HTH Ahmed Dheyaa Al-Obaidi,", Ali Tarik Abdulwahid', Mustafa Najah Al-Obaidi", Abeer Mundher Ali', eNeurologicalSci, 2023
A cut-off low is a closed low with a low value of geopotential height at the upper atmospheric levels that has been fully detached (cut-off) from the westerly flow and move independently. A cut-off low causes extreme rainfall events in the mid-latitudes regions. The main aim of this paper is to investigate the cut-off low at 500 hPa over Iraq from a synoptic point of view and the behavior of geopotential height at 500 hPa. To examine the association of the cut-off low at 500 hPa with rainfall events across Iraq, two case studies of heavy rainfall events from different times were conducted. The results showed that the cut-off low at 500 hPa with a low value of geopotential height will strengthen the low-pressure system at the surface, lea
... Show MoreThis article showcases the development and utilization of a side-polished fiber optic sensor that can identify altered refractive index levels within a glucose solution through the investigation of the surface Plasmon resonance (SPR) effect. The aim was to enhance efficiency by means of the placement of a 50 nm-thick layer of gold at the D-shape fiber sensing area. The detector was fabricated by utilizing a silica optical fiber (SOF), which underwent a cladding stripping process that resulted in three distinct lengths, followed by a polishing method to remove a portion of the fiber diameter and produce a cross-sectional D-shape. During experimentation with glucose solution, the side-polished fiber optic sensor revealed an adept detection
... Show MoreIn our article, three iterative methods are performed to solve the nonlinear differential equations that represent the straight and radial fins affected by thermal conductivity. The iterative methods are the Daftardar-Jafari method namely (DJM), Temimi-Ansari method namely (TAM) and Banach contraction method namely (BCM) to get the approximate solutions. For comparison purposes, the numerical solutions were further achieved by using the fourth Runge-Kutta (RK4) method, Euler method and previous analytical methods that available in the literature. Moreover, the convergence of the proposed methods was discussed and proved. In addition, the maximum error remainder values are also evaluated which indicates that the propo
... Show MoreThis paper aims to find new analytical closed-forms to the solutions of the nonhomogeneous functional differential equations of the nth order with finite and constants delays and various initial delay conditions in terms of elementary functions using Laplace transform method. As well as, the definition of dynamical systems for ordinary differential equations is used to introduce the definition of dynamical systems for delay differential equations which contain multiple delays with a discussion of their dynamical properties: The exponential stability and strong stability
The introduction and importance of the research included that physical education and its various activities are important for the disabled. The exercise of physical activities by the disabled effectively contributes to raising their level of fitness and reducing diseases caused by lack of movement. Disabled people often suffer from psychological and social problems, and this feeling may be accompanied by a high level of anxiety, a lack of self-esteem and a loss of self-confidence. Psychological adaptation is one of the concepts of sports psychology interconnected with the psychological climate, as the process that the player seeks to meet his demands and needs. Adaptation includes the pursuit of emotional balance between the individual play
... Show MoreIn this paper, two of the local search algorithms are used (genetic algorithm and particle swarm optimization), in scheduling number of products (n jobs) on a single machine to minimize a multi-objective function which is denoted as (total completion time, total tardiness, total earliness and the total late work). A branch and bound (BAB) method is used for comparing the results for (n) jobs starting from (5-18). The results show that the two algorithms have found the optimal and near optimal solutions in an appropriate times.