Genetic algorithms (GA) are a helpful instrument for planning and controlling the activities of a project. It is based on the technique of survival of the fittest and natural selection. GA has been used in different sectors of construction and building however that is rarely documented. This research aimed to examine the utilisation of genetic algorithms in construction project management. For this purpose, the research focused on the benefits and challenges of genetic algorithms, and the extent to which genetic algorithms is utilised in construction project management. Results showed that GA provides an ability of generating near optimal solutions which can be adopted to reduce complexity in project management and resolve difficult problems associated with multi-modal, noisy, high dimensional and discrete functions. However, with a range of benefits, there are multiple challenges as well such as GA can be time consuming to restore the images and may provide partial solution to the problem.
Purpose: To explore whether baseline matrix metalloproteinase (MMP)-8 level in gingival crevicular fluid (GCF) (exposure) can predict the outcome (reduction in probing pocket depth (PPD) (outcome)) of nonsurgical periodontal therapy (NSPT) (manual or ultrasonic or both) in patients with periodontitis (population/problem) after 3 months. Methods: Six databases (PubMed, Cochrane library, ProQuest, Ovid, Scopus, EBSCO) were searched for relevant articles published until 30 July 2021. Retrieved articles were passed through a three-phase filtration process on the basis of the eligibility criteria. The primary outcome was the change in PPD after 3 months. Quality of the selected articles was assessed using Cochrane Risk of Bias tool (RoB2
... Show MoreThe study aims to use the European Excellence Model (EFQM) in assessing the institutional performance of the National Center for Administrative Development and Information Technology in order to determine the gap between the actual reality of the performance of the Center and the standards adopted in the model, in order to know the extent to which the Center seeks to achieve excellence in performance to improve the level of services provided and the adoption of methods Modern and contemporary management in the evaluation of its institutional performance.
The problem of the study was the absence of an institutional performance evaluation system at the centre whereby weaknesses (areas of improvement) and st
... Show MoreThis paper studies the investment project evaluation under the condition of uncertainty. Evaluation of investment project under risk and uncertainty is possible to be carried out through application of various methods and techniques. The best known methods are : Risk-adjusted discount rate , certainty equivalent method , Sensitivity analysis and Simulation method The objective of this study is using the sensitivity analysis in evaluation Glass Bottles project in Anbar province under the condition of risk and uncertainty.
After applying sensitivity analysis we found that the glass bottles project sensitive to the following factors (cash flow, the cost of investment, and the pro
... Show MoreThe principle of rights and duties is part of the reform project of the Commander of the Faithful Ali ibn Abi Talib, to build a state of institutions whose foundations have been built on Quranic rules, a prophetic biography, and his diligence in doing so in accordance with the requirements of interests and evil, and his certainty in determining the most important and important, and research analytical study of speeches Imam Ali and his career, in this study (the principle of rights and duties) of the ruler and the parish because of their role in the reform process, which depends on the demolition and construction together, as it is the responsibility of the ruler to demolish all constructed corrupt and contrary to the principles of Islam
... Show MoreIn this research, the focus was on estimating the parameters on (min- Gumbel distribution), using the maximum likelihood method and the Bayes method. The genetic algorithmmethod was employed in estimating the parameters of the maximum likelihood method as well as the Bayes method. The comparison was made using the mean error squares (MSE), where the best estimator is the one who has the least mean squared error. It was noted that the best estimator was (BLG_GE).
Objective: This study aims to assess the level of nurse's knowledge regarding toxoplasmosis management
in pregnant women.
Methodology: A descriptive analytic study was carried out from January 2012 to March 2012. A sample of
(70)nurses who provide prenatal care to pregnant women at primary health care centers of AL-Adala,ALHindia,AL-Askary,AL-Jamea,AL-Ansar
and AL-Salam in AL-Najaf city. The questionnaire was self-completed
and included questions on sociodemographic characteristics and toxoplasmosis aspects.
Results: The findings of the study indicated that (44.3%) of nurses have moderate level of knowledge.
(32.9%) of nurses was with age ranging from 31-36 years. (74.3%) were male. (52.9%) were secondary
graduate
Heuristic approaches are traditionally applied to find the optimal size and optimal location of Flexible AC Transmission Systems (FACTS) devices in power systems. Genetic Algorithm (GA) technique has been applied to solve power engineering optimization problems giving better results than classical methods. This paper shows the application of GA for optimal sizing and allocation of a Static Compensator (STATCOM) in a power system. STATCOM devices used to increase transmission systems capacity and enhance voltage stability by regulate the voltages at its terminal by controlling the amount of reactive power injected into or absorbed from the power system. IEEE 5-bus standard system is used as an example to illustrate the te
... Show MoreIn the field of construction project management, time and cost are the most important factors to be considered in planning every project, and their relationship is complex. The total cost for each project is the sum of the direct and indirect cost. Direct cost commonly represents labor, materials, equipment, etc.
Indirect cost generally represents overhead cost such as supervision, administration, consultants, and interests. Direct cost grows at an increasing rate as the project time is reduced from its original planned time. However, indirect cost continues for the life of the project and any reduction in project time means a reduction in indirect cost. Therefore, there is a trade-off between the time and cost for completing construc