Preferred Language
Articles
/
uhfn544BVTCNdQwC6Fmh
Using the ordinal priority approach for selecting the contractor in construction projects
...Show More Authors
Abstract<p>Effective decision-making process is the basis for successfully solving any engineering problem. Many decisions taken in the construction projects differ in their nature due to the complex nature of the construction projects. One of the most crucial decisions that might result in numerous issues over the course of a construction project is the selection of the contractor. This study aims to use the ordinal priority approach (OPA) for the contractor selection process in the construction industry. The proposed model involves two computer programs; the first of these will be used to evaluate the decision-makers/experts in the construction projects, while the second will be used to formulate the OPA mathematical model. The experts’ interview was used to identify the criteria of evaluation process of the decision-makers/experts, while Delphi survey with principal component analysis (PCA) was conducted to identify the required selection criteria of the construction projects contractors. The results illustrate that there are 20 criteria for selecting the construction contractor, and 7 criteria for evaluating the decision-makers/experts in the construction projects. Finally, the proposed model has been applied in a real construction project, and showed good results.</p>
Scopus Clarivate Crossref
View Publication
Publication Date
Wed Dec 01 2021
Journal Name
Civil And Environmental Engineering
Prediction of the Delay in the Portfolio Construction Using Naïve Bayesian Classification Algorithms
...Show More Authors
Abstract<p>Projects suspensions are between the most insistent tasks confronted by the construction field accredited to the sector’s difficulty and its essential delay risk foundations’ interdependence. Machine learning provides a perfect group of techniques, which can attack those complex systems. The study aimed to recognize and progress a wellorganized predictive data tool to examine and learn from delay sources depend on preceding data of construction projects by using decision trees and naïve Bayesian classification algorithms. An intensive review of available data has been conducted to explore the real reasons and causes of construction project delays. The results show that the postpo</p> ... Show More
Scopus (6)
Crossref (5)
Scopus Clarivate Crossref
Publication Date
Thu Dec 01 2022
Journal Name
Iraqi Journal Of Statistical Sciences
Use the robust RFCH method with a polychoric correlation matrix in structural equation modeling When you are ordinal data
...Show More Authors

View Publication
Crossref
Publication Date
Wed Aug 01 2018
Journal Name
Journal Of Economics And Administrative Sciences
The Effect of Some Lean Production Tools in selecting a Mass Customization Strategy
...Show More Authors

   The research aims to indicate the relationship between lean production tools included seven {constant improvement , and Just in time (JIT), and the production smoothing , and quality at the source, and standardized work, Visual management, and activities 5S }  and  Mass Customization strategy for the model (Pine & Gilomer, 1997) {collaborative, adaptive, cosmetic, transparent}, as well as providing a conceptual framework and applied for variables search to clarify how they will choose a Mass Customization strategy through the lean production tools, , and recognize the reality of the practices of Iraqi industries in such a field. Moreover, aims to highlight the positive aspects that accrue to companies a

... Show More
View Publication Preview PDF
Crossref
Publication Date
Sat Sep 01 2012
Journal Name
2012 International Conference On Statistics In Science, Business And Engineering (icssbe)
A proposal method for selecting smoothing parameter with missing values
...Show More Authors

In this paper we proposed a new method for selecting a smoothing parameter in kernel estimator to estimate a nonparametric regression function in the presence of missing values. The proposed method is based on work on the golden ratio and Surah AL-E-Imran in the Qur'an. Simulation experiments were conducted to study a small sample behavior. The results proved the superiority the proposed on the competition method for selecting smoothing parameter.

View Publication
Scopus (1)
Scopus Crossref
Publication Date
Sun Nov 01 2009
Journal Name
Tencon 2009 - 2009 Ieee Region 10 Conference
Optimizing the MPLS support for real time IPv6-Flows using MPLS-PHS approach
...Show More Authors

View Publication
Scopus (4)
Scopus Crossref
Publication Date
Fri Jan 01 2010
Journal Name
2010 Second International Conference On Computer Research And Development
Per-Priority Flow Control (PPFC) for Enhancing Metro Ethernet QoS
...Show More Authors

View Publication
Scopus (2)
Crossref (2)
Scopus Crossref
Publication Date
Wed Aug 01 2018
Journal Name
Journal Of Economics And Administrative Sciences
The Economic Analysis for Construction in Ibn Khalduon s’ Muqaddimah
...Show More Authors

The specialist researcher  fined the relations between economic ideas with economic facts in his theory which called humanity building it is appeared clearly ( in Ibn Khalduons’ Muqaddimah) in a clothe of economic  social  phenomenon's as a systematical analysis in all fifty chapters of al Muqaddimah ,therefore this paper deal with  Ibn Khalduon economic thoughts as important says which describe the society building in its economic subjective  and  examine the relationship between The dissert and the city within economic says which are cover  the social analysis ,and determinate   the analysis objects  which clearly in this dualism  model ,between the state and economic bas

... Show More
View Publication Preview PDF
Crossref
Publication Date
Wed May 01 2019
Journal Name
Iop Conference Series: Materials Science And Engineering
Dynamic Preemption Algorithm to Assign Priority for Emergency Vehicle in Crossing Signalised Intersection
...Show More Authors
Abstract<p>Emergency vehicle (EV) services save lives around the world. The necessary fast response of EVs requires minimising travel time. Preempting traffic signals can enable EVs to reach the desired location quickly. Most of the current research tries to decrease EV delays but neglects the resulting negative impacts of the preemption on other vehicles in the side roads. This paper proposes a dynamic preemption algorithm to control the traffic signal by adjusting some cycles to balance between the two critical goals: minimal delay for EVs with no stop, and a small additional delay to the vehicles on the side roads. This method is applicable to preempt traffic lights for EVs through an Intelli</p> ... Show More
View Publication
Scopus (4)
Crossref (3)
Scopus Clarivate Crossref
Publication Date
Wed Jan 01 2020
Journal Name
International Journal Of Engineering Business Management
Using ANN in emergency reconstruction projects post disaster
...Show More Authors

The purpose of this study is to avoid delays and cost changes that occur in emergency reconstruction projects especially in post disaster circumstances. This study is aimed to identify the factors that affect the real construction period and the real cost of a project against the estimated period of construction and the estimated cost of the project. The case study is related to the construction projects in Iraq. Thirty projects in different areas of construction in Iraq were selected as a sample for this study. Project participants from the projects authorities provided data about the projects through a data collection distributed survey made by the authors. Mathematical data analysis was used to construct a model to predict change

... Show More
View Publication
Scopus (5)
Crossref (7)
Scopus Clarivate Crossref
Publication Date
Sun Jan 14 2018
Journal Name
Journal Of Engineering
Efficient Cost Management in the Housing Projects
...Show More Authors

The cost management of cost indicators in housing projects, on the level of planning and design, is the most important quality indicators, for adoption of strategies of planning and design efficient in managing these indicators. So this research points out the need to highlight the most effective and influential cost indicators in housing projects, and to determine strategies in the management of these indicators in order to raise the efficiency of housing projects quality, to seemly the income level target group, taking into consideration the quality of housing standards, to achieve the basic requirements of housing. This paper highlights the importance of the cost  management, the types of housing cost, the method

... Show More
View Publication Preview PDF