Gypseous soil is considered as a problematic soil for embankment construction, however, implementation of emulsified asphalt as a stabilization agent could be a proper solution for enhancing its properties as a subgrade soil. In this work, the sustainability of asphalt stabilized soil has been assessed in terms of its resistance to cyclic (freezing-thawing) and (heating-cooling) processes. Specimens have been prepared at optimum fluid content (moisture and emulsion) and tested under direct shear stresses while subjected to 30 cycles of (freezing-thawing) and (heating-cooling). Both of dry and soaked testing conditions have been implemented. Data have been observed after each 10 cycles, and compared with that of reference mix. It was concluded that for dry test condition, samples exposed to (10, 20 and 30) cycles of (freezing-thawing) exhibits irregular variation in the Angle of internal friction, it increases after 10 cycles and then decreased. However, the cohesion decreased while increasing the number of cycles. For soaked test condition, Angle of internal friction remained constant and then increased after 20 cycles then decreased with further increments of (freezing-thawing) cycles, while cohesion decreased with the increased number of cycles. On the other hand, the results of the direct shear test for unsoaked test condition on samples exposed to (10, 20 and 30) cycles of (heating-cooling) exhibits that the angle of internal friction increases after 10 cycles, then decreased with further increase in (heating-cooling) cycles, while the Cohesion increases after 10 cycles then decrease with increased number of cycles for both soaked and unsoaked testing condition
The effects of the permeation cement grout with fly ash on the sandy soil skeleton were studied in the present work in two phase; first phase the shear strength parameters, and the second phase effect of these grouted materials on volume grouted zone by injection (51) cm³ of slurry in sandy soil placed in steel cylinder model with dimension 15 cm in diameter and 30 cm in height. The soil sample was obtained from Karbala city and it is classified as poorly graded sand (SP) according to USCS. The soil samples were improved by cement grout with three percentages weight of water cement ratio (w:c); (0.1w:0.9c, 0.8w:0.2c, and 0.7w:0.3c), while the soil samples were dehydrated for one day
... Show MoreA field trial was conducted in Experimental Station of The Field Crops Department – College Of Agriculture In Abu Ghraib, University of Baghdad to assess the effect of sulphur applications and the time after application on pH and EC of soil sample solutions ,and on the growth and yield of rape seed (Brassica napus L.)A split plot design was used with four replications , The main plot included four sulphur applications levels (0,2000,3000,4000Kg S/ha) the sub plot were the time after application (0,1,2,and 3 moths) .Sulphur application significantly decreased soil pH value ,although that decrease reached minimum parameter after two months from application date .Rather increment of sulphur application level significantly raised soil EC val
... Show Moreفي هذا البحث تم تحضير المركبات المعدنية النانوية الجديدة لأيونات البلاتين 4+و الذهب 3+ مع ليكاند قاعدة مانخ جديد مشتق من السيبروفلوكساسين بطريقة الموجات فوق الصوتية. تم تشخيص المعقدات النانوية والليكاند الجديد بأستخدام تقنيات فيزيائية و كيميائية مختلفة مثل أطياف الاشعة تحت الحمراء، حيود الاشعة السينية ، المجهر الالكتروني الماسح ، المجهر الالكتروني النافذ و مجهر القوة الذرية. تم تحديد نشاط مضادات الأك
... Show Moreتعد صناعة السمنت في العراق من اقدم الصناعات الحديثة واكثرها تطورا وتقدما ومن اقواها تاثيرا في الاقتصاد القومي. واذ توفر في صناعة السمنت العراقي كافة المستلزمات الناجحة من حيث توفر المواد الاولية والخبرات الفنية والتقنية واسواق ثابتة وراسخة محليا وعالميا فقد كان من المفروض ان يتم التوسع في هذه الصناعة، وان التخطيط لهذه الصناعة امرا ضروريا خاصة وان مادة السمنت هي احدى اهم المواد الرئيسة التي يؤثر توفره
... Show MoreThe research aims to shed light on the amount of proceeds annual tax for each of the way the contract total and percentage of completion method - see which is better - as well as the current problems arising from the application method of the contract in full in settling accounts tax - to identify problems - related to postpone settling accounts tax in accordance with the way the contract fully and determine the advantages and disadvantages of each of the methods through practical application , and then use the results as inputs to help in the decision to confirm the continuation of the GCT using a full decade in settling accounts tax for long-term construction contracts or forgo them.
Were the result of research the existence of
... Show MoreTotal quality management considers one of the modern scientific entrances which practiced by productivity service organizations alike to provide appropriate quality required outputs according to the needs and desires of customers manage , enable the organization seeking to continue and grow in light of the increasing competition from the satisfy and provide the appropriate total quality management requirements whenever led to face risks that they may have in a manner in which they can be addressed and find ways to avoid them in the future when repeated. &n
... Show MoreA low speed open circuit wind tunnel has been designed, manufactured and constructed at the
Mechanical Engineering Department at Baghdad University - College of Engineering. The work is one of
the pioneer projects adapted by the R & D Office at the Iraqi MOHESR. The present paper describes the
first part of the work; that is the design calculations, simulation and construction. It will be followed by a
second part that describes testing and calibration of the tunnel. The proposed wind tunnel has a test
section with cross sectional area of (0.7 x 0.7 m2) and length of (1.5 m). The maximum speed is about (70
m/s) with empty test section. The contraction ratio is (8.16). Three screens are used to minimize flow
distu
A low speed open circuit wind tunnel has been designed, manufactured and constructed at the Mechanical Engineering Department at Baghdad University - College of Engineering. The work is one of the pioneer projects adapted by the R & D Office at the Iraqi MOHESR. The present paper describes the first part of the work; that is the design calculations, simulation and construction. It will be followed by a second part that describes testing and calibration of the tunnel. The proposed wind tunnel has a test section with cross sectional area of (0.7 x 0.7 m2) and length of (1.5 m). The maximum speed is about (70 m/s) with empty test section. The contraction ratio is (8.16). Three screens are used to minimize flow disturbances in the test section.
... Show MoreThe project has been described the design and construction of a reliable optical testing platform used for evaluate the reflectivity of metal surfaces treated with special paintings required for laser beam attenuation. The platform comprises an Nd-YAG laser system which has been designed and fabricated with specifications to be compatible with their corresponding in laser range finder transmitters used for various applications. The reflectivity of various attenuating paintings, at different detection angles, has been observed. Moreover, the variation of the reflected energy with painting type and metal type to be painted has been studied experimentally. Results illustrated the existence of a definite angle, at which the reflectivity was max
... Show MoreThis study examines the causes of time delays and cost overruns in a selection of thirty post-disaster reconstruction projects in Iraq. Although delay factors have been studied in many countries and contexts, little data exists from countries under the conditions characterizing Iraq during the last 10-15 years. A case study approach was used, with thirty construction projects of different types and sizes selected from the Baghdad region. Project data was gathered from a survey which was used to build statistical relationships between time and cost delay ratios and delay factors in post disaster projects. The most important delay factors identified were contractor failure, redesigning of designs/plans and change orders, security is
... Show More