Using the ordinal priority approach for selecting the contractor in construction projects
Abstract<p>Effective decision-making process is the basis for successfully solving any engineering problem. Many decisions taken in the construction projects differ in their nature due to the complex nature of the construction projects. One of the most crucial decisions that might result in numerous issues over the course of a construction project is the selection of the contractor. This study aims to use the ordinal priority approach (OPA) for the contractor selection process in the construction industry. The proposed model involves two computer programs; the first of these will be used to evaluate the decision-makers/experts in the construction projects, while the second will be used to formulate the OPA mathematical model. The experts’ interview was used to identify the criteria of evaluation process of the decision-makers/experts, while Delphi survey with principal component analysis (PCA) was conducted to identify the required selection criteria of the construction projects contractors. The results illustrate that there are 20 criteria for selecting the construction contractor, and 7 criteria for evaluating the decision-makers/experts in the construction projects. Finally, the proposed model has been applied in a real construction project, and showed good results.</p>
Scopus Clarivate Crossref
View Publication
Publication Date
Fri Jul 01 2022
Journal Name
Journal Of Engineering
Use Risk Score Method to Identify the Qualitative Risk Analysis Criteria in Tendering Phase in Construction Projects

The purpose of this article was to identify and assess the importance of risk factors in the tendering phase of construction projects. The construction project cannot succeed without the identification and categorization of these risk elements. In this article, a questionnaire for likelihood and impact was designed and distributed to a panel of specialists to analyze risk factors. The risk matrix was also used to research, explore, and identify the risks that influence the tendering phase of construction projects. The probability and impact values assigned to risk are used to calculate the risk's score. A risk matrix is created by combining probability and impact criteria. To determine the main risk elements for the tender phase of

... Show More
Crossref (1)
Crossref
Preview PDF
Publication Date
Fri Jul 01 2022
Journal Name
Journal Of Engineering
Use Risk Score Method to Identify the Qualitative Risk Analysis Criteria in Tendering Phase in Construction Projects

The purpose of this article was to identify and assess the importance of risk factors in the tendering phase of construction projects. The construction project cannot succeed without the identification and categorization of these risk elements. In this article, a questionnaire for likelihood and impact was designed and distributed to a panel of specialists to analyze risk factors. The risk matrix was also used to research, explore, and identify the risks that influence the tendering phase of construction projects. The probability and impact values assigned to risk are used to calculate the risk's score. A risk matrix is created by combining probability and impact criteria. To determine the main risk elements for the tend

... Show More
Crossref (1)
Crossref
View Publication Preview PDF
Publication Date
Thu Oct 01 2020
Journal Name
Green Engineering
Scopus (1)
Scopus
Publication Date
Sat Jan 01 2022
Journal Name
Archives Of Civil Engineeringthis Link Is Disabled
Scopus (3)
Scopus
Publication Date
Sun May 17 2020
Journal Name
Iraqi Journal Of Science
Bayesian Adaptive Bridge Regression for Ordinal Models with an Application

In this article, we propose a Bayesian Adaptive bridge regression for ordinal model. We developed a new hierarchical model for ordinal regression in the Bayesian adaptive bridge. We consider a fully Bayesian approach that yields a new algorithm with tractable full conditional posteriors. All of the results in real data and simulation application indicate that our method is effective and performs very good compared to other methods. We can also observe that the estimator parameters in our proposed method, compared with other methods, are very close to the true parameter values.

Scopus Crossref
View Publication Preview PDF
Publication Date
Sat Jan 01 2022
Journal Name
Journal Of The Mechanical Behavior Of Materials
A spherical fuzzy AHP model for contractor assessment during project life cycle
Abstract<p>Measurement of construction performance is essential to a clear image of the present situation. This monitoring by the management team is necessary to identify locations where performance is exceptionally excellent or poor and to identify the primary reasons so that the lessons gained may be exported to the firm and its progress strengthened. This research attempts to construct an integrated mathematical model utilizing one of the recent methodologies for dealing with the fuzzy representation of experts’ knowledge and judgment considering hesitancy called spherical fuzzy analytic hierarchy process (SFAHP) method to assess the contractor’s performance per the project performance pa</p> ... Show More
Scopus (3)
Crossref (4)
Scopus Clarivate Crossref
View Publication
Publication Date
Sun Sep 01 2019
Journal Name
Al-khwarizmi Engineering Journal
Fuzzy Analytical Hierarchy Process for Embedded Risk Reduction in Selecting the Right Planning Decision

The aim of this work is to provide an efficient selection technique as a part of planning process to guide the decision makers to decide the preferences of one supplier over another for purchasing lab instruments in education domain. Fuzzy Analytical Hierarchy Process has used as a multi-criteria decision process, as an industrial engineering tool with certain emphasis on the qualitative aspects required to the decision makers. While the concept of degree of possibility for each criterion is used to reach its relative weights, a specific methodology created to reach the final objective decision of supplier selection. A questionnaire form was developed and distributed to five universities located in Baghdad province with a total

... Show More
View Publication Preview PDF
Publication Date
Tue Apr 01 2003
Journal Name
Abhath Al- Yarmouk [basic Sciences And Engineering]
Publication Date
Wed Jul 01 2020
Journal Name
Journal Of Engineering
Examining sensitivity of financial performance at construction projects prequalification stage

Construction projects are complicated in nature and require many considerations in contractor selection. One of the complicated interactions is that between performance with the project size, and contractor financial status, and size of projects contracted. At the prequalification stage, the financial ‎requirements restrict the ‎contractors to meet minimum limits in financial criteria such as net worth, working capital and ‎annual turnover, etc. In construction projects, however, there are cases when contractors meet these requirements but show low performance in practice. The model used in the study predicts the performance by training of a neural network. The data used in the study are 72 of the most recent roadw

... Show More
Crossref
View Publication Preview PDF
Publication Date
Thu Feb 01 2024
Journal Name
Journal Of Engineering
Evaluating the Knowledge for Integrating RM and VM Using BIM in the Iraqi Construction Sector

The construction industry plays a crucial role in the countries' economy, especially in the developed country. This point encourages the concerned institution to use new techniques and integrate many techniques and methods to maximize the benefits. The main objective of this research is to evaluate the use of risk management, value management, and building information modeling in the Iraqi construction industry. The evaluation process aims at two objectives. The direct objective was to evaluate the knowledge in risk management (RM), value management (VM), and building information modeling (BIM). The indirect objective was to support the participants with information related to the main items mentioned. The questionnaire

... Show More
Crossref (1)