Suitability of Iraqi legal system for building operation transfer contract in infrastructure construction projects
...Show More Authors

Scopus Crossref
View Publication
Publication Date
Thu Jun 01 2017
Journal Name
Journal Of The College Of Languages (jcl)
Plain Language Movement and Legal Translation : An Analytical Study of Two Translations of a Contract of Lease from Arabic into English
...Show More Authors

The present paper addresses one of the most challenging topics in translation; namely legal translation in the framework of two different approaches; the classical (formal) and the more recent (functional). The latter approach is the outcome of the process of simplifying legal language known technically as Plain Language Movement. The advent of this movement dates back to the 1950s, in response to the widely-held complain about the awkwardness of the legal register. Within this framework, the salient features of legal language, at the various linguistic and textual levels, underwent reconsideration in favor of more publicly digested expressions. The paper then subjects two translations of a lease contract to analysis in the ligh

... Show More
View Publication Preview PDF
Publication Date
Wed Dec 01 2021
Journal Name
Civil And Environmental Engineering
Developing A Mathematical Model for Planning Repetitive Construction Projects By Using Support Vector Machine Technique
...Show More Authors
Abstract<p>Each project management system aims to complete the project within its identified objectives: budget, time, and quality. It is achieving the project within the defined deadline that required careful scheduling, that be attained early. Due to the nature of unique repetitive construction projects, time contingency and project uncertainty are necessary for accurate scheduling. It should be integrated and flexible to accommodate the changes without adversely affecting the construction project’s total completion time. Repetitive planning and scheduling methods are more effective and essential. However, they need continuous development because of the evolution of execution methods, essent</p> ... Show More
View Publication
Crossref (3)
Clarivate Crossref
Publication Date
Thu Feb 01 2024
Journal Name
Journal Of Engineering
Public Procurement Crisis of Iraq and its Impact on Construction Projects
...Show More Authors

 

The public procurement crisis in Iraq plays a fundamental role in the delay in the implementation of construction projects at different stages of project bidding (pre, during, and after). The procurement system of any country plays an important role in economic growth and revival. The paper aims to use the fuzzy logic inference model to predict the impact of the public procurement crisis (relative importance index and Likert scale) was carried out at the beginning to determine the most important parameters that affect construction projects, the fuzzy analytical hierarchy process (FAHP) to set up, and finally, the fuzzy decision maker's (FDM) verification of the parameter for comparison with reality. Sixty-five

... Show More
View Publication Preview PDF
Crossref
Publication Date
Wed Jun 01 2016
Journal Name
Journal Of Engineering
Application of Total Quality Management (TQM) Requirements in Risk Management in Construction Projects in Iraq
...Show More Authors

Total quality management  considers one of the modern scientific entrances  which practiced by productivity service organizations alike to provide appropriate quality required outputs according to the needs and desires of customers manage , enable the organization seeking to continue and grow in light of the increasing competition from the satisfy and provide the appropriate total quality management requirements whenever led to face risks that they may have  in a manner in which they can be addressed and find ways to avoid them in the future when repeated.                          &n

... Show More
View Publication Preview PDF
Publication Date
Fri Oct 26 2018
Journal Name
Journal Of Planner And Development
Alternative Methods for Decreasing Infrastructure Deficiencies in Iraq
...Show More Authors

View Publication Preview PDF
Publication Date
Tue Nov 01 2016
Journal Name
Journal Of Economics And Administrative Sciences
Evaluation of projects during the trial operation period in accordance with the cost, quality and time - applied research in the Directorate-General for the distribution
...Show More Authors

Research includes evaluation of projects implemented and which entered into trial operation period in accordance with the evaluation criteria and of (cost, quality and time) to determine the size deviations gap for the sample of projects during the years of assessment (2011-2012-2013-2014) of each of the three evaluation criteria, and then followed by a calculation the size of the overall gap to the problem based on the research problem to determine deviations from the specific implementation of each project by answering several questions to answer turns out the reasons for these deviations occur.

The importance of research Focus on the evaluation of received projects from contractors executing the projec

... Show More
View Publication Preview PDF
Crossref
Publication Date
Thu Feb 01 2024
Journal Name
Journal Of Engineering
Improving Building Information Modeling (BIM) Implementation throughout the Construction Industry
...Show More Authors

Building Information Modeling (BIM) is extensively used in the construction industry due to its benefits throughout the Project Life Cycle (PLC). BIM can simulate buildings throughout PLC, detect and resolve problems, and improve building visualization that contributes to the representation of actual project details in the construction stage. BIM contributes to project management promotion by detecting problems that lead to conflicts, cost overruns, and time delays. This work aims to implement an effective BIM for the Iraqi construction projects’ life cycle. The methodology used is a literature review to collect the most important factors contributing to the success of BIM implementation, interview the team of the Cent

... Show More
View Publication Preview PDF
Crossref
Publication Date
Mon Feb 08 2021
Journal Name
Public Works Management &amp; Policy
Causes of Problems in Post-Disaster Emergency Re-Construction Projects—Iraq as a Case Study
...Show More Authors

This study examines the causes of time delays and cost overruns in a selection of thirty post-disaster reconstruction projects in Iraq. Although delay factors have been studied in many countries and contexts, little data exists from countries under the conditions characterizing Iraq during the last 10-15 years. A case study approach was used, with thirty construction projects of different types and sizes selected from the Baghdad region. Project data was gathered from a survey which was used to build statistical relationships between time and cost delay ratios and delay factors in post disaster projects. The most important delay factors identified were contractor failure, redesigning of designs/plans and change orders, security is

... Show More
View Publication
Scopus (16)
Crossref (17)
Scopus Clarivate Crossref
Publication Date
Tue Dec 01 2015
Journal Name
Journal Of Engineering
Operation of the Iraqi Part of Al-Huweizah Marsh
...Show More Authors

Al-Huweizah Marsh is considered as the largest in Iraq. This research aims to maintain thesustainability of Al-Huweizah Marsh under all circumstances and within the limits of the
available natural resources from the Iraqi side and the absence of feeding from the Iranian sidedue to the recent Iranian separation dike along the international boundaries within the marsh.
Twelve scenarios have been suggested as a first step to restore the whole marsh. But the
uncontrolled Iranian feeders and exiguity of their discharges recently, it was necessary to studyonly the northern part of the marsh as an alternative case to ensure reasonable amounts of waterfor the purpose of maintaining and restore the marsh. Hydrological routing model was

... Show More
View Publication Preview PDF
Publication Date
Tue Dec 01 2015
Journal Name
Journal Of Engineering
Valuation the Impact of Risks on the Goals and the Safety of Construction Projects in Iraq
...Show More Authors

Construction projects have a special nature and affect them many factors making them exposed to multiple risks as a result of the length of the implementation period and the multiplicity of stages, starting from the decision stage through implementation until the final delivery, which leads to increased uncertainty and the likelihood of risk.
The process of analysis and risk management is one of the effective and productive methods that are used in managing the construction projects for the purpose of increasing the chances of ending the project successfully in terms of cost, time and quality and at the lowest possible problems.

The research aims first to the effective planning for analysis and risk managemen

... Show More