second approach BAB with dominance rule (DR), can solve problems for up to jobs in a reasonable time to find efficient solutions to this problem. In addition, to find good approximate solutions, two heuristic methods for solving the problem are proposed, the first heuristic method can solve up to jobs, while the second heuristic method can solve up to jobs. Practical experiments prove the good performance regarding the two suggested approaches for the original problem. While for a sub-problem the experimental results showed that CEM can solve problems for up to jobs, the BAB without dominance rule (DR) can solve problems for up to , and the second approach BAB with dominance rule (DR), can solve problems for up to jobs in a reasonable time to find efficient solutions to this problem. Finally, the heuristic method can solve up to jobs. Arithmetic results are calculated by coding (programming) algorithms using (MATLAB 2019a)
This work investigates a simulation model of an underwater optical wireless communication (UOWC) system. Several water scenarios are considered: Harbor I (HA-I), Harbor II (HA-II), Coastal Ocean (CO), Clear Ocean (CL), and Pure Sea (PU). A laser diode (LD) with modulation schemes (NRZ-OOK) transmits data at various speeds of 2.5 Gbps, 5 Gbps, and 10 Gbps. To identify the optical signal, a single-photon detection (SPD), APD and PIN photodiodes are utilized. The analytical evaluation of the performance is executed using Q-factor, received power and bit error rate (BER). According to the results, the PU achieved an underwater distance of 35.5 m, 35 m, 34.5 m, for data tran
In this article, we design an optimal neural network based on new LM training algorithm. The traditional algorithm of LM required high memory, storage and computational overhead because of it required the updated of Hessian approximations in each iteration. The suggested design implemented to converts the original problem into a minimization problem using feed forward type to solve non-linear 3D - PDEs. Also, optimal design is obtained by computing the parameters of learning with highly precise. Examples are provided to portray the efficiency and applicability of this technique. Comparisons with other designs are also conducted to demonstrate the accuracy of the proposed design.
The core interval at the K.H5\6 and K.H5\8 Wells in the West of Rutba provinces reveals a significant succession across the Late Cretaceous–Early Paleocene transition. The sampled interval encompasses a series of carbonates belonging to Digma Formation of Latest Cretaceous age, which underlies the Akashat Formtion of Danian age. Fifty-five species belonging to thirty-five genera were recognized. Based on the distribution of these species, eight biozones were distinguished, three biozones are recorded from the K.H 5\6 studied section and two biozones are documented from the K.H 5\8 studied section which refers to Late Maastrichtian age of Digma Formation. Five biozones are recorded from Akashat Formation in the K.H 5\6 studied section and
... Show MoreBackground: The disc prolapse is a common condition especially in young adults. Different levels are affected in the lumber region; the L4/L5 disc is more susceptible to longitudinal load and is the most common site of lumbar disc prolapse. The L5/S1 disc is protected from torsion load by strong ilio-lumbar ligaments but it is more susceptible to axial compressive forces. Many factors affect the result and outcome of surgery in these levels.Objective: The aim of this study is to correlate operative data, short-term results, complications, and prognostic factors (age, gender, mobility, hospital stay, and level of pain) for one-level lumber discectomybetween different levels (L4–L5 vs. L5–S1).Methods In this prospective study, 32 patie
... Show More