The presented study investigated the scheduling regarding jobs on a single machine. Each job will be processed with no interruptions and becomes available for the processing at time 0. The aim is finding a processing order with regard to jobs, minimizing total completion time , total late work , and maximal tardiness which is an NP-hard problem. In the theoretical part of the present work, the mathematical formula for the examined problem will be presented, and a sub-problem of the original problem of minimizing the multi-objective functions is introduced. Also, then the importance regarding the dominance rule (DR) that could be applied to the problem to improve good solutions will be shown. While in the practical part, two exact methods are important; a Branch and Bound algorithm (BAB) and a complete enumeration (CEM) method are applied to solve the three proposed MSP criteria by finding a set of efficient solutions. The experimental results showed that CEM can solve problems for up to jobs. Two approaches of the BAB method were applied: the first approach was BAB without dominance rule (DR), and the BAB method used dominance rules to reduce the number of sequences that need to be considered. Also, this method can solve problems for up to , and the second approach BAB with dominance rule (DR), can solve problems for up to jobs in a reasonable time to find efficient solutions to this problem. In addition, to find good approximate solutions, two heuristic methods for solving the problem are proposed, the first heuristic method can solve up to jobs, while the second heuristic method can solve up to jobs. Practical experiments prove the good performance regarding the two suggested approaches for the original problem. While for a sub-problem the experimental results showed that CEM can solve problems for up to jobs, the BAB without dominance rule (DR) can solve problems for up to , and the second approach BAB with dominance rule (DR), can solve problems for up to jobs in a reasonable time to find efficient solutions to this problem. Finally, the heuristic method can solve up to jobs. Arithmetic results are calculated by coding (programming) algorithms using (MATLAB 2019a)
Experiment was conducted in Baghdad, three factor were used in this research included Two types of Plows included moldboard and disk plows which represented the main plot, Three forward speeds of the tillage was the second factor included 1.85, 3.75 and 5.62 km / h which represented sup plot , and Three levels of Soil Moisture was third factor included 21, 18 and 14 % in all of Vertical and Lateral Plowing Deviation, Practical and specific productivity, actual time for plowing one donam and appearance (goodness) of Tillage represented by the number of clods > 10 cm in silt clay loam soil with depth 22 cm were studied. the experiment was used Split – split plot design under randomized complete block design with three replications and Le
... Show MoreThe study aimed to reveal the possibility of predicting academic procrastination through both Cognitive distortions and time management among students of Al-Aqsa Community College, as well as to reveal the level of both cognitive distortions, time management, and academic procrastination. Additionally, it aimed to identify the size of the correlation between cognitive distortions, time management, and academic procrastination. The study sample consisted of (250) students from Al-Aqsa community college students. The results of the study concluded that the mean for each level of cognitive distortions and academic procrastination is average. The mean level of time management is high. There is a statistically significant positive relationshi
... Show MoreIn order to understand the effect of the number of piles (N), the history response of dynamic pile load in piled raft system and deflection time history of piled raft under repeated impact load applied on the center of piled raft resting on loose sand, laboratory model tests were conducted on small-scale models. The results of experimental work are found to be dynamic load increase with increase height of drop, the measured repeated dynamic load time history on the center of piled raft was close approximately to three a half sine wave shape with small duration in about (0.015 Sec). The maximum peak of impact loads occurs in pile and deflection time history occur after at the time of the peak repeated impact loads, dynamic pile load
... Show MoreBackground: Diagnosis and treatment planning can be difficult with conventional radiographic methods as the orthodontic-surgical management of impacted canines requires accurate diagnosis and precise localization of the impacted canine and the surrounding structures. This study was aimed to localize and evaluate weather there is any differences in the diagnostic information provided by multi-slice computed tomography three dimensional volumetric CT images and two dimensional reconstructed panorama images (derived from CT) in subjects with impacted maxillary canines. Materials and Methods: Thirty patients including 24 female and 6 male with mean age of 18 years with suspected unilaterally or bilaterally impacted maxillary canines were evalu
... Show MoreWater level and distribution is very essential in almost all life aspects. Natural and artificial lakes represent a large percentage of these water bodies in Iraq. In this research the changes in water levels are observed by calculating the areas of five different lakes in five different regions and two different marshes in two different regions of the country, in a period of 12 years (2001 - 2012), archived remotely sensed images were used to determine surface areas around lakes and marshes in Iraq for the chosen years . Level of the lakes corresponding to satellite determined surface areas were retrieved from remotely sensed data .These data were collected to give explanations on lake level and surface area fluctuations. It is imp
... Show Moreتعد مراجعة النظير واحدة من الأســاليب الحديثة فــي مجال الرقابة والتدقيق ونشــأة كأداة لقياس مــدى فاعليــة الرقابــة علــى الجــودة هو لبنة أساسية في إدارة الجودة الشاملة ووسيلة لتحســين أدوات الرقابــة المعمول بها، وللتحقق من مدى الانسجام بين المعايير الدولية للأجهزة العليا للرقابة المالية والمحاسبة والاجراءات المعمول بها من قبل الاجهزة العليا للرقابة وعليه فأن مراجعة النظير أداة تستخدم ف
... Show MoreAeromonas hydrophila have been isolated as a cause of a cute gastroenteritis in 23 (5.6%) of 410 patients. Other bacterial enteropathogens have been isolated from 387 patients with diarrhea, were 19 different strains. A. hydrophila occurred more commonly in children with acute diarrhea, the results showed that 18(78.26%) isolates of A. hydrophila found in children under 10 years old ,distributed to 10(43.47%) in male and 8(34.78%) in female ,and in adults with diarrhea 5 (21.73%). In the other hand, we noticed frequency of isolation was higher in male 14(60.86%) when compared with 9(39.14%) in female. Six strains of A. hydrophila have been observed to have bacteriocin activity against 12 of 23 different A. hydrophila ,as well as Staphy
... Show MoreInferential methods of statistical distributions have reached a high level of interest in recent years. However, in real life, data can follow more than one distribution, and then mixture models must be fitted to such data. One of which is a finite mixture of Rayleigh distribution that is widely used in modelling lifetime data in many fields, such as medicine, agriculture and engineering. In this paper, we proposed a new Bayesian frameworks by assuming conjugate priors for the square of the component parameters. We used this prior distribution in the classical Bayesian, Metropolis-hasting (MH) and Gibbs sampler methods. The performance of these techniques were assessed by conducting data which was generated from two and three-component mixt
... Show More