This contribution provides an atomistic understanding into the impact of W, Nb, and Mo co-substitution at Hf-site of cubic HfO2 lattice to produce Hf1−xTMxO2 system at x = 25%. The calculations have been performed under the framework of density functional theory supported by Habbured parameter (DFT+U). Structural analysis demonstrates that the recorded lattice constants is in good coherence with the previously published results. For the lattice parameters, contraction by 1.33% comparing with the host system has been reported. Furthermore, the doping effect of TM on the band gap leads to its reduction in the resulting Hf0.75TM0.25O2 configurations. The partial density of states (PDOS) indicate that hybridization through localized electronic energy states from TM-5 and 6 d orbitals and O-2 p orbital have participated in narrowing the band gap. Population analysis displays that Hf0.75TM0.25O2 compounds revealed ionic and covalent behavior for Hf-O and TM-O bonds, respectively. The optical investigation portrays that Hf0.75TM0.25O2 systems would absorb a broad range of ultra violet (UV) electromagnetic waves which hence consider them as suitable candidates in optoelectronic memristors industries. Optical analysis also revealed a rise in the optical conductivity and absorption in higher photon energy extent. These compounds are suitable for photovoltaic and other optoelectronic applications. The zero values of the optical conductivity for the simulated systems in a broad range of electromagnetic waves confirm the impossibility of the electronic charge transfer to be occurred through the systems and hence preventing the leakage current which is not preferred in optoelectronic devices such as metal oxide semiconductor field effect transistors (MOSFETs).
The research endeavors to harness the benefits stemming from the integration of constraint theory into construction project management, with the primary goal of mitigating project completion delays. Additionally, it employs fuzzy analysis to determine the relative significance of fundamental constraints within projects by assigning them appropriate weights. The research problem primarily revolves around two key issues. Firstly, the persistent utilization of outdated methodologies and a heavy reliance on workforce experience without embracing modern computerized technologies. Secondly, the recurring problem of project delivery delays. Construction projects typically encompass five fundamental constraint types: cost restrictions, tim
... Show MorePrediction of the formation of pore and fracture pressure before constructing a drilling wells program are a crucial since it helps to prevent several drilling operations issues including lost circulation, kick, pipe sticking, blowout, and other issues. IP (Interactive Petrophysics) software is used to calculate and measure pore and fracture pressure. Eaton method, Matthews and Kelly, Modified Eaton, and Barker and Wood equations are used to calculate fracture pressure, whereas only Eaton method is used to measure pore pressure. These approaches are based on log data obtained from six wells, three from the north dome; BUCN-52, BUCN-51, BUCN-43 and the other from the south dome; BUCS-49, BUCS-48, BUCS-47. Along with the overburden pressur
... Show MoreRecently on the dermatological fields, the serum levels and the roles of Zn, Cu and Mg have been studied especially in acne vulgaris, but the results were controversial. The aim of the present study is to investigate a relationship between the severity of acne and the serum levels of zinc (Zn), copper (Cu) and magnesium (Mg) and to demonstrate the status of serum levels of zinc, copper, and magnesium in Iraqi male patients with acne vulgaris and to compare it with those of healthy controls.This case controlled study was conducted in the Department of Dermatology and Venerology and in the Poisoning Consultation Center of Baghdad Teaching Hospital between May 2009 to January 2010. Forty- five male patients with acne vulgaris, their a
... Show MorePrediction of the formation of pore and fracture pressure before constructing a drilling wells program are a crucial since it helps to prevent several drilling operations issues including lost circulation, kick, pipe sticking, blowout, and other issues. IP (Interactive Petrophysics) software is used to calculate and measure pore and fracture pressure. Eaton method, Matthews and Kelly, Modified Eaton, and Barker and Wood equations are used to calculate fracture pressure, whereas only Eaton method is used to measure pore pressure. These approaches are based on log data obtained from six wells, three from the north dome; BUCN-52, BUCN-51, BUCN-43 and the other from the south dome; BUCS-49, BUCS-48, BUCS-47. Along with the overburden pr
... Show MoreIn the present work effect of recycled heating and cooling on the values of concrete compressive strength due to high temperature of 4000C was studied.
The tests show that the percent of reduction in compressive strength of the samples which exposed to a temperature of 4000C for one cycle was 32.5%, while the reduction was 52.7% for the samples which were exposed to recycled heating and cooling of ten times .
Moreover a study of the effect of specimen sizes on the percentages of compressive strength reduction due to high temperature
... Show More