Preferred Language
Articles
/
tBfk544BVTCNdQwCT1lL
Suitability of Iraqi legal system for building operation transfer contract in infrastructure construction projects
...Show More Authors

Scopus Crossref
View Publication
Publication Date
Fri Apr 30 2021
Journal Name
Iraqi Journal Of Science
The Suitability of Tigris River Sediments from Tikrit, Northern Iraq, for Concrete Production and Road Construction Purposes
...Show More Authors

This study aims to assess the suitability of the sediments present in Tigris River, Tikrit city, northern Iraq for concrete production and road building purposes. Representative samples were collected from three selected stations at the study area using the channel modeling method. According to the grain size analysis, the sediments were classified as a type of poorly graded gravels (GP) depending on the unified soil classification system. The true specific gravity of the soil ranged between 2.28 and 2.568. The chemical analysis of the study samples revealed that gypsum content ranged between 0.82 and 1.69 %. Total soluble salts ranged 2.45- 3.87%, the organic matter content ranged 0.14- 0.76%, and the pH value was between 7.73 and 7.38%

... Show More
View Publication Preview PDF
Scopus (1)
Crossref (1)
Scopus Crossref
Publication Date
Tue Aug 20 2019
Journal Name
Political Sciences Journal
Towards completion of state construction : stations in legitimacy of contemporary Iraqi political system
...Show More Authors

The power of the state in Iraq has been influenced by legitimacy, which may have resembled the belt of transmission, affecting the rule of law and social cohesion. The emergence of the political system may have come about as a result of balancing the competing forces within society today as a basis for collective action. The country's march in Iraq was not a result of a series of gradual transitions such as the established ones. For almost a century, there was an extraordinary succession of succession. At each of the three stages of the state there was an internal or external change. They change or disintegrate and others appear. Social and economic conditions may change or the society is exposed to external invasion or our ideas are imp

... Show More
View Publication Preview PDF
Crossref
Publication Date
Sat Dec 02 2023
Journal Name
Journal Of Engineering
The Cost of Technology Transfer in Construction Companies (In Iraq)
...Show More Authors

The construction sector is considered an important and influential pivot in the national economy of any country.  Nations are working to develop this sector, receiving modern and developed techniques. So, this sector can be a carrier or a receiver of modern technologies. The cost of technology transfer between the international companies that sponsor this sector is a matter of great importance, especially since different factors affect the need for this advanced technology. The cost of technology transfer in construction is related to multiple factors presented by Knowledge, equipment, plant, hardware and software. The lack of distinguishing and evaluating the direct and indirect costs in the construction sector during

... Show More
View Publication Preview PDF
Crossref
Publication Date
Tue Aug 15 2023
Journal Name
Al-academy
Automatic operation of the optical system in the theatrical show
...Show More Authors

Theatrical techniques took upon themselves the responsibility of building and organizing the theatrical form for the various forms of performances, and it was the important tool that the show makers could rely on in carrying out the various works at the audio-visual level, and lighting is one of the most important elements of the visual formation of the image in the show, as it is related to the visual process and what it can achieve in operations The contrast that constitutes the aesthetic and intellectual values of the theatrical show, especially since the process of adjusting the element of time and the timings for receiving or delivering, moving, and the movement of the actor is what can determine the rhythm of the scene, which in it

... Show More
View Publication Preview PDF
Crossref
Publication Date
Sat Jan 01 2022
Journal Name
Journal Of The Mechanical Behavior Of Materials
Identification of the main causes of risks in engineering procurement construction projects
...Show More Authors
Abstract<p>Many risks have adverse consequences for construction projects’ objectives such as quality, schedule, and cost. As engineering procurement construction (EPC) contracts gradually become one of the most common types used in implementing major large-scale construction projects, identifying common risk types and analyzing their root causes is important for developing measures to decrease and eliminate future risks in these types of contracts. The information about the main causes of risks was collected <italic>via</italic> well-structured questionnaires addressed to construction sector professionals and preparing lists of main potential risks in EPC/construction projects throu</p> ... Show More
View Publication
Crossref (1)
Crossref
Publication Date
Sat Apr 01 2017
Journal Name
Journal Of Economics And Administrative Sciences
Risk Analysis of Projects Accordance with the Professional Project Management System: A case- Study Mansur Construction Contracting Company here
...Show More Authors

The research aims to identify the risks faced by projects and work on the administration, such as those risks by using professional Project Management System (Project Management Professional) by identifying those risks and their impact on the objectives of the project, if they occur and to provide appropriate responses to Ha.autam search application on the draft Law Faculty port by the General Mansour Construction Contracting company has been using a method personal interview with the heads of departments and project managers in the Al-Mansour and tools descriptive and quantitative analysis as was used (likelihood and impact of risk analysis, Ai_kaoa scheme Sbb- effect, analysis of probability and impact, risk matrix (probability

... Show More
View Publication Preview PDF
Crossref
Publication Date
Thu Oct 01 2020
Journal Name
Green Engineering
Sustainability and recovery project management implementation on construction projects in Iraq
...Show More Authors

Scopus (1)
Scopus
Publication Date
Sat Jan 01 2022
Journal Name
Archives Of Civil Engineeringthis Link Is Disabled
Factors affecting time and cost trade-off in multiple construction projects
...Show More Authors

Scopus (6)
Scopus
Publication Date
Fri Jul 01 2022
Journal Name
Journal Of Engineering
An Applying the Delphi Technique for Eliciting Criteria in Equipment and Materials Used in Highway Construction Projects
...Show More Authors

This article aims to establish and evaluate standards for critical equipment and materials in highway projects in Iraq. Delphi technique has been used to analyze, explore, and discover the main criteria and sub-criteria that affect equipment and materials in highway construction projects in Iraq. To determine the correct response to the criteria presented in this study, a program (IBM, SPSS/V25) was used to assess the main criteria and sub-criteria using the mean score (MS) and standard deviation (SD) technique, as well as to check reliability using Cronbach's alpha factor (α). The experts' qualifications and the extent to which the person is ready to commit are both important factors in panel selection. The design of a

... Show More
View Publication Preview PDF
Crossref (3)
Crossref
Publication Date
Wed Jul 01 2020
Journal Name
Journal Of Engineering
Examining sensitivity of financial performance at construction projects prequalification stage
...Show More Authors

Construction projects are complicated in nature and require many considerations in contractor selection. One of the complicated interactions is that between performance with the project size, and contractor financial status, and size of projects contracted. At the prequalification stage, the financial ‎requirements restrict the ‎contractors to meet minimum limits in financial criteria such as net worth, working capital and ‎annual turnover, etc. In construction projects, however, there are cases when contractors meet these requirements but show low performance in practice. The model used in the study predicts the performance by training of a neural network. The data used in the study are 72 of the most recent roadw

... Show More
View Publication Preview PDF
Crossref