Corrosion Resistance Enhancement for low carbon steel is very important to extend its life service, the coating process is one of the methods which can using to achieve this, and it's the most important in surface treatments to improve the properties of metals and alloys surfaces such as corrosion resistance. In this work, low carbon steel was nitrided and coated with nano zinc using gas phase coating technical, to enhance the resistance of corrosion. The process included adding two layers. The first, a nitride layer, was added by precipitating nitrogen (N) gas, and the second, a zinc (Zn) layer, was added by precipitating Zn. The process of precipitating was carried out at different periods (5, 10, and 15 minutes). Scan electron microstructure (SEM), X-ray diffraction (XRD) and corrosion tests were carried out. The SEM and XRD results showed a new microstructure with the emergence of new phases (C3N4, Zn(N3)2, and γN). Also, the results of the corrosion test showed a significant improvement in corrosion resistance through a reduction in the corrosion rate (CR) and corrosion current density (icorr) which reached (1.598x10-3 mmpy) and (1.422x10-7 Amp/cm2) respectively, for coated samples, compared with 1.803×10-1 and 1.604x10-5, respectively, for the base metal. also found an appreciable increase in corrosion protection efficiency (CPE), which reached 99.11%.
In this research, the performance of asphalt mixtures modified with polyethylene polymer (PE) by adding 2%, 4%, and 6% percentages was evaluated. Two kinds of PE are employed: Low-Density PE (LDPE) and High-Density PE (HDPE). The semi-wet mixing technique (SWM) was conducted to avoid stability issue for PE-modified binder during storage condition. Many experimental tests were conducted to evaluate the ability of these mixtures to withstand the effects of loads and moisture. The hardness index of these mixtures was also measured to determine their resistance to the effects of high temperatures without causing permanent deformations. The results showed that adding PE led to a remarkable enhancement in the performance of PE-modified mixtures.
... Show MoreThe efficient behavior of a low-concentrating photovoltaic-thermal system with a micro-jet channel (LCPV/T-JET) and booster mirror reflector is experimentally evaluated here. Micro-jets promote the thermal management of PV solar cells by implementing jet water as active cooling, which is still in the early stages of development. The booster mirror reflector concentrates solar irradiance into solar cells and improves the thermal, electrical, and combined efficiencies of the LCPV/T-JET system. The LCPV/T-JET system was tested under ambient weather conditions in the city of Bangi, Selangor, Malaysia, and all data was recorded between 10:00 a.m. and 4:00 p.m. Parametric studies were conducted to compare the performance of the LCPV/T-JET system
... Show MoreIn the present work, a set of indoor Radon concentration measurements was carried out in a number of rooms and buildings of Science College in the University of Mustansiriyah for the first time in Iraq using RAD-7 detector which is an active method for short time measuring compared with the passive method in solid state nuclear track detectors (SSNTD's). The results show that, the Radon concentrations values vary from 9.85±1.7 Bq.m-3 to 94.21±34.7 Bq.m-3 with an average value 53.64±26 Bq.m-3 which is lower than the recommended action level 200-300 Bq/m3 [ICRP, 2009].
The values of the annual effective dose (A.E.D) vary from 0.25 mSv/y to 2.38 mSv/y, with an average value 1.46±0.67 mSv/y which is lower than the recommended the rang
This work deals with the production of light fuel cuts of (gasoline, kerosene and gas oil) by catalytic cracking treatment of secondary product mater (heavy vacuum gas oil) which was produced from the vacuum distillation unit in any petroleum refinery. The objective of this research was to study the effect of the catalyst -to- oil ratio parameter on catalytic cracking process of heavy vacuum gas oil feed at constant temperature (450 °C). The first step of this treatment was, catalytic cracking of this material by constructed batch reactor occupied with auxiliary control devices, at selective range of the catalyst –to- oil ratio parameter ( 2, 2.5, 3 and 3.5) respectively. The conversion of heavy vacuum gas
... Show MoreThe main role of infill drilling is either adding incremental reserves to the already existing one by intersecting newly undrained (virgin) regions or accelerating the production from currently depleted areas. Accelerating reserves from increasing drainage in tight formations can be beneficial considering the time value of money and the cost of additional wells. However, the maximum benefit can be realized when infill wells produce mostly incremental recoveries (recoveries from virgin formations). Therefore, the prediction of incremental and accelerated recovery is crucial in field development planning as it helps in the optimization of infill wells with the assurance of long-term economic sustainabi
In this research the activity of radon gas in air in Baghad governorate,Iraq, using “alpha-emitters track registration (CR-39) track detector were measured. This measurement was done for selected areas from Baghdad Governorate, The results obtained shows that the highest average concentrations for Rn-222 is (179.077 Bq/m^3) which was recorded within Al-Shaaib city and less average concentrations was (15.79 Bq/m^3) in the nearby residential area of Baghdad International Airport and the overall average concentrations is (86.508 Bq/m^3) for these regions. Then the radon concentration was measured annual effective dose calculated from radon concentration and found in range from 0.4031 mSv/y to 4.5179 mSv /y with an average value of 2.1824 m
... Show MoreGas lift is one of the most important artificial lift methods for increasing oil production, as wells often require this method after the reservoir's energy has decreased. In this research, an optimal gas lift system is designed for five horizontal wells in the Ahdab oil field, which suffers from low production. At the same time, water cut in some of these wells reaches 66%, while the productivity index is low in others, which makes the challenges clear, and a deep analysis is needed to find an optimal system. The Pipesim program is used to design the optimal gas lift system, which contains features that facilitate the implementation of the appropriate design and provide the ability to analyze and determine the optimal design v
... Show More