Preferred Language
Articles
/
uhfn544BVTCNdQwC6Fmh
Using the ordinal priority approach for selecting the contractor in construction projects
...Show More Authors
Abstract<p>Effective decision-making process is the basis for successfully solving any engineering problem. Many decisions taken in the construction projects differ in their nature due to the complex nature of the construction projects. One of the most crucial decisions that might result in numerous issues over the course of a construction project is the selection of the contractor. This study aims to use the ordinal priority approach (OPA) for the contractor selection process in the construction industry. The proposed model involves two computer programs; the first of these will be used to evaluate the decision-makers/experts in the construction projects, while the second will be used to formulate the OPA mathematical model. The experts’ interview was used to identify the criteria of evaluation process of the decision-makers/experts, while Delphi survey with principal component analysis (PCA) was conducted to identify the required selection criteria of the construction projects contractors. The results illustrate that there are 20 criteria for selecting the construction contractor, and 7 criteria for evaluating the decision-makers/experts in the construction projects. Finally, the proposed model has been applied in a real construction project, and showed good results.</p>
Scopus Clarivate Crossref
View Publication
Publication Date
Mon Aug 01 2016
Journal Name
Journal Of Engineering
Performance Evaluation of the Investment Projects during the Implementation Phase (Najaf province as a case study)
...Show More Authors

The construction project is a very complicated work by its nature and requires specialized knowledge to lead it to success. The construction project is complicated socially, technically and economically in its planning, management and implementation aspects due to the fact that it has many variables and multiple stakeholders in addition to being affected by the surrounding environment. Successful projects depend on three fundamental points which are cost-time, performance and specifications. The project stakeholder's objective to achieve best specifications and the cost-time frame stipulated in the contract.

The question is, was the optimum implementation accomplished? The provision for the success of the project

... Show More
View Publication Preview PDF
Publication Date
Wed Mar 10 2021
Journal Name
Baghdad Science Journal
A new approach for the topical treatment of acne vulgaris by clindamycin HCL supported on kalion
...Show More Authors

Has been studied both processes Almetzaz and extortion of a substance Alklanda Maysan different amounts of Alcaúlan Guy 70% alcohol solution using the method when the wavelength

View Publication Preview PDF
Publication Date
Mon May 27 2024
Journal Name
Eureka: Physics And Engineering
Systematic development of an autonomous robotic car for fire-fighting based on the interactive design approach
...Show More Authors

Fire incidences are classed as catastrophic events, which mean that persons may experience mental distress and trauma. The development of a robotic vehicle specifically designed for fire extinguishing purposes has significant implications, as it not only addresses the issue of fire but also aims to safeguard human lives and minimize the extent of damage caused by indoor fire occurrences. The primary goal of the AFRC is to undergo a metamorphosis, allowing it to operate autonomously as a specialized support vehicle designed exclusively for the task of identifying and extinguishing fires. Researchers have undertaken the tasks of constructing an autonomous vehicle with robotic capabilities, devising a universal algorithm to be employed

... Show More
View Publication
Scopus (1)
Crossref (1)
Scopus Crossref
Publication Date
Thu Jul 01 2021
Journal Name
University Of Northampton Pue
Validating a Proposed Data Mining Approach (SLDM) for Motion Wearable Sensors to Detect the Early Signs of Lameness in Sheep
...Show More Authors

View Publication
Publication Date
Tue Oct 14 2025
Journal Name
Al–bahith Al–a'alami
The Semiology of Narrative Construction in Television Advertising to an Announce "God Will not Forget us" about the Covid-19 Pandemic for Zain Mobile Telecommunication Company
...Show More Authors

This research paper tries to show the significance of the narrative structure in the television advertisement and its connotations. The researchers chose the annual advertisement of Zain Mobile Telecommunication Company for the year 2020, which shed light on the global Corona pandemic crisis. The idea of the advertisement won wide approval as it focused on the suffering that everyone is witnessing like medical and security personnel in particular, and family relationships consequences.
In addition to the positive global interaction with the message presented by the Company in these exceptional circumstances. The advertisement, which lasted for 2.35 minutes, exceeded 13 million views in a short period of time. This prompted us to choos

... Show More
View Publication Preview PDF
Crossref
Publication Date
Mon Feb 04 2019
Journal Name
Journal Of The College Of Education For Women
The eloquence of the poetic image in the poetry of the Andalusian son of Labanism is a stylistic approach
...Show More Authors

The resort to the eloquence of the poetic image as a style reveals the poet's creativity and creativity in dealing with external influences, and reflect them with emotional images express a sense of intense emotional imagination, and this imagination stems from the experience of a poetic sense of truth, tasted by the recipient before the creator of the poetic text.

View Publication Preview PDF
Publication Date
Thu Feb 01 2024
Journal Name
Journal Of Engineering
Improving Building Information Modeling (BIM) Implementation throughout the Construction Industry
...Show More Authors

Building Information Modeling (BIM) is extensively used in the construction industry due to its benefits throughout the Project Life Cycle (PLC). BIM can simulate buildings throughout PLC, detect and resolve problems, and improve building visualization that contributes to the representation of actual project details in the construction stage. BIM contributes to project management promotion by detecting problems that lead to conflicts, cost overruns, and time delays. This work aims to implement an effective BIM for the Iraqi construction projects’ life cycle. The methodology used is a literature review to collect the most important factors contributing to the success of BIM implementation, interview the team of the Cent

... Show More
View Publication Preview PDF
Crossref (2)
Crossref
Publication Date
Mon Mar 07 2022
Journal Name
Construction Research Congress 2022
Annual Revenue’s Influence on the Safety Performance of Construction Firms
...Show More Authors

View Publication
Scopus (1)
Crossref (1)
Scopus Crossref
Publication Date
Sun Jan 01 2023
Journal Name
International Journal Of Economics And Finance Studies
THE ROLE OF TARGET COST MANAGEMENT APPROACH IN REDUCING COSTS FOR THE ACHIEVEMENT OF COMPETITIVE ADVANTAGE AS A MEDIATOR: AN APPLIED STUDY OF THE IRAQI ELECTRICAL INDUSTRY
...Show More Authors

Scopus (19)
Scopus
Publication Date
Sun Jan 01 2023
Journal Name
Journal Of Engineering
Artificial Neural Network Models to Predict the Cost and Time of Wastewater Projects
...Show More Authors

Infrastructure, especially wastewater projects, plays an important role in the life of residential communities. Due to the increasing population growth, there is also a significant increase in residential and commercial facilities. This research aims to develop two models for predicting the cost and time of wastewater projects according to independent variables affecting them. These variables have been determined through a questionnaire distributed to 20 projects under construction in Al-Kut City/ Wasit Governorate/Iraq. The researcher used artificial neural network technology to develop the models. The results showed that the coefficient of correlation R between actual and predicted values were 99.4% and 99 %, MAPE was

... Show More
View Publication Preview PDF
Crossref (3)
Crossref